XML 24 R10.htm IDEA: XBRL DOCUMENT v2.3.0.15
Property and Equipment
9 Months Ended
Sep. 30, 2011
Property and Equipment 
Property and Equipment

5.              Property and Equipment

 

Depreciation and Amortization Expense

 

Depreciation and amortization expense consists of the following:

 

 

 

For the Three Months

 

For the Nine Months

 

 

 

Ended September 30,

 

Ended September 30,

 

 

 

2011

 

2010

 

2011

 

2010

 

 

 

(In thousands)

 

Equipment leased to customers

 

$

180,080

 

$

199,442

 

$

552,097

 

$

630,188

 

Satellites

 

32,087

 

30,544

 

96,265

 

78,426

 

Buildings, furniture, fixtures, equipment and other

 

12,340

 

12,701

 

38,409

 

37,933

 

Total depreciation and amortization

 

$

224,507

 

$

242,687

 

$

686,771

 

$

746,547

 

 

Cost of sales and operating expense categories included in our accompanying Condensed Consolidated Statements of Operations and Comprehensive Income (Loss) do not include depreciation expense related to satellites or equipment leased to customers.

 

Satellites

 

We currently utilize 13 satellites in geostationary orbit approximately 22,300 miles above the equator, six of which we own and depreciate over the useful life of each satellite. We currently utilize capacity on five satellites from EchoStar, which are accounted for as operating leases. See Note 10 for further discussion of our satellite leases with EchoStar. We also lease two satellites from third parties, which are accounted for as capital leases and are depreciated over the shorter of the economic life or the term of the satellite agreement.

 

Operation of our subscription television service requires that we have adequate satellite transmission capacity for the programming we offer.  Moreover, current competitive conditions require that we continue to expand our offering of new programming, particularly by expanding local high-definition (“HD”) coverage and offering more HD national channels.  While we generally have had in-orbit satellite capacity sufficient to transmit our existing channels and some backup capacity to recover the transmission of certain critical programming, our backup capacity is limited.

 

In the event of a failure or loss of any of our satellites, we may need to acquire or lease additional satellite capacity or relocate one of our other satellites and use it as a replacement for the failed or lost satellite. Such a failure could result in a prolonged loss of critical programming or a significant delay in our plans to expand programming as necessary to remain competitive and thus may have a material adverse effect on our business, financial condition and results of operations.

 

Prior to 2011, certain satellites in our fleet experienced anomalies, some of which have had a significant adverse impact on their remaining useful life and/or commercial operation. There can be no assurance that future anomalies will not further impact the remaining useful life and/or commercial operation of any of these satellites. See “Long-Lived Satellite Assets” below for further discussion of evaluation of impairment. There can be no assurance that we can recover critical transmission capacity in the event one or more of our in-orbit satellites were to fail. We do not anticipate carrying insurance for any of the in-orbit satellites that we use, and we will bear the risk associated with any in-orbit satellite failures. Recent developments with respect to certain of our satellites are discussed below.

 

Owned Satellites

 

EchoStar XIV.  EchoStar XIV was designed to meet a minimum 15-year useful life.  During September 2011, we determined that EchoStar XIV experienced a solar array anomaly which reduced the total power available for use by the spacecraft.  While this anomaly did not reduce the estimated useful life of the satellite to less than 15 years or impact commercial operation of the satellite, there can be no assurance that future anomalies will not reduce its useful life or impact its commercial operation.

 

Leased Satellites

 

EchoStar VIII.  EchoStar VIII was designed to operate 32 DBS transponders in the continental United States at approximately 120 watts per channel, switchable to 16 DBS transponders operating at approximately 240 watts per channel.  EchoStar VIII was also designed with spot-beam technology.  This satellite has experienced several anomalies prior to 2011, and during January 2011 the satellite experienced an anomaly, which temporarily disrupted electrical power to some components causing an interruption of broadcast service.  In addition, it has now been determined one of the two on-board computers used to control the satellite failed in connection with this anomaly.  None of these anomalies has impacted the commercial operation or estimated useful life of the satellite.  However, there can be no assurance that this anomaly or any future anomalies will not reduce its useful life or impact its commercial operation.

 

QuetzSat-1.  QuetzSat-1 was launched on September 29, 2011.  During 2008, we entered into a ten-year transponder service agreement with EchoStar which will be accounted for as an operating lease.  We will lease 24 DBS transponders on QuetzSat-1 when the satellite is placed into commercial operation.  QuetzSat-1 is expected to replace EchoStar VIII during the first quarter 2012.  See Note 10 for further discussion.

 

Long-Lived Satellite Assets

 

We evaluate our satellite fleet for impairment as one asset group and test for recoverability whenever events or changes in circumstances indicate that its carrying amount may not be recoverable.  While certain of the anomalies discussed above, and previously disclosed, may be considered to represent a significant adverse change in the physical condition of an individual satellite, based on the redundancy designed within each satellite and considering the asset grouping, these anomalies are not considered to be significant events that would require evaluation for impairment recognition.  Unless and until a specific satellite is abandoned or otherwise determined to have no service potential, the net carrying amount related to the satellite would not be written off.