COMMITMENTS AND CONTINGENCIES
9 Months Ended
Sep. 30, 2022
Commitments and Contingencies Disclosure [Abstract]  
COMMITMENTS AND CONTINGENCIES COMMITMENTS AND CONTINGENCIES
LEGAL PROCEEDINGS
We accrue losses for a legal proceeding when it is probable that a loss has been incurred and the amount of the loss can be reasonably estimated. However, the uncertainties inherent in legal proceedings make it difficult to reasonably estimate the costs and effects of resolving these matters. Accordingly, actual costs incurred may differ materially from amounts accrued, may exceed, and in some cases have exceeded, applicable insurance coverage and could materially adversely affect our business, results of operations, financial condition, cash flows and/or prospects. Unless otherwise indicated, we are unable to reasonably estimate possible losses or a range of losses in excess of any amounts accrued.
At September 30, 2022, loss contingency accruals for legal matters, including associated legal fees and regulatory matters related to the Leak, that are probable and estimable were $245 million for Sempra, including $171 million for SoCalGas. Amounts for Sempra and SoCalGas include $145 million for matters related to the Leak, which we discuss below.
SoCalGas
Aliso Canyon Natural Gas Storage Facility Gas Leak
From October 23, 2015 through February 11, 2016, SoCalGas experienced a natural gas leak from one of the injection-and-withdrawal wells, SS25, at its Aliso Canyon natural gas storage facility in Los Angeles County.
Litigation – Resolved. In September 2021, SoCalGas and Sempra entered into an agreement with counsel to resolve approximately 390 lawsuits including approximately 36,000 plaintiffs (the Individual Plaintiffs) pending against SoCalGas and Sempra related to the Leak (the Individual Plaintiff Litigation) for a payment of up to $1.8 billion.
These cases were coordinated before a single court in the LA Superior Court for pretrial management under a Third Amended Consolidated Master Case Complaint for Individual Actions filed in November 2017. The consolidated complaint asserts causes of action for negligence, negligence per se, private and public nuisance (continuing and permanent), trespass, inverse condemnation, strict liability, negligent and intentional infliction of emotional distress, fraudulent concealment, loss of consortium and wrongful death against SoCalGas and Sempra (the Individual Plaintiff Litigation). The complaint also asserted violations of Proposition 65, which were resolved in January 2022. The consolidated complaint seeks compensatory and punitive damages for personal injuries, lost wages and/or lost profits, property damage and diminution in property value, injunctive relief, costs of future medical monitoring, civil penalties, and attorneys’ fees.
The agreement governing the settlement of the Individual Plaintiff Litigation requires each plaintiff who agrees to participate in the settlement to release all such plaintiff’s claims against SoCalGas, Sempra and their respective affiliates related to the Leak and the Individual Plaintiff Litigation. As of October 31, 2022, over 99% of the Individual Plaintiffs had agreed to participate and submitted valid releases, and SoCalGas had paid $1.79 billion under the agreement. As of October 31, 2022, SoCalGas and Sempra had either not received or not accepted as valid releases from approximately 345 Individual Plaintiffs, approximately 86% of whom had not been located or had failed to respond, according to plaintiffs’ counsel. The Individual Plaintiffs who do not participate in the settlement (the Remaining Individual Plaintiffs) will be able to continue to pursue their claims.
In September 2021, SoCalGas and Sempra entered into an agreement to settle a class action on behalf of persons and businesses who owned or leased real property within a five-mile radius of the well where the Leak occurred for a total amount of $40 million. In April 2022, the LA Superior Court gave final approval of the settlement.
In October 2018 and October 2020, complaints on behalf of five property developers (the Developer Plaintiffs) were filed against SoCalGas and Sempra in connection with the Leak. The complaints alleged causes of action for strict liability, negligence per se, negligence, negligent interference, continuing nuisance, permanent nuisance, inverse condemnation and violation of the California
Unfair Competition Law and California Public Utilities Code section 2106, and sought compensatory, statutory and punitive damages, injunctive relief and attorneys’ fees. In January 2022 and March 2022, SoCalGas and Sempra settled the claims of four of the Developer Plaintiffs and their claims were dismissed. In August 2022, SoCalGas and Sempra settled the claims of the fifth Developer Plaintiff and its claims were dismissed.
Litigation – Unresolved. Four shareholder derivative actions were filed alleging breach of fiduciary duties against certain officers and certain directors of Sempra and/or SoCalGas. Three of the four actions were joined in an Amended Consolidated Shareholder Derivative Complaint filed in the coordinated proceeding in the LA Superior Court, which was dismissed with prejudice in January 2021. The plaintiffs have appealed this dismissal. In the remaining fourth action, the plaintiffs filed an amended complaint in the coordinated proceeding in June 2022.
In addition, the Remaining Individual Plaintiffs referred to above will be able to continue to pursue their claims.
Regulatory Proceedings – Subject to Agreements to Resolve. In June 2019, the CPUC opened an OII (the Leak OII) to investigate and consider, among other things, whether SoCalGas should be sanctioned for the Leak and what damages, fines or other penalties, if any, should be imposed for any violations, unreasonable or imprudent practices or failure to cooperate sufficiently with SED, as well as to determine the amount of various costs incurred by SoCalGas and other parties in connection with the Leak and the ratemaking treatment or other disposition of such costs, which could result in little or no recovery of such costs by SoCalGas. In October 2022, SoCalGas executed a settlement agreement with SED and the Public Advocates Office at the CPUC to resolve all aspects of the Leak OII. The settlement agreement provides for financial penalties, certain costs that SoCalGas will reimburse, a violation of California Public Utilities Code section 451, and costs previously incurred by SoCalGas for which it will not seek recovery from ratepayers, among other provisions. The settlement agreement was filed with and is subject to approval by the CPUC.
Regulatory Proceedings – Unresolved. In February 2017, the CPUC opened a proceeding pursuant to the SB 380 OII to determine the feasibility of minimizing or eliminating the use of the Aliso Canyon natural gas storage facility while still maintaining energy and electric reliability for the region, but excluding issues with respect to air quality, public health, causation, culpability or cost responsibility regarding the Leak. The first phase of the proceeding established a framework for the hydraulic, production cost and economic modeling assumptions for the potential reduction in usage or elimination of the Aliso Canyon natural gas storage facility, as well as evaluating the impacts of reducing or eliminating the Aliso Canyon natural gas storage facility using the established framework and models. The next phase of the proceeding included engaging a consultant to analyze alternative means for meeting or avoiding the demand for the facility’s services if it were eliminated in either the 2027 or 2035 timeframe, and to address potential implementation of alternatives to the Aliso Canyon natural gas storage facility if the CPUC determines that the Aliso Canyon natural gas storage facility should be permanently closed. The CPUC also added all California IOUs as parties to the proceeding and encouraged all load serving entities in the Los Angeles Basin to join the proceeding.
In November 2021, the CPUC issued a decision on the interim range of gas inventory levels at the Aliso Canyon natural gas storage facility, setting an interim range of gas inventory levels of up to 41.16 Bcf. The CPUC may issue future changes to this interim range of authorized gas inventory levels before issuing a final inventory determination within the SB 380 OII proceeding.
At September 30, 2022, the Aliso Canyon natural gas storage facility had a net book value of $923 million. If the Aliso Canyon natural gas storage facility were to be permanently closed or if future cash flows from its operation were otherwise insufficient to recover its carrying value, we may record an impairment of the facility, which could be material, incur materially higher than expected operating costs and/or be required to make material additional capital expenditures (any or all of which may not be recoverable in rates), and natural gas reliability and electric generation could be jeopardized.
Cost Estimate, Insurance and Accounting and Other Impacts. SoCalGas has incurred significant costs related to the Leak, primarily to defend against and settle civil and criminal litigation and regulatory proceedings arising from the Leak; for temporary relocation of community residents; to control the well and stop the Leak; to mitigate the natural gas released; to purchase natural gas to replace what was lost through the Leak; to pay the costs of the government-ordered response to the Leak, including the costs for a root cause analysis; to respond to various government and agency investigations regarding the Leak; and to comply with increased regulation imposed as a result of the Leak. At September 30, 2022, SoCalGas estimates these costs related to the Leak are $3,485 million (the cost estimate), including $1,279 million of costs recoverable from insurance of which $1,269 million of insurance proceeds had been received by SoCalGas through September 30, 2022. Other than insurance for directors’ and officers’ liability, we have exhausted all of our available insurance for this matter. At September 30, 2022, $10 million is recorded as Insurance Receivable for Aliso Canyon Costs, $145 million of the cost estimate is accrued in Reserve for Aliso Canyon Costs and $4 million of the cost estimate is accrued in Deferred Credits and Other on SoCalGas’ and Sempra’s Condensed Consolidated Balance Sheets.
SoCalGas recorded total charges of $122 million ($101 million after tax) and $259 million ($199 million after tax) in the three months and nine months ended September 30, 2022, respectively, and $1.57 billion ($1.13 billion after tax) in the three months and nine months ended September 30, 2021 in Aliso Canyon Litigation and Regulatory Matters on the SoCalGas and Sempra Condensed Consolidated Statements of Operations related to the litigation and regulatory proceedings that we describe above. These charges are included in the cost estimate.
Except for the amounts paid or estimated to settle certain legal and regulatory matters as described above, the cost estimate does not include any amounts necessary to resolve the matters that we describe above in “Litigation – Unresolved” and “Regulatory Proceedings – Unresolved,” threatened litigation, other potential litigation or other costs, in each case to the extent it is not possible to predict at this time the outcome of these actions or reasonably estimate the possible costs or a range of possible costs for damages, restitution, civil or administrative fines or penalties, defense, settlement or other costs or remedies that may be imposed or incurred. Further, we are not able to reasonably estimate the possible loss or a range of possible losses in excess of the amounts accrued. The costs or losses not included in the cost estimate could be significant.
An adverse outcome with respect to (i) any lawsuits by the Remaining Individual Plaintiffs, (ii) the unresolved shareholder derivative actions, (iii) threatened or other potential litigation related to the Leak, (iv) the Leak OII if approval of the negotiated settlement is not subsequently obtained, or (v) the unresolved proceeding pursuant to the SB 380 OII, could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.
Sempra Infrastructure
Energía Costa Azul
We describe below certain land and customer disputes and permit challenges affecting our ECA Regas Facility. Certain of these land disputes involve land on which portions of the ECA LNG liquefaction facilities are proposed to be situated or on which portions of the ECA Regas Facility that would be necessary for the operation of the proposed ECA LNG liquefaction facilities are situated. One or more unfavorable final decisions on these disputes or challenges could materially adversely affect our existing natural gas regasification operations and proposed natural gas liquefaction projects at the site of the ECA Regas Facility and have a material adverse effect on Sempra’s business, results of operations, financial condition, cash flows and/or prospects.
Land Disputes Unresolved. Sempra Infrastructure has been engaged in a long-running land dispute relating to property adjacent to its ECA Regas Facility that allegedly overlaps with land owned by the ECA Regas Facility (the facility, however, is not situated on the land that is the subject of this dispute), as follows:
A claimant to the adjacent property filed complaints in the federal Agrarian Court challenging the refusal of SEDATU in 2006 to issue title to him for the disputed property. In November 2013, the federal Agrarian Court ordered that SEDATU issue the requested title to the claimant and cause it to be registered. Both SEDATU and Sempra Infrastructure challenged the ruling due to lack of notification of the underlying process. In May 2019, a federal court in Mexico reversed the ruling and ordered a retrial, which is pending resolution.
In a separate proceeding, the claimant filed suit to reinitiate an administrative procedure at SEDATU to obtain the property title that was previously dismissed. In April 2021, the Agrarian Court ordered that the administrative procedure be restarted. The proceeding in the Agrarian Court has concluded; however, the administrative procedure at SEDATU may continue if SEDATU decides to reopen the matter.
In addition, four cases involving two adjacent areas of real property on which part of the ECA Regas Facility is situated, each brought by a single plaintiff or her descendants, remain pending against the facility, as follows:
The first disputed area is subject to a claim in the federal Agrarian Court that has been ongoing since 2006, in which the plaintiff seeks to annul the property title for a portion of the land on which the ECA Regas Facility is situated and to obtain possession of a different parcel that allegedly overlaps with the site of the ECA Regas Facility. The proceeding, which seeks an order that SEDATU annul the ECA Regas Facility’s competing property title, was initiated in 2006 and, in July 2021, a decision was issued in favor of the ECA Regas Facility. The plaintiff appealed, and in February 2022, the appellate court confirmed the ruling in favor of the ECA Regas Facility and dismissed the appeal. The plaintiff filed a federal appeal against the appellate court ruling. A ruling from the Federal Collegiate Circuit Court is pending.
The second disputed area is a parcel adjacent to the ECA Regas Facility that allegedly overlaps with land on which the ECA Regas Facility is situated, which is subject to a claim in the federal Agrarian Court and two claims in Mexican civil courts. The ECA Regas Facility first bought the property from the federal government in 2003; however, to resolve an ownership controversy, in 2008, the ECA Regas Facility reached a financial settlement with the plaintiff to eliminate an adverse claim to its title. Nevertheless, the plaintiff sued in 2013 for the nullity of both titles. The Agrarian Court ruled in favor of the plaintiff in May 2021, nullifying the first property title. Sempra Infrastructure appealed the ruling in July 2021. In May 2022, Sempra Infrastructure won the appeal and the plaintiff’s claims were dismissed. The ECA Regas Facility continues to hold the second
property title to the land. The two civil court proceedings, which seek to invalidate the contract by which the ECA Regas Facility purchased for the second time the applicable parcel of land on which the ECA Regas Facility is situated on the grounds that the purchase price was allegedly unfair, are progressing at different stages. In the first civil case, initiated in 2013, the court ruled in favor of the ECA Regas Facility, and the final decision was affirmed on a federal appeal. The descendants of the same plaintiff filed the second civil case in 2019, which was dismissed by the court. However, the dismissal has been appealed, which is pending the appellate court’s ruling. In April 2022, the ECA Regas Facility entered into a settlement agreement with the plaintiff, whereby the plaintiff has agreed to recognize the ECA Regas Facility as the sole owner of the property and waive any current or future rights over the property, or any other properties related to the ECA Regas Facility. The settlement agreement in the first civil case has been approved by the court and the settlement agreement in the second civil case is pending court approval.
Environmental and Social Impact Permits Unresolved. Several administrative challenges are pending before Mexico’s Secretariat of Environment and Natural Resources (the Mexican environmental protection agency) and Federal Tax and Administrative Courts, seeking revocation of the environmental impact authorization issued to the ECA Regas Facility in 2003. These cases generally allege that the conditions and mitigation measures in the environmental impact authorization are inadequate and challenge findings that the activities of the terminal are consistent with regional development guidelines.
In 2018 and 2021, three related claimants filed separate challenges in the federal district court in Ensenada, Baja California in relation to the environmental and social impact permits issued by each of ASEA and SENER to ECA LNG authorizing natural gas liquefaction activities at the ECA Regas Facility, as follows:
In the first case, the court issued a provisional injunction in September 2018. In December 2018, ASEA approved modifications to the environmental permit that facilitate the development of the proposed natural gas liquefaction facility in two phases. In May 2019, the court canceled the provisional injunction. The claimant appealed the court’s decision canceling the injunction but was not successful. The claimant’s underlying challenge to the permits remains pending.
In the second case, the initial request for a provisional injunction was denied. That decision was reversed on appeal in January 2020, resulting in the issuance of a new injunction against the permits that were issued by ASEA and SENER. This injunction has uncertain application absent clarification by the court. The claimants petitioned the court to rule that construction of natural gas liquefaction facilities violated the injunction, and in February 2022, the court ruled in favor of the ECA Regas Facility, holding that the natural gas liquefaction activities did not violate the injunction. The claimants have appealed this ruling.
In the third case, a group of residents filed a complaint in June 2021 against various federal and state authorities alleging deficiencies in the public consultation process for the issuance of the permits. The request for an initial injunction was denied and the claimants have appealed, which is pending the appellate court’s ruling.
Customer Dispute Resolved. In May 2020, the two third-party capacity customers at the ECA Regas Facility, Shell Mexico and Gazprom, asserted that a 2019 update of the general terms and conditions for service at the facility, as approved by the CRE, resulted in a breach of contract by Sempra Infrastructure and a force majeure event. In July 2020, Shell Mexico submitted a request for arbitration of the dispute, and Gazprom joined the proceeding, and a hearing was held in October 2021. The International Court of Arbitration issued a final, non-appealable decision in April 2022 in favor of Sempra Infrastructure dismissing all claims and confirming the contracts remain in force. In August 2022, the International Court of Arbitration issued an additional decision dismissing a request by Shell Mexico and Gazprom to consider additional arguments.
Citing the alleged breach, Shell Mexico stopped making payments under its LNG storage and regasification agreement. Due to nonpayment, Sempra Infrastructure drew against Shell Mexico’s letters of credit provided as payment security until they were fully exhausted in March 2022. In September 2022, Shell Mexico paid its invoices from March 2022 through August 2022, bringing its account to current, resumed paying invoices as they come due, and renewed its letters of credit. Although Gazprom had previously been making regular monthly payments under its LNG storage and regasification agreement, Sempra Infrastructure drew against and fully exhausted Gazprom’s letters of credit in April 2022 due to Gazprom’s non-renewal of such letters of credit as required under the agreement. Gazprom did not pay its invoices from March 2022 through July 2022, so funds drawn from the letters of credit were used to fully offset such nonpayment. In September 2022, Gazprom paid its August 2022 invoice, bringing its account to current, and resumed paying invoices as they come due. Subsequent invoices, if not paid by Gazprom, will be offset by funds drawn from the letters of credit.
In addition to the arbitration proceeding, Shell Mexico also filed constitutional claims against the CRE’s approval of the general terms and conditions for service at the facility and against the issuance of the liquefaction permit. Shell Mexico’s request for an injunction against the general terms and conditions was denied, and the ruling was upheld on appeal. The request for an injunction against the liquefaction permit was denied, and the decision was vacated and remanded on appeal to the First District Court in Administrative Matters, which again denied the injunction. The case on the injunction request was then heard again by the appellate court and was denied, making the decision final.
Sonora Pipeline
Guaymas-El Oro Segment Unresolved. Sempra Infrastructure’s Sonora natural gas pipeline consists of two segments, the Sasabe-Puerto Libertad-Guaymas segment and the Guaymas-El Oro segment. Each segment has its own service agreement with the CFE. In 2015, the Yaqui tribe, with the exception of some members living in the Bácum community, granted its consent and a right-of-way easement agreement for the construction of the Guaymas-El Oro segment of the Sonora natural gas pipeline that crosses its territory. Representatives of the Bácum community filed a legal challenge in Mexican federal court demanding the right to withhold consent for the project, the stoppage of work in the Yaqui territory and damages. In 2016, the judge granted a suspension order that prohibited the construction of such segment through the Bácum community territory. Because the pipeline does not pass through the Bácum community, Sempra Infrastructure did not believe the 2016 suspension order prohibited construction in the remainder of the Yaqui territory. Construction of the Guaymas-El Oro segment was completed, and commercial operations began in May 2017.
Following the start of commercial operations of the Guaymas-El Oro segment, Sempra Infrastructure reported damage to the Guaymas-El Oro segment of the Sonora pipeline in the Yaqui territory that has made that section inoperable since August 2017 and, as a result, Sempra Infrastructure declared a force majeure event. In 2017, an appellate court ruled that the scope of the 2016 suspension order encompassed the wider Yaqui territory, which has prevented Sempra Infrastructure from making repairs to put the pipeline back in service. In July 2019, a federal district court ruled in favor of Sempra Infrastructure and held that the Yaqui tribe was properly consulted and that consent from the Yaqui tribe was properly received. Representatives of the Bácum community appealed this decision, causing the suspension order preventing Sempra Infrastructure from repairing the damage to the Guaymas-El Oro segment of the Sonora pipeline in the Yaqui territory to remain in place until the appeals process is exhausted. In December 2021, the court of appeals referred the matter to Mexico’s Supreme Court. In June 2022, the Supreme Court remanded the case back to the court of appeals for final resolution.
Sempra Infrastructure exercised its rights under the contract, which included seeking force majeure payments for the two-year period such force majeure payments were required to be made, which ended in August 2019.
In July 2019, the CFE filed a request for arbitration generally to nullify certain contract terms that provide for fixed capacity payments in instances of force majeure and made a demand for substantial damages in connection with the force majeure event. In September 2019, the arbitration process ended when Sempra Infrastructure and the CFE reached an agreement to restart natural gas transportation service on the earlier of completion of repair of the damaged pipeline or January 15, 2020, and to modify the tariff structure and extend the term of the contract by 10 years. Subsequently, Sempra Infrastructure and the CFE agreed to extend the service start date multiple times, most recently to November 30, 2022. Under the revised agreement, the CFE will resume making payments only when the damaged section of the Guaymas-El Oro segment of the Sonora pipeline is repaired. If the pipeline is not repaired or the parties do not agree on a new service start date by November 30, 2022, Sempra Infrastructure retains the right to terminate the contract and seek to recover its reasonable and documented costs and lost profits. Discussions with the CFE regarding the future of the pipeline are underway in accordance with a non-binding MOU announced in January 2022 that, among other matters, addresses efforts to restart service on the pipeline. In July 2022, Sempra Infrastructure and the CFE entered into a Shareholders’ Agreement that establishes a framework for a JV between the parties to work on restarting service on the pipeline, including the potential re-routing of a portion of the pipeline. This agreement is subject to a number of conditions to be satisfied before it becomes effective, including regulatory and corporate authorizations.
At September 30, 2022, Sempra Infrastructure had $423 million in PP&E, net, related to the Guaymas-El Oro segment of the Sonora pipeline, which could be subject to impairment if Sempra Infrastructure is unable to make such repairs (which have not commenced) or re-route a portion of the pipeline (which has not been agreed to by the parties, but is subject to negotiation pursuant to a non-binding MOU and a Shareholders’ Agreement, as described above) and resume operations or if Sempra Infrastructure terminates the contract and is unable to obtain recovery, which in each case could have a material adverse effect on Sempra’s business, results of operations, financial condition, cash flows and/or prospects.
Sasabe-Puerto Libertad-Guaymas Segment Resolved. In June 2014, Sempra Infrastructure and a landowner agreed to enter into a voluntary right-of-way easement agreement for the construction and operation of a seven-mile section of the 314-mile Sasabe-Puerto Libertad-Guaymas segment of the Sonora natural gas pipeline on the landowner’s property. However, in 2015, the landowner filed a complaint demanding the easement agreement be nullified. In September 2021, a definitive and non-appealable judgment was issued declaring the easement agreement nullified and ordering the removal of the pipeline from the landowner’s property. The execution of the judgment is suspended as a result of an amparo lawsuit filed by the CFE as an interested third party that did not participate in the litigation. Sempra Infrastructure filed a special judicial action asking the civil court to acknowledge the existence of the easement and to determine the consideration the landowner should receive in exchange for the easement. In July 2022, Sempra Infrastructure and the landowner entered into a new easement agreement approved by the court for the seven-mile section on the landowner’s property, thus bringing this case to definitive conclusion.
Regulatory and Other Actions by the Mexican Government – Unresolved
We describe below certain actions by the Mexican government that could have a material impact on the energy sector in Mexico. Sempra Infrastructure and other parties affected by these resolutions, orders, decrees, regulations and proposed amendments to Mexican law have challenged them by filing amparo and other claims, some of which have been granted injunctive relief. The court-ordered injunctions or suspensions provide temporary relief until Mexico’s federal district court or Supreme Court ultimately resolves the amparo and other claims. An unfavorable decision on one or more of these amparo or other challenges or the potential for extended disputes may impact our ability to operate our facilities at existing levels or at all, may result in increased costs for Sempra Infrastructure and its customers, may adversely affect our ability to develop new projects, may result in decreased revenues and cash flows, and may negatively impact our ability to recover the carrying values of our investments in Mexico, any of which may have a material adverse effect on our business, results of operations, financial condition, cash flows and/or prospects.
Offtakers of Legacy Generation Permits. In October 2020, the CRE approved a resolution to amend the rules for the inclusion of new offtakers of legacy generation and self-supply permits (the Offtaker Resolution), which became effective immediately. The Offtaker Resolution prohibits self-supply permit holders from adding new offtakers that were not included in the original development or expansion plans, making modifications to the amount of energy allocated to the named offtakers, and including load centers that have entered into a supply arrangement under Mexico’s Electricity Industry Law. Don Diego Solar, Border Solar and Ventika are holders of self-supply permits, and the two solar facilities are currently affected by the Offtaker Resolution. In January 2022, Don Diego Solar and Border Solar obtained injunctive relief and a favorable resolution from a Mexican federal district court and the CRE appealed that decision. If Sempra Infrastructure is not able to obtain permanent legal protection for these impacted facilities, Sempra Infrastructure expects it will sell Border Solar’s capacity and a portion of Don Diego Solar’s capacity affected by the Offtaker Resolution into the spot market. Currently, prices in the spot market are higher than the fixed prices in the PPAs that were entered into through self-supply permits, but these markets are subject to significant volatility. At September 30, 2022, Sempra Infrastructure had $13 million in other intangible assets, net, related to these self-supply permits previously granted by the CRE and impacted by the Offtaker Resolution that could be subject to impairment if Sempra Infrastructure is unable to obtain adequate legal protection.
Amendments to Mexico’s Electricity Industry Law. In March 2021, the Mexican government published a decree with amendments to Mexico’s Electricity Industry Law that include some public policy changes, including establishing priority of dispatch for CFE plants over privately owned plants. According to the decree, these amendments were to become effective on March 10, 2021, and SENER, the CRE and CENACE were to have 180 calendar days to modify, as necessary, all resolutions, policies, criteria, manuals and other regulations applicable to the power industry to conform with this decree. However, a Mexican court issued a suspension of the amendments on March 19, 2021. In April 2022, the Mexican Supreme Court resolved an action of unconstitutionality filed by a group of senators against the amended Electricity Industry Law, but the qualified majority of eight votes out of 11 as is required in matters involving constitutionality was not reached and the proceeding was dismissed, which means that the Mexican Supreme Court did not issue a binding precedent and the amended Electricity Industry Law remains in force. Sempra Infrastructure filed three lawsuits against the amendments to the Electricity Industry Law and, in each of them, Sempra Infrastructure obtained a favorable judgment of the first instance in the lower courts, which has been appealed. If the proposed amendments are affirmed by the lower courts or by the Mexican Supreme Court (which in these cases would only require a simple majority vote), the CRE may be required to revoke self-supply permits granted under the former electricity law, which were grandfathered when the new Electricity Industry Law was enacted, under a legal standard that is ambiguous and not well defined under the law.Amendments to Mexico’s Hydrocarbons Law. In May 2021, amendments to Mexico’s Hydrocarbons Law were published and became effective. The amendments grant SENER and the CRE additional powers to suspend and revoke permits related to the midstream and downstream sectors. Suspension of permits will be determined by SENER or the CRE when a danger to national security, energy security, or to the national economy is foreseen. Likewise, new grounds for the revocation of permits are in place if the permit holder (i) carries out its activity with illegally imported products; (ii) fails, on more than one occasion, to comply with the provisions applicable to quantity, quality and measurement of the products; or (iii) modifies the technical conditions of its infrastructure without authorization. Additionally, in the case of existing permits, authorities will revoke those permits that fail to comply with the minimum storage requirements established by SENER or fail to comply with requirements or violate provisions established by the amended Hydrocarbons Law. All the Sempra Infrastructure entities participating in the Mexico hydrocarbons sector filed lawsuits against the initiative to reform the Hydrocarbons Law. In 2021, district courts issued judgments that the amendments do not affect the interests of the companies at this time and, as a result, dismissed the amparo lawsuits, including the lawsuits filed by the Sempra Infrastructure entities. The Sempra Infrastructure entities have appealed these judgments. The Circuit Courts upheld the dismissal of the amparo lawsuits, except one that is pending resolution.
Regulatory and Other Actions by the Mexican Government – Resolved
Transmission Rates for Legacy Generation Facilities. In May 2020, the CRE approved an update to the transmission rates included in legacy renewable and cogeneration energy contracts based on the claim that the legacy transmission rates did not reflect fair and proportional costs for providing the applicable services and, therefore, created inequitable competitive conditions. Three of Sempra Infrastructure’s renewable energy facilities (Don Diego Solar, Border Solar and Ventika) are currently holders of contracts with such legacy rates, and under the terms of these contracts any increases in the transmission rates would be passed through directly to their customers. These renewable energy facilities sought and obtained injunctive relief but were required to guarantee the difference in tariffs. The three facilities obtained favorable resolutions from a lower court and the CRE appealed those decisions, which were definitively affirmed in favor of the Don Diego Solar, Border Solar and Ventika facilities, whereby the injunctions were made permanent, the regulations were declared unconstitutional, and the guarantee was determined to not be required. The resolutions are final.
Proposed Constitutional Reform in Mexico. In September 2021, the President of Mexico presented a constitutional reform initiative with the stated goal of preserving energy security and self-sufficiency, and a continuous supply of electricity to the country’s population, as a condition for guaranteeing national security and the human right to a decent life. The CRE and the National Commission of Hydrocarbons would be dissolved, and their functions would be carried out by SENER. CENACE would be reinstated to the CFE, and the CFE would be responsible for generating, conducting, transforming, distributing and supplying electricity, and would be the only entity allowed to commercialize electric energy in Mexico. Electricity generation permits and contracts for the sale of electricity and RECs to the CFE, including permits at all of Sempra Infrastructure’s operational power generation facilities, would be canceled. The public electricity supply service would be provided exclusively by the CFE, which may acquire up to 46% of required energy from the private sector. Only certain private power plants would be permitted to continue generating electricity and compete to offer the CFE the lowest production costs. On April 17, 2022, the Chamber of Deputies in Mexico rejected the proposed constitutional reform.
Other Litigation – Unresolved
RBS Sempra Commodities
Sempra holds an equity method investment in RBS Sempra Commodities, a limited liability partnership in the process of being liquidated. In 2015, liquidators filed a claim in the High Court of Justice against RBS (now NatWest Markets plc, our partner in the JV) and Mercuria Energy Europe Trading Limited (the Defendants) on behalf of 10 companies (the Liquidating Companies) that engaged in carbon credit trading via chains that included a company that traded directly with RBS SEE, a subsidiary of RBS Sempra Commodities. The claim alleges that the Defendants’ participation in the purchase and sale of carbon credits resulted in the Liquidating Companies’ carbon credit trading transactions creating a VAT liability they were unable to pay, and that the Defendants are liable to provide for equitable compensation due to dishonest assistance and compensation under the U.K. Insolvency Act of 1986. Trial on the matter was held in June and July of 2018. In March 2020, the High Court of Justice rendered its judgment mostly in favor of the Liquidating Companies and awarded damages of approximately £45 million (approximately $50 million in U.S. dollars at September 30, 2022), plus costs and interest. In October 2020, the High Court of Justice assessed costs and interest to be approximately £21 million (approximately $23 million in U.S. dollars at September 30, 2022) as of that date, with interest continuing to accrue. The Defendants appealed and, in May 2021, the Court of Appeal set aside the High Court of Justice’s decision and ordered a retrial. In July 2022, the Supreme Court of the U.K. denied the Liquidating Companies application for permission to appeal the Court of Appeal’s decision. No date has been scheduled for the retrial. J.P. Morgan Chase & Co., which acquired RBS SEE and later sold it to Mercuria Energy Group, Ltd., previously notified us that Mercuria Energy Group, Ltd. has sought indemnity for the claim, and J.P. Morgan Chase & Co. has in turn sought indemnity from Sempra and RBS.
In the second quarter of 2021, we reduced our estimate of our obligations to settle pending VAT matters and related legal costs by $50 million in Equity Earnings on Sempra’s Condensed Consolidated Statement of Operations based on the settlement with Her Majesty’s Revenue and Customs (U.K.’s Revenue and Customs Department) on the First-Tier Tribunal case and revised assumptions on the High Court of Justice case.
Asbestos Claims Against EFH Subsidiaries
Certain EFH subsidiaries that we acquired as part of the merger of EFH with an indirect subsidiary of Sempra were defendants in personal injury lawsuits brought in state courts throughout the U.S. These cases alleged illness or death as a result of exposure to asbestos in power plants designed and/or built by companies whose assets were purchased by predecessor entities to the EFH subsidiaries, and generally assert claims for product defects, negligence, strict liability and wrongful death. They sought compensatory and punitive damages. As of October 31, 2022, two lawsuits are pending. Additionally, in connection with a December 2015 deadline in the EFH bankruptcy proceeding, approximately 28,000 proofs of claim were filed on behalf of
persons who allege exposure to asbestos under similar circumstances and assert the right to file such lawsuits in the future. None of these claims or lawsuits were discharged in the EFH bankruptcy proceeding. The costs to defend or resolve these lawsuits and the amount of damages that may be imposed or incurred could have a material adverse effect on Sempra’s results of operations, financial condition, cash flows and/or prospects.
Ordinary Course Litigation
We are also defendants in ordinary routine litigation incidental to our businesses, including personal injury, employment litigation, product liability, property damage and other claims. Juries have demonstrated an increasing willingness to grant large awards, including punitive damages, in these types of cases.
LEASES
We discuss leases further in Note 16 of the Notes to Consolidated Financial Statements in the Annual Report.
Lessee Accounting
We have operating and finance leases for real and personal property (including office space, land, fleet vehicles, machinery and equipment, warehouses and other operational facilities) and PPAs with renewable energy, energy storage and peaker plant facilities.
In September 2022, SDG&E amended its lease agreement for its corporate facility to extend the lease termination date from December 2024 to January 2034. SDG&E recognized the remeasurement of its right-of-use asset and total operating lease liability based on its incremental borrowing rate at the effective date of the modification, which increased these amounts by $59 million. As a result of this modification, undiscounted lease payments decreased by $9 million in 2023, increased by $10 million in each of 2025 and 2026 and increased by $80 million thereafter.
SDG&E entered into an energy storage tolling agreement that commenced in August 2022 and expires in July 2032. SDG&E recorded an operating lease right-of-use asset and operating lease liability of $28 million. Undiscounted lease payments are $1 million in 2022, $4 million in each of 2023 through 2026 and $18 million thereafter.
Leases That Have Not Yet Commenced
SDG&E has entered into two energy storage tolling agreements, of which SDG&E expects one will commence in the fourth quarter of 2022 and one will commence in the second half of 2023. SDG&E expects the future minimum lease payments to be $1 million in 2022, $14 million in each of 2023 through 2026 and $87 million thereafter until expiration from 2032 through 2033.
SoCalGas has entered into a fleet vehicle agreement, under which SoCalGas expects leases will commence in the fourth quarter of 2022 through the fourth quarter of 2023. SoCalGas expects the future minimum lease payments to be $2 million in each of 2023 through 2026 and $10 million thereafter until expiration at various dates from 2030 through 2031.
Lessor Accounting
Sempra Infrastructure is a lessor for certain of its natural gas and ethane pipelines, compressor stations, liquid petroleum gas storage facilities, a rail facility and liquid fuels terminals, which we account for as operating or sales-type leases.
We provide information below for leases for which we are the lessor.
LESSOR INFORMATION ON THE CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS – SEMPRA
(Dollars in millions)
Three months ended September 30,Nine months ended September 30,
2022202120222021
Sales-type leases:
Income recognized at lease commencement
$— $16 $— $16 
Interest income
Total revenues from sales-type leases(1)
$$18 $$18 
Operating leases:
Fixed lease payments$71 $80 $211 $192 
Variable lease payments
Total revenues from operating leases(1)
$74 $82 $218 $195 
Depreciation expense$14 $13 $41 $35 
(1)    Included in Revenues: Energy-Related Businesses on the Condensed Consolidated Statements of Operations.
CONTRACTUAL COMMITMENTS
We discuss below significant changes in the first nine months of 2022 to contractual commitments discussed in Notes 1 and 16 of the Notes to Consolidated Financial Statements in the Annual Report.
LNG Purchase Agreement
Sempra Infrastructure has an SPA for the supply of LNG to the ECA Regas Facility. The commitment amount is calculated using a predetermined formula based on estimated forward prices of the index applicable from 2022 to 2029. Although this agreement specifies a number of cargoes to be delivered, under its terms, the supplier may divert certain cargoes, which would reduce amounts paid under the agreement by Sempra Infrastructure. At September 30, 2022, we expect the commitment amount to decrease by $351 million in 2022 and increase by $340 million in 2023, $257 million in 2024, $241 million in 2025, $214 million in 2026 and $501 million thereafter (through contract termination in 2029) compared to December 31, 2021, reflecting changes in estimated forward prices since December 31, 2021 and actual transactions for the first nine months of 2022. These LNG commitment amounts are based on the assumption that all LNG cargoes, less those already confirmed to be diverted, under the agreement are delivered. Actual LNG purchases in the current and prior years have been significantly lower than the maximum amount provided under the agreement due to the supplier electing to divert cargoes as allowed by the agreement.
ENVIRONMENTAL ISSUES
We disclose any proceeding under environmental laws to which a government authority is a party when the potential monetary sanctions, exclusive of interest and costs, exceed the lesser of $1 million or 1% of current assets, which was $45 million for Sempra, $18 million for SDG&E and $13 million for SoCalGas at September 30, 2022.