Commitments and Contingencies COMMITMENTS AND CONTINGENCIES
LEGAL PROCEEDINGS
We accrue losses for a legal proceeding when it is probable that a loss has been incurred and the amount of the loss can be reasonably estimated. However, the uncertainties inherent in legal proceedings make it difficult to reasonably estimate the costs and effects of resolving these matters. Accordingly, actual costs incurred may differ materially from amounts accrued, may exceed, and in some cases have exceeded, applicable insurance coverage and could materially adversely affect our business, results of operations, financial condition, cash flows and/or prospects. Unless otherwise indicated, we are unable to reasonably estimate possible losses or a range of losses in excess of any amounts accrued.
At March 31, 2022, loss contingency accruals for legal matters, including associated legal fees and regulatory matters related to the Leak, that are probable and estimable were $2,167 million for Sempra, including $13 million for SDG&E and $2,078 million for SoCalGas. Amounts for Sempra and SoCalGas include $2,053 million for matters related to the Leak, which we discuss below.
SoCalGas
Aliso Canyon Natural Gas Storage Facility Gas Leak
From October 23, 2015 through February 11, 2016, SoCalGas experienced a natural gas leak from one of the injection-and-withdrawal wells, SS25, at its Aliso Canyon natural gas storage facility in Los Angeles County. As described below, numerous lawsuits, investigations and regulatory proceedings have been initiated in response to the Leak, resulting in significant costs, which together with other Leak-related costs are discussed below in “Cost Estimate, Accounting Impact and Insurance.”
Civil Litigation – Litigation Subject to Agreements to Resolve. As of April 29, 2022, approximately 390 lawsuits including approximately 36,000 plaintiffs (the Individual Plaintiffs) were pending against SoCalGas and Sempra related to the Leak. All these cases are coordinated before a single court in the LA Superior Court for pretrial management.
In November 2017, in the coordinated proceeding, a Third Amended Consolidated Master Case Complaint for Individual Actions was filed on behalf of the Individual Plaintiffs, through which their separate lawsuits are managed for pretrial purposes. The consolidated complaint asserts causes of action for negligence, negligence per se, private and public nuisance (continuing and permanent), trespass, inverse condemnation, strict liability, negligent and intentional infliction of emotional distress, fraudulent concealment, loss of consortium and wrongful death against SoCalGas and Sempra (the Individual Plaintiff Litigation). The complaint also asserted violations of Proposition 65, which were resolved in January 2022. The consolidated complaint seeks compensatory and punitive damages for personal injuries, lost wages and/or lost profits, property damage and diminution in property value, injunctive relief, costs of future medical monitoring, civil penalties, and attorneys’ fees.
In October 2018 and January 2019, complaints were filed on behalf of 51 firefighters stationed near the Aliso Canyon natural gas storage facility who allege they were injured by exposure to chemicals released during the Leak. The complaints against SoCalGas and Sempra assert causes of actions for negligence, negligence per se, private and public nuisance (continuing and permanent), trespass, inverse condemnation, strict liability, negligent and intentional infliction of emotional distress, fraudulent concealment and loss of consortium. The complaints seek compensatory and punitive damages for personal injuries, lost wages and/or lost profits, property damage and diminution in property value, and attorneys’ fees. These complaints are included in the coordinated proceeding and the Individual Plaintiff Litigation.
On September 26, 2021, SoCalGas and Sempra entered into an agreement with counsel representing over 80% of the plaintiffs in the Individual Plaintiff Litigation to resolve the claims of all Individual Plaintiffs for a payment of up to $1.8 billion. The agreement is subject to acceptance by no fewer than roughly 97% of all plaintiffs in the Individual Plaintiff Litigation by June 1, 2022, although SoCalGas and Sempra have the right to waive such condition. The agreement, which requires each plaintiff who accepts a settlement to release all such plaintiff’s claims against SoCalGas, Sempra and their respective affiliates related to the Individual Plaintiff Litigation and the Leak, provides that the settlement amount will be reduced based on the number of plaintiffs who do not accept. The LA Superior Court has approved the process to allocate payments among the plaintiffs. The plaintiffs who do not agree to participate in the settlement will be able to continue to pursue their claims. Pursuant to the agreement, the Individual Plaintiff Litigation has been stayed.
In January 2017, a putative class of persons and businesses who own or lease real property within a five-mile radius of the well filed a consolidated class action complaint against SoCalGas and Sempra (the Property Class Action). The Property Class Action asserts claims for strict liability for ultra-hazardous activities, negligence, negligence per se, violation of the California Unfair Competition Law, trespass, permanent and continuing public and private nuisance, and inverse condemnation.
On September 26, 2021, SoCalGas and Sempra entered into an agreement to settle the Property Class Action for a total amount of $40 million. In April 2022, the LA Superior Court gave final approval of the settlement, which provides for a release of SoCalGas, Sempra and their respective affiliates from all claims related to the Leak by all property class members who do not opt out of the class. Members of the property class who opt out of the settlement will have the right to pursue their claims on an individual basis.
Complaints on behalf of five property developers (the Developer Plaintiffs) were filed in October 2018 and October 2020 against SoCalGas and Sempra alleging causes of action for strict liability, negligence per se, negligence, negligent interference, continuing nuisance, permanent nuisance, inverse condemnation and violation of the California Unfair Competition Law and California Public Utilities Code section 2106. The complaints seek compensatory, statutory and punitive damages, injunctive relief and attorneys’ fees. In January 2022 and March 2022, SoCalGas and Sempra entered into agreements to settle the claims of four of the Developer Plaintiffs.
Civil Litigation Unresolved Litigation. The complaint of one of the Developer Plaintiffs remains pending, and the LA Superior Court has scheduled a trial in October 2022. SoCalGas has engaged in settlement discussions with the remaining Developer Plaintiff.
Four shareholder derivative actions were filed alleging breach of fiduciary duties against certain officers and certain directors of Sempra and/or SoCalGas. Three of the actions were joined in an Amended Consolidated Shareholder Derivative Complaint, which was dismissed with prejudice in January 2021. The plaintiffs have appealed the dismissal. The remaining action was also dismissed but plaintiffs were given leave to amend their complaint.
An adverse ruling in any of the lawsuits in the Individual Plaintiff Litigation filed by plaintiffs who do not agree to settle or any lawsuits filed by property class members who opt out of the Property Class Action settlement or by the remaining Developer Plaintiff could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects. In addition, there can be no assurance that the conditions to resolve the Individual Plaintiff Litigation will be satisfied or that the LA Superior Court will approve the settlement for the Property Class Action.
Regulatory Proceedings. In January 2016, CalGEM and the CPUC directed an independent analysis of the technical root cause of the Leak to be conducted by Blade. In May 2019, Blade released its report, which concluded that the Leak was caused by a failure of the production casing of the well due to corrosion and that attempts to stop the Leak were not effectively conducted, but did not identify any instances of non-compliance by SoCalGas. Blade concluded that SoCalGas’ compliance activities conducted prior to the Leak did not find indications of a casing integrity issue. Blade opined, however, that there were measures, none of which were required by gas storage regulations at the time, that could have been taken to aid in the early identification of corrosion and that, in Blade’s opinion, would have prevented or mitigated the Leak. The report also identified well safety practices and regulations that have since been adopted by CalGEM and implemented by SoCalGas.
In June 2019, the CPUC opened an OII to consider penalties against SoCalGas for the Leak, which it later bifurcated into two phases. The first phase will consider whether SoCalGas violated California Public Utilities Code Section 451 or other laws, CPUC orders or decisions, rules or requirements, whether SoCalGas engaged in unreasonable and/or imprudent practices with respect to its operation and maintenance of the Aliso Canyon natural gas storage facility or its related record-keeping practices, whether SoCalGas cooperated sufficiently with the SED of the CPUC and Blade during the pre-formal investigation, and whether any of the mitigation measures proposed by Blade should be implemented to the extent not already done. The SED, based largely on the Blade report, has alleged a total of 324 violations in the first phase, asserting that SoCalGas violated California Public Utilities Code Section 451 and failed to cooperate in the investigation and to keep proper records. Hearings on a subset of issues began in March 2021, and legal briefs will be filed in May 2022. The second phase will consider whether SoCalGas should be sanctioned for the Leak and what damages, fines or other penalties, if any, should be imposed for any violations, unreasonable or imprudent practices, or failure to cooperate sufficiently with the SED as determined by the CPUC in the first phase. In addition, the second phase will determine the amounts of various costs incurred by SoCalGas and other parties in connection with the Leak and the ratemaking treatment or other disposition of such costs, which could result in little or no recovery of such costs by SoCalGas. SoCalGas has engaged in settlement discussions with the SED in connection with this proceeding.
In February 2017, the CPUC opened a proceeding pursuant to the SB 380 OII to determine the feasibility of minimizing or eliminating the use of the Aliso Canyon natural gas storage facility while still maintaining energy and electric reliability for the region, but excluding issues with respect to air quality, public health, causation, culpability or cost responsibility regarding the Leak. The first phase of the proceeding established a framework for the hydraulic, production cost and economic modeling assumptions for the potential reduction in usage or elimination of the Aliso Canyon natural gas storage facility. Phase 2 of the proceeding, which is evaluating the impacts of reducing or eliminating the Aliso Canyon natural gas storage facility using the established framework and models, began in the first quarter of 2019. In December 2019, the CPUC added a third phase of the proceeding and engaged a consultant who is analyzing alternative means for meeting or avoiding the demand for the facility’s services if it were eliminated in either the 2027 or 2035 timeframe. In July 2021, the CPUC combined Phase 2 and Phase 3 and modified the scope of Phase 3 to also address potential implementation of alternatives to the Aliso Canyon natural gas storage facility if the CPUC determines that the Aliso Canyon natural gas storage facility should be permanently closed. The CPUC also added all California IOUs as parties to the proceeding and encouraged all load serving entities in the Los Angeles Basin to join the proceeding.
In November 2021, the CPUC issued a decision on the interim range of gas inventory levels at the Aliso Canyon natural gas storage facility, setting an interim range of gas inventory levels of up to 41.16 Bcf. The CPUC may issue future changes to this interim range of authorized gas inventory levels before issuing a final inventory determination within the SB 380 OII proceeding.
At March 31, 2022, the Aliso Canyon natural gas storage facility had a net book value of $894 million. If the Aliso Canyon natural gas storage facility were to be permanently closed or if future cash flows from its operation were otherwise insufficient to recover its carrying value, we may record an impairment of the facility, incur higher than expected operating costs and/or be required to make additional capital expenditures (any or all of which may not be recoverable in rates), and natural gas reliability and electric generation could be jeopardized. Any such outcome could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.
Cost Estimate, Accounting Impact and Insurance. SoCalGas has incurred significant costs related to the Leak, primarily for temporary relocation of community residents; to control the well and stop the Leak; to mitigate the natural gas released; to purchase natural gas to replace what was lost through the Leak; to defend against and, in certain cases, settle, civil and criminal litigation arising from the Leak; to pay the costs of the government-ordered response to the Leak, including the costs for Blade to conduct the root cause analysis described above; to respond to various government and agency investigations regarding the Leak; and to comply with increased regulation imposed as a result of the Leak. At March 31, 2022, SoCalGas estimates these costs related to the Leak are $3,314 million (the cost estimate), which includes $1,279 million of costs recovered or probable of recovery from insurance. This cost estimate may increase significantly as more information becomes available. At March 31, 2022, $2,052 million of the cost estimate is accrued in Reserve for Aliso Canyon Costs and $4 million of the cost estimate is accrued in Deferred Credits and Other on SoCalGas’ and Sempra’s Condensed Consolidated Balance Sheets.
In the first quarter of 2022, SoCalGas recorded total charges of $92 million ($66 million after tax), inclusive of estimated legal costs, in Aliso Canyon Litigation and Regulatory Matters on the SoCalGas and Sempra Condensed Consolidated Statements of Operations related to settlement activity in connection with civil litigation that we describe above. This charge is included in the cost estimate that we describe above.
Except for the amounts paid or estimated to settle certain legal and regulatory matters as described above, the cost estimate does not include (i) any amounts necessary to resolve claims of Individual Plaintiffs who do not agree to participate in the settlement of the Individual Actions or members of the Property Class Action who opt out of that settlement or (ii) the matters that we describe above in “Civil Litigation – Unresolved Litigation” and “Regulatory Proceedings” to the extent it is not possible to predict at this time the outcome of these actions or reasonably estimate the possible costs or a range of possible costs for damages, restitution, civil or administrative fines or penalties, defense, settlement or other costs or remedies that may be imposed or incurred. The cost estimate also does not include certain other costs incurred by Sempra associated with defending against shareholder derivative lawsuits and other potential costs that we currently do not anticipate incurring or that we cannot reasonably estimate. Further, we are not able to reasonably estimate the possible loss or a range of possible losses in excess of the amounts accrued. The costs or losses not included in the cost estimate could be significant and could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.
We have received insurance payments for many of the categories of costs included in the cost estimate, including temporary relocation and associated processing costs, control-of-well expenses, costs of the government-ordered response to the Leak, certain legal costs and lost gas. At March 31, 2022, we recorded the expected recovery of the cost estimate related to the Leak of $360 million as Insurance Receivable for Aliso Canyon Costs on SoCalGas’ and Sempra’s Condensed Consolidated Balance Sheets. This amount is exclusive of insurance retentions and $919 million of insurance proceeds we received through March 31, 2022. We intend to pursue the full extent of our insurance coverage for the costs we have incurred. Other than insurance for certain future defense costs we may incur as well as directors’ and officers’ liability, we have exhausted all of our insurance in this matter. We continue to pursue other sources of insurance coverage for costs related to this matter, but we may not be successful in obtaining additional insurance recovery for any of these costs. If we are not able to secure additional insurance recovery, if any costs we have recorded as an insurance receivable are not collected, if there are delays in receiving insurance recoveries, or if the insurance recoveries are subject to income taxes while the associated costs are not tax deductible, such amounts could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.
Sempra Infrastructure
Energía Costa Azul
We describe below certain land and customer disputes and permit challenges affecting our ECA Regas Facility and our proposed ECA LNG liquefaction projects. One or more unfavorable final decisions on these disputes or challenges could materially adversely affect our existing natural gas regasification operations and proposed natural gas liquefaction projects at the site of the ECA Regas Facility and have a material adverse effect on Sempra’s business, results of operations, financial condition, cash flows and/or prospects.
Land Disputes. Sempra Infrastructure has been engaged in a long-running land dispute relating to property adjacent to its ECA Regas Facility that allegedly overlaps with land owned by the ECA Regas Facility (the facility, however, is not situated on the land that is the subject of this dispute), as follows:
A claimant to the adjacent property filed complaints in the federal Agrarian Court challenging the refusal of SEDATU in 2006 to issue title to him for the disputed property. In November 2013, the federal Agrarian Court ordered that SEDATU issue the requested title to the claimant and cause it to be registered. Both SEDATU and Sempra Infrastructure challenged the ruling due to lack of notification of the underlying process. In May 2019, a federal court in Mexico reversed the ruling and ordered a retrial, which is pending resolution.
In a separate proceeding, the claimant filed suit to reinitiate an administrative procedure at SEDATU to obtain the property title that was previously dismissed. In April 2021, the Agrarian Court ordered that the administrative procedure be restarted. The proceeding in the Agrarian Court has concluded; however, the administrative procedure at SEDATU may continue if SEDATU decides to reopen the matter.
In addition, four cases involving two adjacent areas of real property on which part of the ECA Regas Facility is situated, each brought by a single plaintiff or her descendants, remain pending against the facility, as follows:
The first disputed area is subject to a claim in the federal Agrarian Court that has been ongoing since 2006, in which the plaintiff seeks to annul the property title for a portion of the land on which the ECA Regas Facility is situated and to obtain
possession of a different parcel that allegedly overlaps with the site of the ECA Regas Facility. The proceeding, which seeks an order that SEDATU annul the ECA Regas Facility’s competing property title, was initiated in 2006 and, in July 2021, a decision was issued in favor of the ECA Regas Facility. The plaintiff appealed, and in February 2022, the appellate court confirmed the ruling in favor the ECA Regas Facility and dismissed the appeal. The plaintiff filed a final federal appeal against the appellate court ruling. A final ruling from the Federal Collegiate Circuit Court is pending.
The second disputed area is a parcel adjacent to the ECA Regas Facility that allegedly overlaps with land on which the ECA Regas Facility is situated, which is subject to a claim in the federal Agrarian Court and two claims in Mexican civil courts. The ECA Regas Facility first bought the property from the federal government in 2003; however, to resolve an ownership controversy, in 2008, the ECA Regas Facility reached a financial settlement with the plaintiff to eliminate an adverse claim to its title. Nevertheless, the plaintiff sued in 2013 for the nullity of both titles. The Agrarian Court ruled in favor of the plaintiff in May 2021, nullifying the first property title. Sempra Infrastructure appealed the ruling in July 2021, which is pending resolution. The ECA Regas Facility continues to hold the second property title to the land. The two civil court proceedings, which seek to invalidate the contract by which the ECA Regas Facility purchased for the second time the applicable parcel of land on which the ECA Regas Facility is situated on the grounds that the purchase price was allegedly unfair, are progressing at different stages. In the first civil case, initiated in 2013, the court ruled in favor of the ECA Regas Facility, and the final decision was affirmed on a federal appeal. The descendants of the same plaintiff filed the second civil case in 2019, which was dismissed by the court. However, the dismissal has been appealed, which is pending the appellate court’s ruling. In April 2022, the ECA Regas Facility entered into a settlement agreement with the plaintiff, whereby the plaintiff has agreed to recognize the ECA Regas Facility as the sole owner of the property and waive any current or future rights over the property, or any other properties related to the ECA Regas Facility. The settlement agreement is subject to court approval and would definitively resolve all three pending cases.
Certain of these land disputes involve land on which portions of the ECA LNG liquefaction facilities are proposed to be situated or on which portions of the ECA Regas Facility that would be necessary for the operation of the proposed ECA LNG liquefaction facilities are situated.
Environmental and Social Impact Permits. Several administrative challenges are pending before Mexico’s Secretariat of Environment and Natural Resources (the Mexican environmental protection agency) and Federal Tax and Administrative Courts, seeking revocation of the environmental impact authorization issued to the ECA Regas Facility in 2003. These cases generally allege that the conditions and mitigation measures in the environmental impact authorization are inadequate and challenge findings that the activities of the terminal are consistent with regional development guidelines.
In 2018 and 2021, three related claimants filed separate challenges in the federal district court in Ensenada, Baja California in relation to the environmental and social impact permits issued by each of ASEA and SENER to ECA LNG authorizing natural gas liquefaction activities at the ECA Regas Facility, as follows:
In the first case, the court issued a provisional injunction in September 2018. In December 2018, ASEA approved modifications to the environmental permit that facilitate the development of the proposed natural gas liquefaction facility in two phases. In May 2019, the court canceled the provisional injunction. The claimant appealed the court’s decision canceling the injunction, but was not successful. The claimant’s underlying challenge to the permits remains pending.
In the second case, the initial request for a provisional injunction was denied. That decision was reversed on appeal in January 2020, resulting in the issuance of a new injunction against the permits that were issued by ASEA and SENER. This injunction has uncertain application absent clarification by the court. The claimants petitioned the court to rule that construction of natural gas liquefaction facilities violated the injunction, and in February 2022, the court ruled in favor of the ECA Regas Facility, meaning that the natural gas liquefaction activities have not been affected. The claimants have appealed this ruling.
In the third case, a group of residents filed a complaint in June 2021 against various federal and state authorities alleging deficiencies in the public consultation process for the issuance of the permits. The request for an initial injunction was denied and the claimants have appealed, which is pending the appellate court’s ruling.
Customer Dispute. In May 2020, the two third-party capacity customers at the ECA Regas Facility, Shell Mexico and Gazprom, asserted that a 2019 update of the general terms and conditions for service at the facility, as approved by the CRE, resulted in a breach of contract by Sempra Infrastructure and a force majeure event. In July 2020, Shell Mexico submitted a request for arbitration of the dispute and Gazprom joined the proceeding, and a hearing was held in October 2021. The International Court of Arbitration issued a final, non-appealable decision dated April 27, 2022 in favor of Sempra Infrastructure dismissing all claims and confirming the contracts remain in force.
In addition to the arbitration proceeding, Shell Mexico also filed constitutional claims against the CRE’s approval of the general terms and conditions and against the issuance of the liquefaction permit. Shell Mexico’s request for an injunction against the general terms and conditions was denied, and the ruling was upheld on appeal. The request for an injunction against the liquefaction permit was denied, and the decision was vacated and remanded on appeal to the First District Court in Administrative
Matters, which again denied the injunction. The case is now being heard again by the appellate court. A hearing was held on the merits and a decision is pending.
Sonora Pipeline
Guaymas-El Oro Segment. Sempra Infrastructure’s Sonora natural gas pipeline consists of two segments, the Sasabe-Puerto Libertad-Guaymas segment and the Guaymas-El Oro segment. Each segment has its own service agreement with the CFE. In 2015, the Yaqui tribe, with the exception of some members living in the Bácum community, granted its consent and a right-of-way easement agreement for the construction of the Guaymas-El Oro segment of the Sonora natural gas pipeline that crosses its territory. Representatives of the Bácum community filed a legal challenge in Mexican federal court demanding the right to withhold consent for the project, the stoppage of work in the Yaqui territory and damages. In 2016, the judge granted a suspension order that prohibited the construction of such segment through the Bácum community territory. Because the pipeline does not pass through the Bácum community, Sempra Infrastructure did not believe the 2016 suspension order prohibited construction in the remainder of the Yaqui territory. Construction of the Guaymas-El Oro segment was completed, and commercial operations began in May 2017.
Following the start of commercial operations of the Guaymas-El Oro segment, Sempra Infrastructure reported damage to the Guaymas-El Oro segment of the Sonora pipeline in the Yaqui territory that has made that section inoperable since August 2017 and, as a result, Sempra Infrastructure declared a force majeure event. In 2017, an appellate court ruled that the scope of the 2016 suspension order encompassed the wider Yaqui territory, which has prevented Sempra Infrastructure from making repairs to put the pipeline back in service. In July 2019, a federal district court ruled in favor of Sempra Infrastructure and held that the Yaqui tribe was properly consulted and that consent from the Yaqui tribe was properly received. Representatives of the Bácum community appealed this decision, causing the suspension order preventing Sempra Infrastructure from repairing the damage to the Guaymas-El Oro segment of the Sonora pipeline in the Yaqui territory to remain in place until the appeals process is exhausted. In December 2021, the court of appeals referred the matter to Mexico’s Supreme Court.
Sempra Infrastructure exercised its rights under the contract, which included seeking force majeure payments for the two-year period such force majeure payments were required to be made, which ended in August 2019.
In July 2019, the CFE filed a request for arbitration generally to nullify certain contract terms that provide for fixed capacity payments in instances of force majeure and made a demand for substantial damages in connection with the force majeure event. In September 2019, the arbitration process ended when Sempra Infrastructure and the CFE reached an agreement to restart natural gas transportation service on the earlier of completion of repair of the damaged pipeline or January 15, 2020, and to modify the tariff structure and extend the term of the contract by 10 years. Subsequently, Sempra Infrastructure and the CFE agreed to extend the service start date multiple times, most recently to June 14, 2022. Under the revised agreement, the CFE will resume making payments only when the damaged section of the Guaymas-El Oro segment of the Sonora pipeline is repaired. If the pipeline is not repaired by June 14, 2022, and the parties do not agree on a new service start date, Sempra Infrastructure retains the right to terminate the contract and seek to recover its reasonable and documented costs and lost profits. Discussions with the CFE regarding the future of the pipeline, including the potential re-routing of a portion of the pipeline, are underway in accordance with a non-binding MOU announced in January 2022 that, among other matters, addresses efforts to restart service on the pipeline. Sempra Infrastructure intends to enter into a definitive agreement with respect to the pipeline in the second quarter of 2022.
At March 31, 2022, Sempra Infrastructure had $429 million in PP&E, net, related to the Guaymas-El Oro segment of the Sonora pipeline, which could be subject to impairment if Sempra Infrastructure is unable to make such repairs (which have not commenced) or re-route a portion of the pipeline (which has not been agreed to by the parties, but is subject to negotiation pursuant to a non-binding MOU, as described above) and resume operations in the Guaymas-El Oro segment of the Sonora pipeline or if Sempra Infrastructure terminates the contract and is unable to obtain recovery, which in each case could have a material adverse effect on Sempra’s business, results of operations, financial condition, cash flows and/or prospects.
Sasabe-Puerto Libertad-Guaymas Segment. In June 2014, Sempra Infrastructure and a landowner agreed to enter into a voluntary right-of-way easement agreement for the construction and operation of a seven-mile section of the 314-mile Sasabe-Puerto Libertad-Guaymas segment of the Sonora natural gas pipeline on the landowner’s property. However, in 2015, the landowner filed a complaint demanding the easement agreement be nullified. In September 2021, a definitive and non-appealable judgment was issued declaring the easement agreement nullified and ordering the removal of the pipeline from the landowner’s property. The execution of the judgment is suspended as a result of an amparo lawsuit filed by the CFE as an interested third party that did not participate in the litigation. Sempra Infrastructure filed a special judicial action asking the civil court to acknowledge the existence of the easement and to determine the consideration the landowner should receive in exchange for the easement. The failure to stay this judgment pending the resolution of Sempra Infrastructure’s planned special judicial action or prevail in preserving the easement in the special judicial action could require us to modify the route of the pipeline and could require a temporary shutdown of this portion of the pipeline, which could have a material adverse effect on Sempra’s business, results of operations, financial condition, cash flows and/or prospects.
Regulatory and Other Actions by the Mexican Government
We describe below certain actions by the Mexican government that could have a material impact on the energy sector in Mexico. Sempra Infrastructure and other parties affected by these resolutions, orders, decrees, regulations and proposed amendments to Mexican law have challenged them by filing amparo and other claims, some of which have been granted injunctive relief. The court-ordered injunctions or suspensions provide temporary relief until Mexico’s federal district court or Supreme Court ultimately resolves the amparo and other claims. An unfavorable decision on one or more of these amparo or other challenges or the potential for extended disputes may impact our ability to operate our facilities at existing levels or at all, may result in increased costs for Sempra Infrastructure and its customers, may adversely affect our ability to develop new projects, may result in decreased revenues and cash flows, and may negatively impact our ability to recover the carrying values of our investments in Mexico, any of which may have a material adverse effect on our business, results of operations, financial condition, cash flows and/or prospects.
Transmission Rates for Legacy Generation Facilities. In May 2020, the CRE approved an update to the transmission rates included in legacy renewable and cogeneration energy contracts based on the claim that the legacy transmission rates did not reflect fair and proportional costs for providing the applicable services and, therefore, created inequitable competitive conditions. Three of Sempra Infrastructure’s renewable energy facilities (Don Diego Solar, Border Solar and Ventika) are currently holders of contracts with such legacy rates, and under the terms of these contracts any increases in the transmission rates would be passed through directly to their customers. These renewable energy facilities sought and obtained injunctive relief but were required to guarantee the difference in tariffs. The three facilities obtained favorable resolutions from a lower court and the CRE appealed those decisions, which were definitively affirmed in favor of the Don Diego Solar, Border Solar and Ventika facilities, whereby the injunctions were made permanent, the regulations were declared unconstitutional, and the guarantee was determined to not be required. The resolution is definitive and final.
Offtakers of Legacy Generation Permits. In October 2020, the CRE approved a resolution to amend the rules for the inclusion of new offtakers of legacy generation and self-supply permits (the Offtaker Resolution), which became effective immediately. The Offtaker Resolution prohibits self-supply permit holders from adding new offtakers that were not included in the original development or expansion plans, making modifications to the amount of energy allocated to the named offtakers, and including load centers that have entered into a supply arrangement under Mexico’s Electricity Industry Law. Don Diego Solar, Border Solar and Ventika are holders of self-supply permits and are impacted by the Offtaker Resolution. In January 2022, Don Diego Solar and Border Solar obtained a favorable resolution from a Mexican federal district court and the CRE appealed that decision. If Sempra Infrastructure is not able to obtain legal protection for these impacted facilities, Sempra Infrastructure expects it will sell Border Solar’s capacity and a portion of Don Diego Solar’s capacity affected by the Offtaker Resolution into the spot market. Currently, prices in the spot market are significantly lower than the fixed prices in the PPAs that were entered into through self-supply permits. At March 31, 2022, Sempra Infrastructure had $14 million in other intangible assets, net, related to these self-supply permits previously granted by the CRE and impacted by the Offtaker Resolution that could be subject to impairment if Sempra Infrastructure is unable to obtain adequate legal protection. Sempra Infrastructure has filed lawsuits against the Offtaker Resolution and received injunctive relief pending final resolution.Amendments to Mexico’s Electricity Industry Law. In March 2021, the Mexican government published a decree with amendments to Mexico’s Electricity Industry Law that include some public policy changes, including establishing priority of dispatch for CFE plants over privately owned plants. According to the decree, these amendments were to become effective on March 10, 2021, and SENER, the CRE and CENACE were to have 180 calendar days to modify, as necessary, all resolutions, policies, criteria, manuals and other regulations applicable to the power industry to conform with this decree. However, a Mexican court issued a suspension of the amendments on March 19, 2021. On April 7, 2022, the Mexican Supreme Court resolved an action of unconstitutionality filed by a group of senators against the amended Electricity Industry Law, however the qualified majority of eight votes out of 11 as is required in matters involving constitutionality was not reached and the proceeding was dismissed, which means that the Mexican Supreme Court did not issue a binding precedent and the amended Electricity Industry Law will remain in force. Therefore, the amparo lawsuits filed against the amendments to the Electricity Industry Law will continue individually and will be decided case by case in lower courts, with each court free to make its own decision. If the proposed amendments are affirmed by the lower courts or by the Mexican Supreme Court (which in these cases would only require a simple majority vote), the CRE may be required to revoke self-supply permits granted under the former electricity law, which were grandfathered when the new Electricity Industry Law was enacted, under a legal standard that is ambiguous and not well defined under the law.Amendments to Mexico’s Hydrocarbons Law. In May 2021, amendments to Mexico’s Hydrocarbons Law were published and became effective. The amendments grant SENER and the CRE additional powers to suspend and revoke permits related to the midstream and downstream sectors. Suspension of permits will be determined by SENER or the CRE when a danger to national security, energy security, or to the national economy is foreseen. Likewise, new grounds for the revocation of permits are in place if the permit holder (i) carries out its activity with illegally imported products; (ii) fails, on more than one occasion, to comply with the provisions applicable to quantity, quality and measurement of the products; or (iii) modifies the technical conditions of its infrastructure without authorization. Additionally, in the case of existing permits, authorities will revoke those permits that fail to comply with the minimum storage requirements established by SENER or fail to comply with requirements or violate provisions established by the amended Hydrocarbons Law. All the Sempra Infrastructure entities participating in the Mexico hydrocarbons sector filed lawsuits against the initiative to reform the Hydrocarbons Law. In 2021, district courts issued judgments that the amendments do not affect the interests of the companies at this time and, as a result, dismissed the amparo lawsuits including the lawsuits filed by Sempra Infrastructure entities. The Sempra Infrastructure entities have appealed these judgments.Proposed Constitutional Reform in Mexico. In September 2021, the President of Mexico presented a constitutional reform initiative with the stated goal of preserving energy security and self-sufficiency, and a continuous supply of electricity to the country’s population, as a condition for guaranteeing national security and the human right to a decent life. The CRE and the National Commission of Hydrocarbons would be dissolved, and their functions would be carried out by SENER. CENACE would be reinstated to the CFE, and the CFE would be responsible for generating, conducting, transforming, distributing and supplying electricity, and would be the only entity allowed to commercialize electric energy in Mexico. Electricity generation permits and contracts for the sale of electricity and RECs to the CFE, including permits at all of Sempra Infrastructure’s operational power generation facilities, would be canceled. The public electricity supply service would be provided exclusively by the CFE, which may acquire up to 46% of required energy from the private sector. Only certain private power plants would be permitted to continue generating electricity and compete to offer the CFE the lowest production costs. On April 17, 2022, the Chamber of Deputies in Mexico rejected the proposed constitutional reform.
Other Litigation
RBS Sempra Commodities
Sempra holds an equity method investment in RBS Sempra Commodities, a limited liability partnership in the process of being liquidated. In 2015, liquidators filed a claim in the High Court of Justice against RBS (now NatWest Markets plc, our partner in the JV) and Mercuria Energy Europe Trading Limited (the Defendants) on behalf of 10 companies (the Liquidating Companies) that engaged in carbon credit trading via chains that included a company that traded directly with RBS SEE, a subsidiary of RBS Sempra Commodities. The claim alleges that the Defendants’ participation in the purchase and sale of carbon credits resulted in the Liquidating Companies’ carbon credit trading transactions creating a VAT liability they were unable to pay, and that the Defendants are liable to provide for equitable compensation due to dishonest assistance and for compensation under the U.K. Insolvency Act of 1986. Trial on the matter was held in June and July of 2018. In March 2020, the High Court of Justice rendered its judgment mostly in favor of the Liquidating Companies and awarded damages of approximately £45 million (approximately $59 million in U.S. dollars at March 31, 2022), plus costs and interest. In October 2020, the High Court of Justice assessed costs and interest to be approximately £21 million (approximately $28 million in U.S. dollars at March 31, 2022) as of that date, with interest continuing to accrue. The Defendants appealed and, in May 2021, the Court of Appeal set aside the High Court of Justice’s decision and ordered a retrial. The Liquidating Companies in the High Court of Justice case have applied to the Supreme Court for permission to appeal the Court of Appeals’ decision. J.P. Morgan Chase & Co., which previously acquired RBS SEE and later sold it to Mercuria Energy Group, Ltd., has notified us that Mercuria Energy Group, Ltd. has sought indemnity for the claim, and J.P. Morgan Chase & Co. has in turn sought indemnity from Sempra and RBS.
Asbestos Claims Against EFH Subsidiaries
Certain EFH subsidiaries that we acquired as part of the merger of EFH with an indirect subsidiary of Sempra were defendants in personal injury lawsuits brought in state courts throughout the U.S. These cases alleged illness or death as a result of exposure to asbestos in power plants designed and/or built by companies whose assets were purchased by predecessor entities to the EFH subsidiaries, and generally assert claims for product defects, negligence, strict liability and wrongful death. They sought compensatory and punitive damages. As of April 29, 2022, no lawsuits are pending. Additionally, in connection with the EFH bankruptcy proceeding, approximately 28,000 proofs of claim were filed on behalf of persons who allege exposure to asbestos under similar circumstances and assert the right to file such lawsuits in the future. None of these claims or lawsuits were discharged in the EFH bankruptcy proceeding. The costs to defend or resolve these lawsuits and the amount of damages that may be imposed or incurred could have a material adverse effect on Sempra’s results of operations, financial condition, cash flows and/or prospects.
Ordinary Course Litigation
We are also defendants in ordinary routine litigation incidental to our businesses, including personal injury, employment litigation, product liability, property damage and other claims. Juries have demonstrated an increasing willingness to grant large awards, including punitive damages, in these types of cases.
LEASES
We discuss leases further in Note 16 of the Notes to Consolidated Financial Statements in the Annual Report.
A lease exists when a contract conveys the right to control the use of an identified asset for a period of time in exchange for consideration. We determine if an arrangement is or contains a lease at inception of the contract.
Some of our lease agreements contain nonlease components, which represent activities that transfer a separate good or service to the lessee. As the lessee for both operating and finance leases, we have elected to combine lease and nonlease components as a single lease component for real estate, fleet vehicles, power generating facilities, and pipelines, whereby fixed or in-substance fixed payments allocable to the nonlease component are accounted for as part of the related lease liability and ROU asset. As the lessor, we have elected to combine lease and nonlease components as a single lease component for real estate and liquid fuels terminals.
Lessee Accounting
We have operating and finance leases for real and personal property (including office space, land, fleet vehicles, machinery and equipment, warehouses and other operational facilities) and PPAs with renewable energy, energy storage and peaker plant facilities.
Leases That Have Not Yet Commenced
SDG&E has entered into three energy storage tolling agreements, of which SDG&E expects two will commence in the third quarter of 2022 and one will commence in the second quarter of 2023. SDG&E expects the future minimum lease payments to be $8 million in 2022, $17 million in 2023, $18 million in each of 2024 through 2026 and $101 million thereafter until expiration at various dates from 2032 through 2033.
SoCalGas has entered into a fleet vehicle agreement, under which SoCalGas expects leases will commence in the second quarter of 2022 through the first quarter of 2023. SoCalGas expects the future minimum lease payments to be $2 million in each of 2023 through 2026 and $10 million thereafter until expiration at various dates from 2030 through 2031.
Lessor Accounting
Sempra Infrastructure is a lessor for certain of its natural gas and ethane pipelines, compressor stations, liquid petroleum gas storage facilities, a rail facility and liquid fuels terminals, which we account for as operating or sales-type leases.
Generally, we recognize operating lease income on a straight-line basis over the lease term, and sales-type lease income based on the effective interest method over the lease term. Certain of our leases contain rate adjustments or are based on foreign currency exchange rates that may result in lease payments received that vary in amount from one period to the next.
We provide information below for leases for which we are the lessor.
LESSOR INFORMATION ON THE CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS – SEMPRA
(Dollars in millions)
Three months ended March 31,
20222021
Sales-type leases:
Interest income$$— 
Total revenues from sales-type leases(1)
$$— 
Operating leases:
Fixed lease payments$70 $53 
Variable lease payments— 
Total revenues from operating leases(1)
$71 $53 
Depreciation expense$13 $10 
(1)     Included in Revenues: Energy-Related Businesses on the Condensed Consolidated Statements of Operations.
CONTRACTUAL COMMITMENTS
We discuss below significant changes in the first three months of 2022 to contractual commitments discussed in Notes 1 and 16 of the Notes to Consolidated Financial Statements in the Annual Report.
LNG Purchase Agreement
Sempra Infrastructure has a sale and purchase agreement for the supply of LNG to the ECA Regas Facility. The commitment amount is calculated using a predetermined formula based on estimated forward prices of the index applicable from 2022 to 2029. Although this agreement specifies a number of cargoes to be delivered, under its terms, the customer may divert certain cargoes, which would reduce amounts paid under the agreement by Sempra Infrastructure. At March 31, 2022, we expect the commitment amount to increase by $4 million in 2022, $155 million in 2023, $85 million in 2024, $95 million in 2025, $112 million in 2026 and by $355 million thereafter (through contract termination in 2029) compared to December 31, 2021, reflecting changes in estimated forward prices since December 31, 2021 and actual transactions for the first three months of 2022. These LNG commitment amounts are based on the assumption that all LNG cargoes, less those already confirmed to be diverted, under the agreement are delivered. Actual LNG purchases in the current and prior years have been significantly lower than the maximum amount provided under the agreement due to the customer electing to divert cargoes as allowed by the agreement.
ENVIRONMENTAL ISSUES
We disclose any proceeding under environmental laws to which a government authority is a party when the potential monetary sanctions, exclusive of interest and costs, exceed the lesser of $1 million or 1% of current assets, which was $65 million for Sempra, $18 million for SDG&E and $19 million for SoCalGas at March 31, 2022.