XML 43 R16.htm IDEA: XBRL DOCUMENT v3.4.0.3
COMMITMENTS AND CONTINGENCIES
3 Months Ended
Mar. 31, 2016
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies

NOTE 11. COMMITMENTS AND CONTINGENCIES

LEGAL PROCEEDINGS

We accrue losses for a legal proceeding when it is probable that a loss has been incurred and the amount of the loss can be reasonably estimated. However, the uncertainties inherent in legal proceedings make it difficult to estimate with reasonable certainty the costs and effects of resolving these matters. Accordingly, actual costs incurred may differ materially from amounts accrued, may exceed applicable insurance coverage and could materially adversely affect our business, cash flows, results of operations, financial condition and prospects. Unless otherwise indicated, we are unable to estimate reasonably possible losses in excess of any amounts accrued.

At March 31, 2016, Sempra Energy’s accrued liabilities for legal proceedings, including associated legal fees and costs of litigation, on a consolidated basis, were $37 million. At March 31, 2016, accrued liabilities for legal proceedings for SDG&E and SoCalGas were $29 million and $6 million, respectively, excluding amounts for matters related to the Aliso Canyon natural gas leak, which we discuss below.

SDG&E

2007 Wildfire Litigation

In October 2007, San Diego County experienced several catastrophic wildfires. Reports issued by the California Department of Forestry and Fire Protection (Cal Fire) concluded that two of these fires (the Witch and Rice fires) were SDG&E “power line caused” and that a third fire (the Guejito fire) occurred when a wire securing a Cox Communications’ (Cox) fiber optic cable came into contact with an SDG&E power line “causing an arc and starting the fire.” A September 2008 staff report issued by the CPUC’s Consumer Protection and Safety Division, now known as the Safety and Enforcement Division, reached substantially the same conclusions as the Cal Fire reports, but also contended that the power lines involved in the Witch and Rice fires and the lashing wire involved in the Guejito fire were not properly designed, constructed and maintained.

Numerous parties sued SDG&E and Sempra Energy in San Diego County Superior Court seeking recovery of unspecified amounts of damages, including punitive damages, from the three fires. They asserted various bases for recovery, including inverse condemnation based upon a California Court of Appeal decision finding that another California investor-owned utility was subject to strict liability, without regard to foreseeability or negligence, for property damages resulting from a wildfire ignited by power lines. SDG&E has resolved almost all of these lawsuits. One case remains subject to a damages-only trial, where the value of any compensatory damages resulting from the fires will be determined. Two appeals are pending after judgment in the trial court. SDG&E does not expect additional plaintiffs to file lawsuits given the applicable statutes of limitation, but could receive additional settlement demands and damage estimates from the remaining plaintiff until the case is resolved. SDG&E establishes reserves for the wildfire litigation as information becomes available and amounts are estimable.

SDG&E has concluded that it is probable that it will be permitted to recover in rates a substantial portion of the costs incurred to resolve wildfire claims in excess of its liability insurance coverage and the amounts recovered from third parties. Accordingly, at March 31, 2016, Sempra Energy and SDG&E have recorded assets of $363 million in Other Regulatory Assets (long-term) on their Condensed Consolidated Balance Sheets, including $360 million related to CPUC-regulated operations, which represents the amount substantially equal to the aggregate amount it has paid and reserved for payment for the resolution of wildfire claims and related costs in excess of its liability insurance coverage and amounts recovered from third parties. On September 25, 2015, SDG&E filed an application with the CPUC seeking authority to recover these costs, as we discuss in Note 10. Should SDG&E conclude that recovery in rates is no longer probable, SDG&E will record a charge against earnings at the time such conclusion is reached. If SDG&E had concluded that the recovery of regulatory assets related to CPUC-regulated operations was no longer probable or was less than currently estimated at March 31, 2016, the resulting after-tax charge against earnings would have been up to approximately $213 million. A failure to obtain substantial or full recovery of these costs from customers, or any negative assessment of the likelihood of recovery, would likely have a material adverse effect on Sempra Energy’s and SDG&E’s results of operations and cash flows.

We provide additional information about excess wildfire claims cost recovery and related CPUC actions in Note 14 of the Notes to Consolidated Financial Statements in the Annual Report and discuss how we assess the probability of recovery of our regulatory assets in Note 1 of the Notes to Consolidated Financial Statements in the Annual Report.

Smart Meters Patent Infringement Lawsuit

In October 2011, SDG&E was sued by a Texas design and manufacturing company in Federal District Court, Southern District of California, and later transferred to the Federal District Court, Western District of Oklahoma as part of Multi-District Litigation (MDL) proceedings, alleging that SDG&E’s recently installed smart meters infringed certain patents. The meters were purchased from a third party vendor that has agreed to defend and indemnify SDG&E. The lawsuit seeks injunctive relief and recovery of unspecified amounts of damages. The MDL court has finished ruling on pre-trial matters, and SDG&E expects that it will return the case to the Southern District of California.

Lawsuit Against Mitsubishi Heavy Industries, Ltd.

On July 18, 2013, SDG&E filed a lawsuit in the Superior Court of California in the County of San Diego against Mitsubishi Heavy Industries, Ltd., Mitsubishi Nuclear Energy Systems, Inc., and Mitsubishi Heavy Industries America, Inc. (collectively MHI). The lawsuit seeks to recover damages SDG&E has incurred and will incur related to the design defects in the steam generators MHI provided to the SONGS nuclear power plant. The lawsuit asserts a number of causes of action, including fraud, based on the representations MHI made about its qualifications and ability to design generators free from defects of the kind that resulted in the permanent shutdown of the plant and further seeks to set aside the contractual limitation of damages that MHI has asserted. On July 24, 2013, MHI removed the lawsuit to the United States District Court for the Southern District of California and on August 8, 2013, MHI moved to stay the proceeding pending resolution of the dispute resolution process involving MHI and Edison arising from their contract for the purchase and sale of the steam generators. On October 16, 2013, Edison initiated an arbitration proceeding against MHI seeking damages stemming from the failure of the replacement steam generators. In late December 2013, MHI answered and filed a counterclaim against Edison. On March 14, 2014, MHI’s motion to stay the United States District Court proceeding was granted with instructions that require the parties to allow SDG&E to participate in the ongoing Edison/MHI arbitration. As a result, SDG&E participated in the arbitration as a claimant and respondent. The arbitration hearing concluded at the end of April 2016, and a decision could come as early as this year.

Investment in Wind Farm

In 2011, the CPUC and FERC approved SDG&E’s estimated $285 million tax equity investment in a wind farm project and its purchase of renewable energy credits from that project. SDG&E’s contractual obligations to both invest in the Rim Rock wind farm and to purchase renewable energy credits from the wind farm under the power purchase agreement are subject to the satisfaction of certain conditions which, if not achieved, would allow SDG&E to terminate the power purchase agreement and not make the investment. In December 2013, SDG&E received a closing notice from the project developer indicating that all such conditions had been met. SDG&E responded to the closing notice asserting that the contractual conditions had not been satisfied. On December 19, 2013, SDG&E filed a complaint against the project developer in San Diego Superior Court, asking that the court determine that SDG&E is entitled to terminate both the investment contract and the power purchase agreement due to the project developer’s failure to satisfy certain conditions. The project developer filed a separate complaint against SDG&E in Montana state court asking that court to determine that SDG&E breached the investment contract and the power purchase agreement, and asking for several categories of relief, including requiring SDG&E to invest in the project, requiring SDG&E to continue performing under the power purchase agreement, and payment of damages.

On January 27, 2014, the Montana court ordered SDG&E to continue making payments under the power purchase agreement pending a hearing on the project developer’s preliminary injunction motion. On March 14, 2014, SDG&E notified the project developer that the investment agreement expired by its own terms because a closing had not occurred by that date. The project developer disputed SDG&E’s position. On March 28, 2014, SDG&E filed an amended complaint against the project developer in San Diego seeking damages and declaratory relief that SDG&E was entitled to terminate the power purchase agreement and to permit the investment agreement to expire. On April 25, 2014, the Montana court granted the project developer’s preliminary injunction motion to prevent SDG&E from terminating the power purchase agreement on the grounds that the project developer would be irreparably harmed if the payments were not made while the parties’ respective rights were being determined in the litigation. The court did not rule on the merits of the parties’ claims. On July 18, 2014, the Montana Supreme Court determined that the parties’ contractual agreement to resolve any disputes in San Diego was mandatory, and ordered that the Montana action be dismissed. The San Diego court has scheduled a trial in May 2016. On February 11, 2016, SDG&E, the project developer and several of the project developer’s parent and affiliated entities entered into a conditional settlement agreement. Under the conditional settlement agreement, among other things, the parties agreed to terminate the tax equity investment arrangement, continue the power purchase agreement for the wind farm generation, and release all claims against each other. The conditional settlement agreement will not result in rate increases to SDG&E customers or a material impact on Sempra Energy’s or SDG&E’s financial condition, results of operations or cash flows. On February 16, 2016, SDG&E and the project developer filed a petition for approval of the settlement agreement with the CPUC. The conditional settlement agreement is not fully effective until approved by the CPUC; SDG&E expects a decision in 2016. The May 2016 trial date set in the San Diego court has been stayed until the settlement is addressed by the CPUC.

SoCalGas

Aliso Canyon Natural Gas Storage Facility Gas Leak

In October 2015, SoCalGas discovered a leak at one of its injection and withdrawal wells, SS25, at its Aliso Canyon natural gas storage facility, located in the northern part of the San Fernando Valley in Los Angeles County. The Aliso Canyon facility has been operated by SoCalGas since 1972. SS25 is more than one mile away from and 1,200 feet above the closest homes. It is one of more than 100 injection and withdrawal wells at the storage facility.

Stopping the Leak, and Local Community Mitigation Efforts. SoCalGas worked closely with several of the world’s leading experts to stop the leak, including planning and obtaining all necessary approvals for drilling relief wells. On February 18, 2016, the California Department of Conservation’s Division of Oil, Gas, and Geothermal Resources (DOGGR) confirmed that the well was permanently sealed.

On December 24, 2015, by stipulation and court order, SoCalGas agreed to implement a formal plan for assisting residents in the nearby community to temporarily relocate, as well as to pay for additional overtime and costs associated with extra Los Angeles Police Department security patrols, among other things. SoCalGas has been providing temporary relocation support to residents in the nearby community who requested it before the well was permanently sealed. In addition, SoCalGas provided air filtration and purification systems to those residents in the nearby community requesting them.

As a result of receiving the confirmation from DOGGR that SS25 was permanently sealed, SoCalGas started winding down its temporary relocation support in accordance with the terms of the formal relocation plan. Subject to certain exceptions, the period for temporary relocation support to residents who temporarily relocated to short-term housing, such as hotels, was scheduled to end on February 25, 2016. This deadline was challenged by the County of Los Angeles (County), who expressed concern about potential lingering health effects and stated that they intended to perform indoor air testing. The California Superior Court issued an order extending such period for an additional 22 days for certain residents. On March 18, 2016, the County sought a further extension through the end of the litigation, which was denied, but the Superior Court stayed its order pending a potential appeal to the California Court of Appeal. Following an appeal by the County, on April 13, 2016, the Court of Appeal remanded the matter back to the California Superior Court for further consideration of the record and extended the relocation support term to at least April 27, 2016. The Superior Court set the matter for hearing on April 27, 2016, and gave the parties an opportunity to file supplemental briefing and evidence. On April 27, 2016, the Superior Court heard oral argument on the matter and ultimately entered an order further extending the relocation support term pending the completion of the County’s indoor testing. The Superior Court set a case management conference on June 7, 2016, for further consideration of the relocation program, and instructed the County and SoCalGas to file a joint update with the Court on May 31, 2016 regarding the status of the relocation support.

To put the relocation dispute in perspective, on January 31, 2016, the Los Angeles County Department of Public Health (LA County DPH) stated, “The average levels of benzene and other trace chemicals that have been measured in the community are currently at or below levels seen elsewhere in the county, and do not pose an increase in the risk of shortterm or longterm health effects.” Following the sealing of the well, included in its April 9, 2016 update to its Aliso Canyon webpage, the LA County DPH affirmed that “levels of chemicals of concern are now consistent with expected background levels for the Los Angeles air basin.”

In seeking the extension of the relocation support term, the County has contended that indoor testing is required in order to determine whether it is safe for residents to return home. On March 24, 2016, the County released its indoor sampling work plan to test approximately 100 houses for a broad range of chemicals, including volatile organic compounds, semi-volatile organic compounds, metals, and sulfur compounds in the air and on surfaces. These substances are commonly found in households at varying levels. We were informed that this testing was completed on April 8, 2016, and that the County is currently analyzing the results. The County has reported that it anticipates completing its analysis and releasing a final report by late May 2016. In mid-March 2016, a third party engaged by SoCalGas conducted screening of indoor air for methane and mercaptans (odorants added to natural gas) in 71 houses in the Porter Ranch community near the Aliso Canyon storage facility. Based on this screening, no mercaptans were detected, and concentrations of methane were well below levels of concern as established by the California Environmental Protection Agency’s Department of Toxic Substances Control.

The total costs incurred to remediate and stop the leak and to mitigate local community impacts will be significant, and to the extent not covered by insurance, or if there were to be significant delays in receiving insurance recoveries, such costs could have a material adverse effect on SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations.

Cost Estimates and Accounting Impact. At March 31, 2016, SoCalGas recorded estimated costs of $665 million related to the leak. Of this amount, approximately 70 percent is for the temporary relocation program and approximately 15 percent is for attempts to control the well, stop the leak, stop or reduce the emissions, and the estimated cost of the root cause analysis being conducted to determine the cause of the leak. The remaining amount includes estimated legal costs necessary to defend litigation, the value of lost gas, the costs to mitigate the actual natural gas released, and other costs. SoCalGas made a commitment in December 2015 to mitigate the actual natural gas released and has been working on a plan to accomplish the mitigation. The $665 million represents management’s best estimate of these costs related to the leak. Of these costs, certain amounts have been paid and $302 million is recorded as Reserve for Aliso Canyon Costs at March 31, 2016 on SoCalGas’ and Sempra Energy’s Condensed Consolidated Balance Sheets for amounts expected to be paid after March 31, 2016. We will refine these estimates as further information becomes available. SoCalGas’ estimate of temporary relocation costs was primarily determined considering the current experience of temporary relocations through the hearing date of April 27, 2016 discussed above. The remainder of the reserve was estimated primarily based on work plans, the rate of cost accumulation and estimated duration of the various activities, or other estimates. Any differences in actual costs incurred will impact these estimates. Based on the order of the Superior Court on April 27, 2016, which scheduled the next hearing on June 7, 2016, for purposes of this estimate we assume the period for temporary relocation support to residents who temporarily relocated has been extended to June 7, 2016. While such support period could end before June 7, 2016, due to the fact that temporary relocation support has been extended several times, there can be no assurance that future extensions will not be granted. The cost of the temporary relocation support is significant, and the costs of any further extensions of the relocation support term, which are not included in our estimate, could result in a material increase in our cost estimate.

At March 31, 2016, we recorded the expected recovery of the costs described in the immediately preceding paragraph related to the leak (less insurance retentions) of $660 million as Insurance Receivable for Aliso Canyon Costs on SoCalGas’ and Sempra Energy’s Condensed Consolidated Balance Sheets. If we were to conclude that this receivable or a portion of it was no longer probable of recovery from insurers, some or all of this receivable would be charged against earnings.

The above amounts do not include any damage awards, restitution, or any civil or criminal fines, costs or other penalties that may be imposed, as it is not possible to predict the outcome of any criminal or civil proceeding or any administrative action in which such damage awards, restitution or civil or criminal fines, costs or other penalties could be imposed, and any such amounts, if awarded or imposed, cannot be estimated at this time. In addition, the above amounts do not include other potential costs that we currently do not anticipate incurring or we cannot reasonably estimate.

On March 17, 2016, the CPUC issued a decision directing SoCalGas to establish a memorandum account to prospectively track its authorized revenue requirement and all revenues that it receives for its normal, business-as-usual costs to own and operate the Aliso Canyon gas storage field. The CPUC will determine at a later time whether, and to what extent, the tracked revenues may be refunded to ratepayers. Pursuant to the CPUC’s decision, on March 24, 2016, SoCalGas filed an advice letter requesting to establish a memorandum account to track all business-as-usual costs to own and operate the Aliso Canyon storage field, which has been protested by TURN and SCGC. On April 22, 2016, the CPUC’s Energy Division issued a suspension notice for SoCalGas’ advice letter citing the need for additional time for staff review. This suspension period could last up to 120 days.

Insurance. We have at least four kinds of insurance policies that provide in excess of $1 billion in insurance coverage. We cannot predict all of the potential categories of costs or the total amount of costs that we may incur as a result of the leak. In reviewing each of our policies, and subject to various policy limits, exclusions and conditions, based upon what we know as of the filing date of this report, we believe that our insurance policies collectively should cover the following categories of costs: the costs incurred for temporary relocation, costs to address the leak and stop or reduce emissions, the root cause analysis being conducted to determine the cause of the leak, the value of lost natural gas and estimated costs to mitigate the actual natural gas released, the costs associated with litigation and claims by nearby residents and businesses, and, in some circumstances depending on their nature and manner of assessment, fines and penalties. We have been communicating with our insurance carriers and intend to pursue the full extent of our insurance coverage. There can be no assurance that we will be successful in obtaining insurance coverage for these costs under the applicable policies, and to the extent we are not successful, it could result in a material charge against the earnings of SoCalGas and Sempra Energy.

Our estimate at March 31, 2016 of $665 million of certain costs in connection with the Aliso Canyon storage facility leak may rise significantly as more information becomes available, and to the extent not covered by insurance, or if there were to be significant delays in receiving insurance recoveries, such costs could have a material adverse effect on Sempra Energy’s and SoCalGas’ cash flows, financial condition and results of operations. In addition, the costs not included in the $665 million estimate could be material, and to the extent not covered by insurance, could have a material adverse effect on Sempra Energy’s and SoCalGas’ cash flows, financial condition and results of operations.

Governmental Investigations and Civil and Criminal Litigation. Various governmental agencies, including the DOGGR, LA County DPH, South Coast Air Quality Management District (SCAQMD), California Air Resources Board (CARB), California Division of Occupational Safety and Health (DOSH), CPUC, Pipeline and Hazardous Materials Safety Administration (PHMSA), U.S. Environmental Protection Agency (EPA), Los Angeles District Attorney’s Office and California Attorney General’s Office, are investigating this incident. On January 25, 2016, the DOGGR and CPUC selected Blade Energy Partners to conduct an independent analysis under their supervision and to be funded by SoCalGas to investigate the technical root cause of the Aliso Canyon gas leak. We expect the root cause analysis to be completed in late 2016 or early 2017, but the timing is dependent on the DOGGR and the CPUC.

As of April 28, 2016, 138 lawsuits have been filed (134 in Los Angeles County Superior Court, 2 in San Diego County Superior Court, and 2 in the United States District Court for the Southern District of California) against SoCalGas, some of which have also named Sempra Energy, and, in derivative and securities law claims on behalf of Sempra Energy and/or SoCalGas, certain officers and directors of Sempra Energy and/or SoCalGas. These various lawsuits assert causes of action for negligence, strict liability, property damage, fraud, nuisance, trespass, breach of fiduciary duties, and violation of federal securities laws, among other things, and additional litigation may be filed against us in the future related to this incident. Many of these complaints seek class action status, compensatory and punitive damages, injunctive relief, and attorneys’ fees. The Los Angeles City Attorney and Los Angeles County Counsel have also filed a complaint on behalf of the people of the State of California against SoCalGas for public nuisance and violation of the California Unfair Competition Law. The California Attorney General, acting in her independent capacity and on behalf of the people of the State of California and the CARB, joined this lawsuit. The complaint, which as amended includes the California Attorney General, adds allegations of violations of California Health and Safety Code sections 41700, prohibiting discharge of air contaminants that cause annoyance to the public, and 25510, requiring reporting of the release of hazardous material, as well as California Government Code section 12607 for equitable relief for the protection of natural resources. The complaint seeks an order for injunctive relief, to abate the public nuisance, and to impose civil penalties. The SCAQMD also filed a complaint against SoCalGas seeking civil penalties for alleged violations of several nuisance-related statutory provisions arising from the leak and delays in stopping the leak. That suit seeks up to $250,000 in civil penalties for each day the violations occurred.

On February 2, 2016, the Los Angeles District Attorney’s Office filed a misdemeanor criminal complaint against SoCalGas seeking penalties and other remedies for alleged failure to provide timely notice of the leak pursuant to California Health and Safety Code section 25510(a), Los Angeles County Code section 12.56.030, and Title 19 California Code of Regulations section 2703(a), and for violating California Health and Safety Code section 41700 prohibiting discharge of air contaminants that cause annoyance to the public.

The costs of defending against these civil and criminal lawsuits and cooperating with these investigations, and any damages, restitution, and civil and criminal fines, costs and other penalties, if awarded or imposed, could be significant and to the extent not covered by insurance, or if there were to be significant delays in receiving insurance recoveries, could have a material adverse effect on SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations.

Governmental Orders, Additional Regulation and Reliability. On January 6, 2016, the Governor of the State of California issued the Governor’s Order proclaiming a state of emergency to exist in Los Angeles County due to the natural gas leak at the Aliso Canyon facility. The Governor’s Order implemented orders to stop the leak and implements various other orders with respect to:

  • Protecting Public Health and Safety: State agencies will: continue the prohibition against SoCalGas injecting any gas into the Aliso Canyon storage facility until a comprehensive review, utilizing independent experts, of the safety of the storage wells and the air quality of the surrounding community is completed; expand real-time monitoring of emissions in the surrounding community; convene an independent panel of scientific and medical experts to review public health concerns stemming from the natural gas leak and evaluate whether additional measures are needed to protect public health; and take all actions necessary to ensure the continued reliability of natural gas and electricity supplies in the coming months during the moratorium on gas injections into the Aliso Canyon storage facility.
  • Ensuring Accountability: The CPUC will ensure that SoCalGas covers costs related to the natural gas leak and its response, while protecting ratepayers; and CARB will develop a program to fully mitigate the leak’s emissions of methane by March 31, 2016, with such program to be funded by SoCalGas.
  • Strengthening Oversight: The DOGGR will promulgate emergency regulations for gas storage facility operators throughout the state, requiring: at least daily inspection of gas storage well heads using gas leak detection technology such as infrared imaging; ongoing verification of the mechanical integrity of all gas storage wells; ongoing measurement of annular gas pressure or annular gas flow within wells; regular testing of all safety valves used in wells; minimum and maximum pressure limits for each gas storage facility in the state; and a comprehensive risk management plan for each facility that evaluates and prepares for risks, including corrosion potential of pipes and equipment. Additionally, the DOGGR, the CPUC, the CARB and the California Energy Commission will submit to the Governor’s Office a report that assesses the long-term viability of natural gas storage facilities in California.

SoCalGas made a commitment in December 2015 to mitigate the actual natural gas released and has been working on a plan to accomplish the mitigation. On March 31, 2016, pursuant to the Governor’s Order, the CARB issued its Aliso Canyon Methane Leak Climate Impacts Mitigation Program, which sets forth its recommended approach to achieve full mitigation of the emissions from the Aliso Canyon natural gas leak. The CARB program preliminarily assumes that the leak released approximately 100,000 metric tons of methane. It states that full mitigation requires that the program generate reductions in short-lived climate pollutants and other greenhouse gases at least equivalent to that amount and that the appropriate global warming potential to be used in deriving the amount of reductions required is a 20-year term rather than the 100-year term the CARB and other state and federal agencies use in regulating emissions, resulting in a target of approximately 8,000,000 metric tons of carbon dioxide equivalent. CARB’s program also requires all of the mitigation to occur in California over the next five to ten years without the use of allowances or offsets. We have not agreed to this proposed formulation and continue to work with CARB on the mitigation plan.

On January 23, 2016, the Hearing Board of the SCAQMD ordered SoCalGas to, among other things: stop all injections of natural gas except as directed by the CPUC, withdraw the maximum amount of natural gas feasible in a contained and safe manner, subject to orders of the CPUC, and permanently seal the well once the leak has ceased; continuously monitor the well site with infrared cameras until 30 days after the leak has ceased; provide the public with daily air monitoring data collected by SoCalGas; provide the SCAQMD with certain natural gas injection, withdrawal and emissions data from the Aliso Canyon facility; prepare and submit to the SCAQMD for its approval an enhanced leak detection and reporting well inspection program for the Aliso Canyon facility; provide the SCAQMD with funding to develop a continuous air monitoring plan for the Aliso Canyon facility and the nearby schools and community; prepare and submit to the SCAQMD for its approval an air quality notification plan to provide notice to SCAQMD, other public agencies and the nearby community in the event of a future reportable release; and provide the SCAQMD with funding to conduct an independent health study on the potential impacts of exposure on the constituents of the natural gas released from the facility, as well as any odor suppressants used to mitigate odors from the leaking well.

On April 1, 2016, the Secretary of the U.S. Department of Energy (DOE) and PHMSA jointly announced the formation of an Interagency Task Force on Natural Gas Storage Safety in response to the leak at Aliso Canyon to assess and make recommendations on best practices, response plans and safe operation of gas storage facilities. PHMSA has indicated plans to initiate additional regulatory actions on natural gas storage nationally. Each of the DOGGR, SCAQMD, EPA and CARB has commenced separate rulemaking proceedings to adopt further regulations covering natural gas storage facilities and injection wells. The U.S. Senate also passed two pieces of legislation, which include a provision requiring the establishment of an Aliso Canyon Task Force. This generally mirrors the focus and structure of the Task Force on Natural Gas Storage Safety. The legislation requires the Task Force to examine a specific set of issues related to the leak, including impacts on health and electricity prices.

Additional hearings in the state legislature as well as with various other federal and state regulatory agencies have been or are expected to be scheduled, additional legislation has been proposed in the state legislature, and additional laws, orders, rules and regulations may be adopted. Higher operating costs and additional capital expenditures incurred by SoCalGas as a result of new laws, orders, rules and regulations arising out of this incident could be significant and may not be recoverable in customer rates, and SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations may be materially adversely affected by any such new regulations.

On April 22, 2016, DOSH issued notices of intent to issue four “serious” citations to SoCalGas, alleging violations of Title 8 of the California Code of Regulations sections 5155(e)(1), 5192(q)(6)(E), 6845(a), and 6851(a). The notices allege (1) a failure to monitor concentrations of airborne contaminant exposure to employees, (2) an Incident Commander did not receive sufficient training, (3) insufficient testing and inspection of well casing and tubing and (4) insufficient inspection and maintenance to prevent leaks. The maximum penalty that DOSH could issue for these four alleged violations is a total of $280,000.

Natural Gas Storage Operations. SoCalGas estimates that approximately 57 billion cubic feet (Bcf) of natural gas has been delivered to customers or moved to other gas storage facilities from an initial starting point of approximately 77 Bcf of gas in storage on October 23, 2015 at the Aliso Canyon facility. The CPUC has directed SoCalGas to maintain a minimum of 15 Bcf of working natural gas to help ensure reliability of the system through the spring and summer months, and based on the CARB estimates of lost gas, the facility is approximately at this level. Effective February 5, 2016, the DOGGR amended the California Code of Regulations to require all underground natural gas storage facility operators, including SoCalGas, to take further steps to help ensure the safety of their gas storage operations. SoCalGas is in the process of conducting a measurement of natural gas lost from the leak and will provide that information to the relevant regulatory bodies.

Natural gas withdrawn from storage is important for service reliability during peak demand periods, including heating needs in the winter, as well as peak electric generation needs in the summer. Aliso Canyon, with a storage capacity of 86 Bcf, is the largest storage facility and an important element of SoCalGas’ delivery system. Aliso Canyon represents 63 percent of SoCalGas’ owned natural gas storage capacity. SoCalGas has not injected natural gas into Aliso Canyon since October 25, 2015, in accordance with the Governor’s Order and subject to contrary CPUC reliability-based direction. On March 4, 2016, the DOGGR issued Order 1109, Order to Take Specific Actions Regarding Aliso Canyon Gas Storage Facility (Safety Review Testing Regime). On April 7, 2016, SoCalGas announced its safety framework to comply with the DOGGR Order 1109, which consists of phased testing for each of the active injection wells in the Aliso Canyon storage facility. SoCalGas will continue this moratorium on further injections until the completion of this review and any necessary approvals have been obtained.

On April 5, 2016, four energy agencies—the CPUC, the California Energy Commission, the California Independent System Operator, and the Los Angeles Department of Water and Power—issued an Aliso Canyon Action Plan to Preserve Gas and Electric Reliability for the Los Angeles Basin. In their Action Plan, the agencies recognized that: Aliso Canyon is critical to meeting peak demand in both winter and summer; the Greater Los Angeles region could face an estimated 16 days of gas curtailments this upcoming summer—assuming no withdrawals of any of the 15 Bcf held at Aliso Canyon; and unless gas is withdrawn from Aliso Canyon, 14 of these days are likely to be large enough to interrupt electric generators located in the LA Basin. To help mitigate concerns about natural gas service reliability to customers, including related impacts on natural gas-fueled power generation, SoCalGas, SDG&E and 24 customer organizations filed a settlement agreement with the CPUC on April 29, 2016 regarding procedures to help deal with service reliability issues this upcoming summer. The procedures, which would address supply shortages and surpluses using temporarily modified Operational Flow Order (OFO) tariff provisions, would be in place through no later than November 30, 2016. SoCalGas, SDG&E, and the other settlement parties have asked the CPUC to approve this package of reliability-related provisions by May 26, 2016. There can be no assurance that these measures, if approved, will prevent gas curtailments or power outages during the period Aliso Canyon remains offline.

If the Aliso Canyon facility were to be taken out of service for any meaningful period of time, it could result in an impairment of the facility, significantly higher than expected operating costs and/or additional capital expenditures, and natural gas reliability and electric generation could be jeopardized. At March 31, 2016, the Aliso Canyon facility has a net book value of $415 million, including $180 million of construction work in progress for the project to construct a new compression station. Any significant impairment of this asset could have a material adverse effect on SoCalGas’ and Sempra Energy’s results of operations for the period in which it is recorded. Higher operating costs and additional capital expenditures incurred by SoCalGas may not be recoverable in customer rates, and SoCalGas’ and Sempra Energy’s results of operations, cash flows and financial condition may be materially adversely affected.

Other

SoCalGas, along with Monsanto Co., Solutia, Inc., Pharmacia Corp. and Pfizer, Inc., are defendants in seven Los Angeles County Superior Court lawsuits filed beginning in April 2011 seeking recovery of unspecified amounts of damages, including punitive damages, as a result of plaintiffs’ exposure to PCBs (polychlorinated biphenyls). The lawsuits allege plaintiffs were exposed to PCBs not only through the food chain and other various sources but from PCB-contaminated natural gas pipelines owned and operated by SoCalGas. This contamination allegedly caused plaintiffs to develop cancer and other serious illnesses. Plaintiffs assert various bases for recovery, including negligence and products liability. SoCalGas has settled six of the seven lawsuits for an amount that is not significant.

Sempra Mexico

Permit Challenges and Property Disputes

Sempra Mexico has been engaged in a long-running land dispute relating to property adjacent to its Energía Costa Azul LNG terminal near Ensenada, Mexico. Ownership of the adjacent property is not required by any of the environmental or other regulatory permits issued for the operation of the terminal. A claimant to the adjacent property has nonetheless asserted that his health and safety are endangered by the operation of the facility, and filed an action in the Federal Court challenging the permits. In February 2011, based on a complaint by the claimant, the municipality of Ensenada opened an administrative proceeding and sought to temporarily close the terminal based on claims of irregularities in municipal permits issued six years earlier. This attempt was promptly countermanded by Mexican federal and Baja California state authorities. No terminal permits or operations were affected as a result of these proceedings or events and the terminal has continued to operate normally. In the second quarter of 2014, the municipality of Ensenada dismissed the administrative proceeding. In the second quarter of 2015, the Administrative Court of Baja California confirmed the municipality of Ensenada’s ruling and dismissed the proceeding. Sempra Mexico expects additional Mexican court proceedings and governmental actions regarding the claimant’s assertions as to whether the terminal’s permits should be modified or revoked in any manner.

The claimant also filed complaints in the federal Agrarian Court challenging the refusal of the Secretaría de la Reforma Agraria (now the Secretaría de Desarrollo Agrario, Territorial y Urbano, or SEDATU) in 2006 to issue a title to him for the disputed property. In November 2013, the Agrarian Court ordered that SEDATU issue the requested title and cause it to be registered. Both SEDATU and Sempra Mexico challenged the ruling, due to lack of notification of the underlying process. In November 2015, the Agrarian Court denied Sempra Mexico’s challenge, but the ruling does not affect any property rights. Another appeal filed by SEDATU is pending. Sempra Mexico expects additional proceedings regarding the claims, although such proceedings are not related to the permit challenges referenced above.

The property claimant also filed a lawsuit in July 2010 against Sempra Energy in Federal District Court in San Diego seeking compensatory and punitive damages as well as the earnings from the Energía Costa Azul LNG terminal based on his allegations that he was wrongfully evicted from the adjacent property and that he has been harmed by other allegedly improper actions. In September 2015, the Court granted Sempra Energy’s motion for summary judgment and closed the case. In October 2015, the claimant filed a notice of appeal of the summary judgment and an earlier order dismissing certain of his causes of action.

Additionally, several administrative challenges are pending in Mexico before the Mexican environmental protection agency (SEMARNAT) and the Federal Tax and Administrative Courts seeking revocation of the environmental impact authorization (EIA) issued to Energía Costa Azul in 2003. These cases generally allege that the conditions and mitigation measures in the EIA are inadequate and challenge findings that the activities of the terminal are consistent with regional development guidelines. The Mexican Supreme Court decided to exercise jurisdiction over one such case, and in March 2014, issued a resolution denying the relief sought by the plaintiff on the grounds its action was not timely presented. A similar administrative challenge seeking to revoke the port concession for our marine operations at our Energía Costa Azul LNG terminal was filed with and rejected by the Mexican Communications and Transportation Ministry. In April 2015, the Federal court confirmed the Mexican Communications and Transportation Ministry’s ruling denying the request to revoke the port concession and decided in favor of Energía Costa Azul.

Two real property cases have been filed against Energía Costa Azul in which the plaintiffs seek to annul the recorded property titles for parcels on which the Energía Costa Azul LNG terminal is situated and to obtain possession of different parcels that allegedly sit in the same place; one of these cases was dismissed in September 2013 at the direction of the state appellate court. A third complaint was served in April 2013 seeking to invalidate the contract by which Energía Costa Azul purchased another of the terminal parcels, on the grounds the purchase price was unfair. Sempra Mexico expects further proceedings on the remaining two matters.

Sempra Natural Gas

Since April 2012, a total of 14 lawsuits have been filed against Mobile Gas in Mobile County Circuit Court alleging that in the first half of 2008 Mobile Gas spilled tert-butyl mercaptan, an odorant added to natural gas for safety reasons, in Eight Mile, Alabama. Eleven of the lawsuits have been settled. The remaining three lawsuits, which include approximately 250 individual plaintiffs, allege nuisance, fraud and negligence causes of action, and seek unspecified compensatory and punitive damages.

Other Litigation

Sempra Energy holds a noncontrolling interest in RBS Sempra Commodities LLP (RBS Sempra Commodities), a limited liability partnership in the process of being liquidated. The Royal Bank of Scotland plc (RBS), our partner in the joint venture, was notified by the United Kingdom’s Revenue and Customs Department (HMRC) that it was investigating value-added tax (VAT) refund claims made by various businesses in connection with the purchase and sale of carbon credit allowances. HMRC advised RBS that it had determined that it had grounds to deny such claims by RBS related to transactions by RBS Sempra Energy Europe (RBS SEE), a former indirect subsidiary of RBS Sempra Commodities that was sold to JP Morgan. HMRC asserted that RBS was not entitled to reduce its VAT liability by VAT paid during 2009 because RBS knew or should have known that certain vendors in the trading chain did not remit their own VAT to HMRC. In September 2012, HMRC issued a protective assessment of £86 million for the VAT paid in connection with these transactions. In October 2014, RBS filed a Notice of Appeal of the September 2012 assessment with the First-tier Tribunal. As a condition of the appeal, RBS was required to pay the assessed amount. The payment also stops the accrual of interest that could arise should it ultimately be determined that RBS has a liability for some of the tax. RBS has asserted that HMRC’s assessment was time-barred. A preliminary hearing is scheduled for September 19 to 21, 2016. In June 2015, liquidators for three companies that engaged in carbon credit trading via chains that included a company that RBS SEE traded with directly filed a claim in the High Court of Justice against RBS and RBS Sempra Commodities alleging that RBS Sempra Commodities’ and RBS SEE’s participation in transactions involving the sale and purchase of carbon credits resulted in the companies’ incurring VAT liability they were unable to pay. In October 2015, the liquidators’ counsel filed an amended claim adding seven additional trading companies to the claim and asserting damages of £156 million for all 10 companies. Additionally, the claimants dropped RBS Sempra Commodities LLP as a defendant, adding the successor to RBS SEE and JP Morgan, Mercuria Energy Europe Trading Limited (Mercuria), in its stead. JP Morgan has notified us that Mercuria has sought indemnity for the claim, and JP Morgan has in turn sought indemnity from us. Our remaining balance in RBS Sempra Commodities is accounted for under the equity method. The investment balance of $67 million at March 31, 2016 reflects remaining distributions expected to be received from the partnership as it is liquidated. The timing and amount of distributions may be impacted by these matters. We discuss RBS Sempra Commodities further in Note 4 of the Notes to Consolidated Financial Statements in the Annual Report.

In August 2007, the U.S. Court of Appeals for the Ninth Circuit issued a decision reversing and remanding certain FERC orders declining to provide refunds regarding short-term bilateral sales up to one month in the Pacific Northwest for the January 2000 to June 2001 time period. In December 2010, the FERC approved a comprehensive settlement previously reached by Sempra Energy and RBS Sempra Commodities with the State of California. The settlement resolved all issues with regard to sales between the California Department of Water Resources and Sempra Commodities in the Pacific Northwest, but potential claims may exist regarding sales in the Pacific Northwest between Sempra Commodities and other parties. The FERC is in the process of addressing these potential claims on remand. Pursuant to the agreements related to the formation of RBS Sempra Commodities, we have indemnified RBS should the liability from the final resolution of these matters be greater than the reserves related to Sempra Commodities. Pursuant to our agreement with the Noble Group Ltd., one of the buyers of RBS Sempra Commodities’ businesses, we have also indemnified Noble Americas Gas & Power Corp. and its affiliates for all losses incurred by such parties resulting from these proceedings as related to Sempra Commodities.

We are also defendants in ordinary routine litigation incidental to our businesses, including personal injury, employment litigation, product liability, property damage and other claims. Juries have demonstrated an increasing willingness to grant large awards, including punitive damages, in these types of cases.

CONTRACTUAL COMMITMENTS

We discuss below significant changes in the first three months of 2016 to contractual commitments discussed in Note 15 of the Notes to Consolidated Financial Statements in the Annual Report.

Natural Gas Contracts

Sempra Natural Gas’ natural gas purchase and transportation commitments have decreased by $46 million since December 31, 2015, primarily due to payments on existing contracts and changes in forward natural gas prices in the first three months of 2016. Net future payments are expected to decrease by $60 million in 2016, and increase by $10 million in 2017 and $4 million in 2018 compared to December 31, 2015.

LNG Purchase Agreement

Sempra Natural Gas has a purchase agreement for the supply of LNG to the Energía Costa Azul terminal. The agreement is priced using a predetermined formula based on natural gas market indices. Although this contract specifies a number of cargoes to be delivered, under its terms, the customer may divert certain cargoes, which would reduce amounts paid under the contracts by Sempra Natural Gas.

Sempra Natural Gas’ commitment under the LNG purchase agreement, reflecting changes in forward prices since December 31, 2015 and actual transactions for the first three months of 2016, is expected to decrease by $146 million in 2016, $3 million in 2017, $7 million in 2018, $18 million in 2019, and $30 million in 2020 and increase by $20 million thereafter (through contract termination in 2029) compared to December 31, 2015. These amounts are based on forward prices of the index applicable to the contract from 2016 to 2028 and an estimated one percent escalation per year beyond 2028 through contract termination in 2029. The LNG commitment amounts above are based on the requirement for Sempra Natural Gas to accept the maximum possible delivery of cargoes under the agreement. Actual LNG purchases in the current and prior years have been significantly lower than the maximum amounts possible due to the customer electing to divert cargoes as allowed by the agreement.

NUCLEAR INSURANCE

SDG&E and the other owners of SONGS have insurance to cover claims from nuclear liability incidents arising at SONGS. This insurance provides $375 million in coverage limits, the maximum amount available, including coverage for acts of terrorism. In addition, the Price-Anderson Act provides for up to $13.2 billion of secondary financial protection (SFP). If a nuclear liability loss occurring at any U.S. licensed/commercial reactor exceeds the $375 million insurance limit, all nuclear reactor owners could be required to contribute to the SFP. SDG&E’s contribution would be up to $50.93 million. This amount is subject to an annual maximum of $7.6 million, unless a default occurs by any other SONGS owner. If the SFP is insufficient to cover the liability loss, SDG&E could be subject to an additional assessment.

The SONGS owners, including SDG&E, also have $2.75 billion of nuclear property, decontamination, and debris removal insurance, subject to a $2.5 million deductible for “each and every loss.” This insurance coverage is provided through Nuclear Electric Insurance Limited (NEIL). The NEIL policies have specific exclusions and limitations that can result in reduced or eliminated coverage. Insured members as a group are subject to retrospective premium assessments to cover losses sustained by NEIL under all issued policies. SDG&E could be assessed up to $9.7 million of retrospective premiums based on overall member claims. See Note 9 under “Settlement with NEIL” for discussion of an agreement between the SONGS co-owners and NEIL to settle all claims under the NEIL policies associated with the SONGS outage.

The nuclear property insurance program includes an industry aggregate loss limit for non-certified acts of terrorism (as defined by the Terrorism Risk Insurance Act). The industry aggregate loss limit for property claims arising from non-certified acts of terrorism is $3.24 billion. This is the maximum amount that will be paid to insured members who suffer losses or damages from these non-certified terrorist acts.

U.S. DEPARTMENT OF ENERGY NUCLEAR FUEL DISPOSAL

The Nuclear Waste Policy Act of 1982 made the DOE responsible for accepting, transporting, and disposing of spent nuclear fuel. However, it is uncertain when the DOE will begin accepting spent nuclear fuel from SONGS. This delay will lead to increased costs for spent fuel storage. SDG&E will continue to support Edison in its pursuit of claims on behalf of the SONGS co-owners against the DOE for its failure to timely accept the spent nuclear fuel. On April 18, 2016, Edison executed a spent fuel settlement agreement with the DOE for $162 million covering damages incurred from January 1, 2006 through December 31, 2013. SDG&E’s share of the settlement is approximately $32 million.

In October 2015, the California Coastal Commission approved Edison’s application for the proposed expansion of an Independent Spent Fuel Storage Installation (ISFSI) at SONGS. The ISFSI expansion began construction in 2016, will be fully loaded with spent fuel by 2019, and will operate until 2049, when it is assumed that the DOE will have taken custody of all the SONGS spent fuel. The ISFSI would then be decommissioned, and the site restored to its original environmental state.

We provide additional information about SONGS in Note 9 above and in Notes 13 and 15 of the Notes to Consolidated Financial Statements in the Annual Report.

CONCENTRATION OF CREDIT RISK

We maintain credit policies and systems to manage our overall credit risk. These policies include an evaluation of potential counterparties’ financial condition and an assignment of credit limits. These credit limits are established based on risk and return considerations under terms customarily available in the industry. We grant credit to utility customers and counterparties, substantially all of whom are located in our service territory, which covers most of Southern California and a portion of central California for SoCalGas, and all of San Diego County and an adjacent portion of Orange County for SDG&E. We also grant credit to utility customers and counterparties of our other companies providing natural gas or electric services in Mexico, Chile, Peru, southwest Alabama, and Hattiesburg, Mississippi.

As they become operational, projects owned or partially owned by Sempra Natural Gas, Sempra Renewables, Sempra South American Utilities and Sempra Mexico place significant reliance on the ability of their suppliers, customers and partners to perform on long-term agreements and on our ability to enforce contract terms in the event of nonperformance. We consider many factors, including the negotiation of supplier and customer agreements, when we evaluate and approve development projects.