Basis of Accounting FE and its subsidiaries follow GAAP and comply with the related regulations, orders, policies and practices prescribed by the SEC, FERC, and, as applicable, the NRC, the PUCO, the PPUC, the MDPSC, the NYPSC, the WVPSC, the VSCC and the NJBPU. The preparation of financial statements in conformity with GAAP requires management to make periodic estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and disclosure of contingent assets and liabilities. Actual results could differ from these estimates. The reported results of operations are not necessarily indicative of results of operations for any future period. FE and its subsidiaries have evaluated events and transactions for potential recognition or disclosure through the date the financial statements were issued.
Consolidation
FE and its subsidiaries consolidate all majority-owned subsidiaries over which they exercise control and, when applicable, entities for which they have a controlling financial interest. Intercompany transactions and balances are eliminated in consolidation as appropriate and permitted pursuant to GAAP. As further discussed below, FE and its subsidiaries consolidate a VIE when it is determined that it is the primary beneficiary. Investments in affiliates over which FE and its subsidiaries have the ability to exercise significant influence, but do not have a controlling financial interest, follow the equity method of accounting. Under the equity method, the interest in the entity is reported as an investment in the Consolidated Balance Sheets and the percentage of FE's ownership share of the entity’s earnings is reported in the Consolidated Statements of Income and Comprehensive Income.

Certain prior year amounts have been reclassified to conform to the current year presentation.
Receivables
RECEIVABLES
Activity in the allowance for uncollectible accounts on receivables for the years ended December 31, 2020, 2019 and 2018 are as follows:
(In millions)202020192018
Customer Receivables
Beginning of year balance $46 $50 $49 
Charged to income (1)
174 81 77 
Charged to other accounts (2)
46 47 60 
Write-offs (102)(132)(136)
End of year balance $164 $46 $50 
Other Receivables
Beginning of year balance$21 $$
Charged to income 727 13 
Charged to other accounts (2)
10— 
Write-offs(12)(9)(12)
End of year balance$26 $21 $
Affiliated Companies Receivables (3)
Beginning of year balance$1,063 $920 $— 
Charged to income — 143 920 
Charged to other accounts (2)
— — — 
Write-offs (1,063)— — 
End of year balance$— $1,063 $920 
(1) Customer receivable amounts charged to income for the years ended December 31, 2020, 2019 and 2018 include approximately $103 million, $25 million, and $24 million respectively, deferred for future recovery.
(2) Represents recoveries and reinstatements of accounts previously written off for uncollectible accounts.
(3) Amounts relate to the FES Debtors and are included in discontinued operations. Write-off of $1.1 billion in 2020 was recognized upon their emergence in February 2020. See Note 3, "Discontinued Operations" for additional information.
Receivables from customers include retail electric sales and distribution deliveries to residential, commercial and industrial customers for the Utilities.
Accounting for the Effects of Regulation
ACCOUNTING FOR THE EFFECTS OF REGULATION

FirstEnergy accounts for the effects of regulation through the application of regulatory accounting to the Utilities and the Transmission Companies since their rates are established by a third-party regulator with the authority to set rates that bind customers, are cost-based and can be charged to and collected from customers.
FirstEnergy records regulatory assets and liabilities that result from the regulated rate-making process that would not be recorded under GAAP for non-regulated entities. These assets and liabilities are amortized in the Consolidated Statements of Income concurrent with the recovery or refund through customer rates. FirstEnergy believes that it is probable that its regulatory assets and liabilities will be recovered and settled, respectively, through future rates. FirstEnergy, the Utilities and the Transmission Companies net their regulatory assets and liabilities based on federal and state jurisdictions.
Earnings Per Share of Common Stock
EARNINGS PER SHARE OF COMMON STOCK

Basic EPS available to common stockholders is computed using the weighted average number of common shares outstanding during the relevant period as the denominator. The denominator for diluted EPS of common stock reflects the weighted average of common shares outstanding plus the potential additional common shares that could result if dilutive securities and other agreements to issue common stock were exercised.

During 2019 and 2018, EPS was computed using the two-class method required for participating securities. The convertible preferred stock issued in January 2018 were considered participating securities since the shares participated in dividends on common stock on an “as-converted” basis. All convertible preferred stock was converted to common stock during 2019.

The two-class method uses an earnings allocation formula that treats participating securities as having rights to earnings that otherwise would have been available only to common stockholders. Under the two-class method, net income attributable to common stockholders is derived by subtracting the following from income from continuing operations:

preferred stock dividends,
deemed dividends for the amortization of the beneficial conversion feature recognized at issuance of the preferred stock (if any), and
an allocation of undistributed earnings between the common stock and the participating securities (convertible preferred stock) based on their respective rights to receive dividends.

Net losses were not allocated to the convertible preferred stock as they did not have a contractual obligation to share in the losses of FirstEnergy. FirstEnergy allocated undistributed earnings based upon income from continuing operations.
Diluted EPS reflects the dilutive effect of potential common shares from share-based awards and convertible shares of preferred stock. The dilutive effect of outstanding share-based awards was computed using the treasury stock method, which assumes any proceeds that could be obtained upon the exercise of the award would be used to purchase common stock at the average market price for the period. The dilutive effect of the convertible preferred stock was computed using the if-converted method, which assumes conversion of the convertible preferred stock at the beginning of the period, giving income recognition for the add-back of the preferred stock dividends, amortization of beneficial conversion feature, and undistributed earnings allocated to preferred stockholders.
Property, Plant and Equipment PROPERTY, PLANT AND EQUIPMENTProperty, plant and equipment reflects original cost (net of any impairments recognized), including payroll and related costs such as taxes, employee benefits, administrative and general costs, and interest costs incurred to place the assets in service. The costs of normal maintenance, repairs and minor replacements are expensed as incurred. FirstEnergy recognizes liabilities for planned major maintenance projects as they are incurred.
Asset Retirement Obligations
Asset Retirement Obligations

FE recognizes an ARO for the future remediation of environmental liabilities associated with all of its long-lived assets. The ARO liability represents an estimate of the fair value of FirstEnergy's current obligation related to nuclear decommissioning and the retirement or remediation of environmental liabilities of other assets. A fair value measurement inherently involves uncertainty in the amount and timing of settlement of the liability. FirstEnergy uses an expected cash flow approach to measure the fair value of the nuclear decommissioning and environmental remediation AROs, considering the expected timing of settlement of the ARO based on the expected economic useful life of associated asset and/or regulatory requirements. The fair value of an ARO is
recognized in the period in which it is incurred. The associated asset retirement costs are capitalized as part of the carrying value of the long-lived asset and are depreciated over the life of the related asset. In certain circumstances, FirstEnergy has recovery of asset retirement costs and, as such, certain accretion and depreciation is offset against regulatory assets.

Conditional retirement obligations associated with tangible long-lived assets are recognized at fair value in the period in which they are incurred if a reasonable estimate can be made, even though there may be uncertainty about timing or method of settlement. When settlement is conditional on a future event occurring, it is reflected in the measurement of the liability, not the timing of the liability recognition.
AROs as of December 31, 2020, including the transfer of TMI-2, its NDT and related decommissioning liabilities to TMI-2 Solutions, LLC, a subsidiary of EnergySolutions, LLC, in the fourth quarter of 2020, are described further in Note 13, "Asset Retirement Obligations."
Goodwill
GOODWILL

In a business combination, the excess of the purchase price over the estimated fair value of the assets acquired and liabilities assumed is recognized as goodwill. FirstEnergy evaluates goodwill for impairment annually on July 31 and more frequently if indicators of impairment arise. In evaluating goodwill for impairment, FirstEnergy assesses qualitative factors to determine whether it is more likely than not (that is, likelihood of more than 50%) that the fair value of a reporting unit is less than its carrying value (including goodwill). If FirstEnergy concludes that it is not more likely than not that the fair value of a reporting unit is less than its carrying value, then no further testing is required. However, if FirstEnergy concludes that it is more likely than not that the fair value of a reporting unit is less than its carrying value or bypasses the qualitative assessment, then the quantitative goodwill impairment test is performed to identify a potential goodwill impairment and measure the amount of impairment to be recognized, if any.
As of July 31, 2020, FirstEnergy performed a qualitative assessment of the Regulated Distribution and Regulated Transmission reporting units' goodwill, assessing economic, industry and market considerations in addition to the reporting units' overall financial performance. Key factors used in the assessment included: growth rates, interest rates, expected capital expenditures, utility sector market performance, regulatory and legal developments, and other market considerations. It was determined that the fair values of these reporting units were, more likely than not, greater than their carrying values and a quantitative analysis was not necessary.
Inventory
INVENTORY

Materials and supplies inventory includes fuel inventory and the distribution, transmission and generation plant materials, net of reserve for excess and obsolete inventory. Materials are generally charged to inventory at weighted average cost when purchased and expensed or capitalized, as appropriate, when used or installed. Fuel inventory is accounted for at weighted average cost when purchased and recorded to fuel expense when consumed.
Derivatives
DERIVATIVES

FirstEnergy is exposed to financial risks resulting from fluctuating interest rates and commodity prices, including prices for electricity, coal and energy transmission. To manage the volatility related to these exposures, FirstEnergy’s Risk Policy Committee, comprised of senior management, provides general management oversight for risk management activities throughout FirstEnergy. The Risk Policy Committee is responsible for promoting the effective design and implementation of sound risk management programs and oversees compliance with corporate risk management policies and established risk management practice. FirstEnergy may use a variety of derivative instruments for risk management purposes including forward contracts, options, futures contracts and swaps.
FirstEnergy accounts for derivative instruments on its Consolidated Balance Sheets at fair value unless they meet the normal purchases and normal sales criteria. Derivative instruments meeting the normal purchases and normal sales criteria are accounted for under the accrual method of accounting with their effects included in earnings at the time of contract performance.
Variable Interest Entities
VARIABLE INTEREST ENTITIES

FirstEnergy performs qualitative analyses based on control and economics to determine whether a variable interest classifies FirstEnergy as the primary beneficiary (a controlling financial interest) of a VIE. An enterprise has a controlling financial interest if it has both power and economic control, such that an entity has: (i) the power to direct the activities of a VIE that most significantly impact the entity’s economic performance; and (ii) the obligation to absorb losses of the entity that could potentially be significant to the VIE or the right to receive benefits from the entity that could potentially be significant to the VIE. FirstEnergy consolidates a VIE when it is determined that it is the primary beneficiary.

In order to evaluate contracts for consolidation treatment and entities for which FirstEnergy has an interest, FirstEnergy aggregates variable interests into categories based on similar risk characteristics and significance.

Consolidated VIEs
VIEs in which FirstEnergy is the primary beneficiary consist of the following (included in FirstEnergy’s consolidated financial statements):
Ohio Securitization - In June 2013, SPEs formed by the Ohio Companies issued approximately $445 million of pass-through trust certificates supported by phase-in recovery bonds to securitize the recovery of certain all electric customer heating discounts, fuel and purchased power regulatory assets.
JCP&L Securitization - JCP&L Transition Funding II sold transition bonds to securitize the recovery of deferred costs associated with JCP&L’s supply of BGS.
MP and PE Environmental Funding Companies - Bankruptcy remote, special purpose limited liability companies that are indirect subsidiaries of MP and PE which issued environmental control bonds.

See Note 11, “Capitalization,” for additional information on securitized bonds.

Unconsolidated VIEs
FirstEnergy is not the primary beneficiary of the following VIEs:
Global Holding - FEV holds a 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations with coal sales in U.S. and international markets. FEV is not the primary beneficiary of the joint venture, as it does not have control over the significant activities affecting the joint ventures economic performance. FEV's ownership interest is subject to the equity method of accounting. As of December 31, 2020, the carrying value of the equity method investment was $30 million.
As discussed in Note 15, "Commitments, Guarantees and Contingencies," FE is the guarantor under Global Holding's $120 million syndicated senior secured term loan facility due November 12, 2024, under which Global Holding's outstanding principal balance is $108 million as of December 31, 2020. Failure by Global Holding to meet the terms and conditions under its term loan facility could require FE to be obligated under the provisions of its guarantee, resulting in consolidation of Global Holding by FE.

PATH WV - PATH, a proposed transmission line from West Virginia through Virginia into Maryland which PJM cancelled in 2012, is a series limited liability company that is comprised of multiple series, each of which has separate rights, powers and duties regarding specified property and the series profits and losses associated with such property. A subsidiary of FE owns 100% of the Allegheny Series (PATH-Allegheny) and 50% of the West Virginia Series (PATH-WV), which is a joint venture with a subsidiary of AEP. FirstEnergy is not the primary beneficiary of PATH-WV, as it does not have control over the significant activities affecting the economics of PATH-WV. FirstEnergy's ownership interest in PATH-WV is subject to the equity method of accounting. As of December 31, 2020, the carrying value of the equity method investment was $18 million.

Purchase Power Agreements - FirstEnergy evaluated its PPAs and determined that certain NUG entities at its Regulated Distribution segment may be VIEs to the extent that they own a plant that sells substantially all of its output to the applicable utilities and the contract price for power is correlated with the plant’s variable costs of production.

FirstEnergy maintains six long-term PPAs with NUG entities that were entered into pursuant to PURPA. FirstEnergy was not involved in the creation of, and has no equity or debt invested in, any of these entities. FirstEnergy has determined that for all but one of these NUG entities, it does not have a variable interest, or the entities do not meet the criteria to be considered a VIE. FirstEnergy may hold a variable interest in the remaining one entity; however, it applied the scope exception that exempts enterprises unable to obtain the necessary information to evaluate entities.
Because FirstEnergy has no equity or debt interests in the NUG entities, its maximum exposure to loss relates primarily to the above-market costs incurred for power. FirstEnergy expects any above-market costs incurred at its Regulated Distribution segment to be recovered from customers. Purchased power costs related to the contract that may contain a variable interest were $113 million and $116 million, respectively, during the years ended December 31, 2020 and 2019.
New Accounting Pronouncements
NEW ACCOUNTING PRONOUNCEMENTS

Recently Adopted Pronouncements

ASU 2016-13, “Financial Instruments - Credit Losses (Topic 326): Measurement of Credit Losses on Financial Instruments” (Issued June 2016 and subsequently updated): ASU 2016-13 removes all recognition thresholds and will require companies to recognize an allowance for credit losses for the difference between the amortized cost basis of a financial instrument and the amount of amortized cost that the company expects to collect over the instrument’s contractual life. Prior to adoption, FirstEnergy analyzed its financial instruments within the scope of this guidance, primarily trade receivables and AFS debt securities. The adoption of this standard upon January 1, 2020 did not have a material impact to FirstEnergy’s financial statements and required additional disclosures in these Notes to the Consolidated Financial Statements. Please see above for additional information on FirstEnergy’s allowance for uncollectible customer receivables.

ASU 2018-15, "Intangibles-Goodwill and Other-Internal-Use Software (Subtopic 350-40): Customer’s Accounting for Implementation Costs Incurred in a Cloud Computing Arrangement That Is a Service Contract" (Issued August 2018): ASU 2018-15 allows implementation costs incurred by customers in cloud computing arrangements to be deferred and recognized over the term of the arrangement, if those costs would be capitalized by the customers in a software licensing arrangement. FirstEnergy adopted this standard as of January 1, 2020, with no material impact to its financial statements.

ASU 2020-04, "Reference Rate Reform (Topic 848): Facilitation of the Effects of Reference Rate Reform on Financial Reporting” (Issued March 2020 and subsequently updated): ASU 2020-04 provides temporary optional expedients and exceptions to the current guidance on contract modifications to ease the financial reporting burdens related to the expected market transition from LIBOR and other interbank offered rates to alternative reference rates. FirstEnergy’s $3.5 billion Revolving Credit Facility bears interest at fluctuating interest rates based on LIBOR and contains provisions (requiring an amendment) in the event that LIBOR can no longer be used. As of December 31, 2020, FirstEnergy has not utilized any of the expedients discussed within this ASU.

Recently Issued Pronouncements - The following new authoritative accounting guidance issued by the FASB has not yet been adopted. Unless otherwise indicated, FirstEnergy is currently assessing the impact such guidance may have on its financial statements and disclosures, as well as the potential to early adopt where applicable. FirstEnergy has assessed other FASB issuances of new standards not described below based upon the current expectation that such new standards will not significantly impact FirstEnergy's financial reporting.
ASU 2019-12, "Simplifying the Accounting for Income Taxes" (Issued in December 2019): ASU 2019-12 enhances and simplifies various aspects of the income tax accounting guidance including the elimination of certain exceptions related to the approach for intraperiod tax allocation, the methodology for calculating income taxes in an interim period and the recognition of deferred tax liabilities for outside basis differences. The new guidance also simplifies aspects of the accounting for franchise taxes and enacted changes in tax laws or rates and clarifies the accounting for transactions that result in a step-up in the tax basis of goodwill. The guidance will be effective for fiscal years, and interim periods within those fiscal years, beginning after December 15, 2020, with early adoption permitted. FirstEnergy continues to evaluate the new guidance, but currently does not expect a material impact upon adopting this standard.
Income Taxes
FirstEnergy records income taxes in accordance with the liability method of accounting. Deferred income taxes reflect the net tax effect of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts recognized for tax purposes. Investment tax credits, which were deferred when utilized, are being amortized over the recovery period of the related property. Deferred income tax liabilities related to temporary tax and accounting basis differences and tax credit carryforward items are recognized at the statutory income tax rates in effect when the liabilities are expected to be paid. Deferred tax assets are recognized based on income tax rates expected to be in effect when they are settled.

FE and its subsidiaries are party to an intercompany income tax allocation agreement that provides for the allocation of consolidated tax liabilities. Net tax benefits attributable to FE, excluding any tax benefits derived from interest expense associated with acquisition indebtedness from the merger with GPU, are reallocated to the subsidiaries of FE that have taxable income. That allocation is accounted for as a capital contribution to the company receiving the tax benefit. Effective as of their emergence from bankruptcy, February 27, 2020, the FES Debtors no longer are part of FirstEnergy's consolidated federal income tax group or the intercompany income tax allocation agreement. Upon emergence, FirstEnergy paid the FES Debtors
$125 million to settle all reconciliations under the Intercompany Tax Allocation Agreement for 2018, 2019 and 2020 tax years, including all issues regarding nondeductible interest.
Pension and Other Postretirement Plans PENSION AND OTHER POST-EMPLOYMENT BENEFITS
FirstEnergy provides noncontributory qualified defined benefit pension plans that cover substantially all of its employees and non-qualified pension plans that cover certain employees. The plans provide defined benefits based on years of service and compensation levels. Under the cash-balance portion of the pension plan (for employees hired on or after January 1, 2014), FirstEnergy makes contributions to eligible employee retirement accounts based on a pay credit and an interest credit. In addition, FirstEnergy provides a minimum amount of noncontributory life insurance to retired employees in addition to optional contributory insurance. Health care benefits, which include certain employee contributions, deductibles and co-payments, are also available upon retirement to certain employees, their dependents and, under certain circumstances, their survivors. FirstEnergy recognizes the expected cost of providing pension and OPEB to employees and their beneficiaries and covered dependents from the time employees are hired until they become eligible to receive those benefits. FirstEnergy also has obligations to former or inactive employees after employment, but before retirement, for disability-related benefits.
FirstEnergy recognizes a pension and OPEB mark-to-market adjustment for the change in the fair value of plan assets and net actuarial gains and losses annually in the fourth quarter of each fiscal year and whenever a plan is determined to qualify for a remeasurement. The remaining components of pension and OPEB expense, primarily service costs, interest on obligations, assumed return on assets and prior service costs, are recorded on a monthly basis.
Under the approved bankruptcy settlement agreement discussed above, upon emergence, FES and FENOC employees ceased earning years of service under the FirstEnergy pension and OPEB plans. The emergence on February 27, 2020, triggered a remeasurement of the affected pension and OPEB plans and as a result, FirstEnergy recognized a non-cash, pre-tax pension and OPEB mark-to-market adjustment of approximately $423 million in the first quarter of 2020. The first quarter 2020 pension and OPEB mark-to-market adjustment primarily reflects a 38 bps decrease in the discount rate used to measure benefit obligations from December 31, 2019, partially offset by a slightly higher than expected return on assets. In the fourth quarter 2020, FirstEnergy recognized a $54 million pension and OPEB mark-to-market adjustment, primarily reflecting a 29 bps decrease in the discount rate used to measure benefit obligations from February 27, 2020, partially offset by higher than expected return on assets. Of the $54 million, approximately $21 million was allocated to certain of the Transmission Companies that are expected to be recovered through formula transmission rates. The annual pension and OPEB mark-to-market adjustments for the years ended December 31, 2020, 2019, and 2018 were $477 million (including the $423 million in the first quarter of 2020 described above), $676 million, and $145 million, respectively. Of these amounts, approximately $2 million and $1 million are included in discontinued operations for the years ended December 31, 2019, and 2018, respectively. Furthermore, of these annual pension and OPEB mark-to-market amounts, approximately $40 million, $47 million and $8 million were allocated to certain of the Transmission Companies and expected to be recovered through formula transmission rates, respectively.

FirstEnergy’s pension and OPEB funding policy is based on actuarial computations using the projected unit credit method. In January 2018, FirstEnergy satisfied its minimum required funding obligations to its qualified pension plan of $500 million and addressed anticipated required funding obligations through 2020 to its pension plan with an additional contribution of $750 million. On February 1, 2019, FirstEnergy made a $500 million voluntary cash contribution to the qualified pension plan. FirstEnergy expects no required contributions until 2022.
Share-based Compensation Shares granted under the ICP 2020 and ICP 2015 are issued from authorized but unissued common stock. Vesting periods for stock-based awards range from two to ten years, with the majority of awards having a vesting period of three years. FirstEnergy also issues stock through its 401(k) Savings Plan, EDCP, and DCPD. Currently, FirstEnergy records the compensation costs for stock-based compensation awards that will be paid in stock over the vesting period based on the fair value on the grant date. FirstEnergy accounts for forfeitures as they occur. FirstEnergy adjusts the compensation costs for stock-based compensation awards that will be paid in cash based on changes in the fair value of the award as of each reporting date. FirstEnergy records the actual tax benefit realized from tax deductions when awards are exercised or settled
Fair Value Measurement
Authoritative accounting guidance establishes a fair value hierarchy that prioritizes the inputs used to measure fair value. This hierarchy gives the highest priority to Level 1 measurements and the lowest priority to Level 3 measurements. The three levels of the fair value hierarchy and a description of the valuation techniques are as follows:
Level 1-Quoted prices for identical instruments in active market
Level 2-Quoted prices for similar instruments in active market
-Quoted prices for identical or similar instruments in markets that are not active
-Model-derived valuations for which all significant inputs are observable market data
Models are primarily industry-standard models that consider various assumptions, including quoted forward prices for commodities, time value, volatility factors and current market and contractual prices for the underlying instruments, as well as other relevant economic measures.
Level 3-Valuation inputs are unobservable and significant to the fair value measurement
FirstEnergy produces a long-term power and capacity price forecast annually with periodic updates as market conditions change. When underlying prices are not observable, prices from the long-term price forecast are used to measure fair value.

FTRs are financial instruments that entitle the holder to a stream of revenues (or charges) based on the hourly day-ahead congestion price differences across transmission paths. FTRs are acquired by FirstEnergy in the annual, monthly and long-term PJM auctions and are initially recorded using the auction clearing price less cost. After initial recognition, FTRs' carrying values are periodically adjusted to fair value using a mark-to-model methodology, which approximates market. The primary inputs into the model, which are generally less observable than objective sources, are the most recent PJM auction clearing prices and the FTRs' remaining hours. The model calculates the fair value by multiplying the most recent auction clearing price by the remaining FTR hours less the prorated FTR cost. Significant increases or decreases in inputs in isolation may have resulted in a higher or lower fair value measurement.

NUG contracts represent PPAs with third-party non-utility generators that are transacted to satisfy certain obligations under PURPA. NUG contract carrying values are recorded at fair value and adjusted periodically using a mark-to-model methodology, which approximates market. The primary unobservable inputs into the model are regional power prices and generation MWH. Pricing for the NUG contracts is a combination of market prices for the current year and next two years based on observable data and internal models using historical trends and market data for the remaining years under contract. The internal models use forecasted energy purchase prices as an input when prices are not defined by the contract. Forecasted market prices are based on Intercontinental Exchange, Inc. quotes and management assumptions. Generation MWH reflects data provided by contractual arrangements and historical trends. The model calculates the fair value by multiplying the prices by the generation MWH. Significant increases or decreases in inputs in isolation may have resulted in a higher or lower fair value measurement.