Regulatory Matters
12 Months Ended
Dec. 31, 2014
Regulated Operations [Abstract]  
REGULATORY MATTERS
REGULATORY MATTERS

STATE REGULATION

Each of the Utilities' retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in Maryland by the MDPSC, in Ohio by the PUCO, in New Jersey by the NJBPU, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York by the NYPSC. The transmission operations of PE in Virginia are subject to certain regulations of the VSCC. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility.

As competitive retail electric suppliers serving retail customers primarily in Ohio, Pennsylvania, Illinois, Michigan, New Jersey and Maryland, FES and AE Supply are subject to state laws applicable to competitive electric suppliers in those states, including affiliate codes of conduct that apply to FES, AE Supply and their public utility affiliates. In addition, if any of the FirstEnergy affiliates were to engage in the construction of significant new transmission or generation facilities, depending on the state, they may be required to obtain state regulatory authorization to site, construct and operate the new transmission or generation facility.

MARYLAND

PE provides SOS pursuant to a combination of settlement agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are overseen by the MDPSC and a third party monitor. Although settlements with respect to residential SOS for PE customers expired on December 31, 2012, by statute, service continues in the same manner unless changed by order of the MDPSC. The settlement provisions relating to non-residential SOS have also expired; however, by MDPSC order, the terms of service remain in place unless PE requests or the MDPSC orders a change. PE recovers its costs plus a return for providing SOS.

The Maryland legislature adopted a statute in 2008 codifying the EmPOWER Maryland goals to reduce electric consumption by 10% and reduce electricity demand by 15%, in each case by 2015. PE's initial plan submitted in compliance with the statute was approved in 2009, at which time expenditures were estimated to be approximately $101 million for the PE programs for the entire period of 2009-2015. PE's third plan, covering the three-year period 2015-2017, was approved by the MDPSC on December 23, 2014. The projected costs of the 2015-2017 plan are approximately $64 million for that three year period. PE continues to recover program costs subject to a five-year amortization. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding, and to date such recovery has not been sought or obtained by PE.

The MDPSC adopted rules, effective May 28, 2012, that set utility-specific SAIDI and SAIFI targets for 2012-2015; prescribed detailed tree-trimming requirements, outage restoration and downed wire response deadlines; imposed other reliability and customer satisfaction requirements; and established annual reporting requirements. The MDPSC is required to assess each utility's compliance with the new rules, and may assess penalties of up to $25,000 per day, per violation. The MDPSC issued orders accepting PE's reports on compliance under the new rules on September 3, 2013 and August 27, 2014.

On February 27, 2013, the MDPSC issued an order (the February 27 Order) requiring the Maryland electric utilities to submit analyses, relating to the costs and benefits of making further system and staffing enhancements in order to attempt to reduce storm outage durations. The order further required the Staff of the MDPSC to report on possible performance-based rate structures and to propose additional rules relating to feeder performance standards, outage communication and reporting, and sharing of special needs customer information. PE's final filing on September 3, 2013, discussed the steps needed to harden the utility's system in order to attempt to achieve various levels of storm response speed described in the February 27 Order, and projected that it would require approximately $2.7 billion in infrastructure investments over 15 years to attempt to achieve the quickest level of response for the largest storm projected in the February 27 Order. On July 1, 2014, the Staff of the MDPSC issued a set of reports that recommended the imposition of extensive additional requirements in the areas of storm response, feeder performance, estimates of restoration times, and regulatory reporting. The Staff also recommended the imposition of penalties, including customer rebates, for a utility's failure or inability to comply with the escalating standards of storm restoration speed proposed by the Staff. In addition, the Staff proposed that the utilities be required to develop and implement system hardening plans, up to a rate impact cap on cost. The MDPSC conducted a hearing September 15-18, 2014, to consider certain of these matters, and has not yet scheduled further proceedings on any of the matters.

NEW JERSEY

JCP&L currently provides BGS for retail customers who do not choose a third party EGS and for customers of third party EGSs that fail to provide the contracted service. The supply for BGS, which is comprised of two components, is provided through contracts procured through separate, annually held descending clock auctions, the results of which are approved by the NJBPU. One BGS component and auction, reflecting hourly real time energy prices, is available for larger commercial and industrial customers. The other BGS component and auction, providing a fixed price service, is intended for smaller commercial and residential customers. All New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates.

In an order issued July 31, 2012, the NJBPU ordered JCP&L to file a base rate case using a historical 2011 test year. The rate case petition was filed on November 30, 2012 by JCP&L requesting approval to increase revenues by approximately $31 million, which included the recovery of 2011 storm restoration costs but excluded approximately $603 million of costs incurred in 2012 associated with the impact of Hurricane Sandy. In the initial briefs of the parties, the Division of Rate Counsel recommended that base rate revenues be reduced by $214.9 million while the NJBPU Staff recommended a $207.4 million reduction (such amounts do not address the revenue requirements associated with the major storm events of 2011 and 2012). On May 5, 2014, JCP&L submitted updated schedules to reflect the result of the generic storm cost proceeding, discussed below, to revise the debt rate to 5.93%, and to request that base rate revenues be increased by $9.1 million, including the recovery of 2011 storm costs. The record in the case was closed as of June 30, 2014. The ALJ provided his initial Decision on January 8, 2015, which recommended an annual revenue reduction of $107.5 million and did not include the recovery of 2012 storm costs or any CTA. On February 11, 2015, the NJBPU approved a 45-day extension to render a final decision.

On January 23, 2013, the NJBPU opened a generic proceeding to review its policies with respect to the use of a CTA in base rate cases. The NJBPU and its Staff solicited, and were provided, input from interested stakeholders, including utilities and the Division of Rate Counsel. On June 18, 2014, the NJBPU Staff proposed to amend current CTA policy by: 1) calculating savings using a 5 year look back from the beginning of the test year; 2) allocating savings with 75% retained by the company and 25% allocated to rate payers; and 3) excluding transmission assets of electric distribution companies in the savings calculation. JCP&L and other stakeholders filed written comments on the Staff proposal. In its Order issued October 22, 2014, the NJBPU stated it would continue to apply its current CTA policy in base rate cases, subject to incorporating the staff proposed modifications (as discussed above). For pending base rate cases in which the record had closed, such as JCP&L’s, the NJBPU would, following an initial decision of the ALJ, reopen the record for the limited purpose of adding a CTA calculation reflecting the modified policy and allow parties the opportunity to comment. FirstEnergy expects the application of the modified policy in the pending JCP&L base rate case to reduce annual revenues by approximately $5 million. On November 5, 2014, the Division of Rate Counsel appealed the NJBPU Order to the New Jersey Superior Court. JCP&L has filed to participate as a respondent in that proceeding.

On March 20, 2013, the NJBPU ordered that a generic proceeding be established to investigate the prudence of costs incurred by all New Jersey utilities for service restoration efforts associated with the major storm events of 2011 and 2012. The Order provided that if any utility had already filed a proceeding for recovery of such storm costs, to the extent the amount of approved recovery had not yet been determined, the prudence of such costs would be reviewed in the generic proceeding. On May 31, 2013, the NJBPU clarified its earlier order to indicate that the 2011 major storm costs would be reviewed expeditiously in the generic proceeding, with the goal of maintaining the base rate case schedule established by the ALJ where recovery of such costs would be addressed. The NJBPU further indicated that it would review the 2012 major storm costs in the generic proceeding and the recovery of such costs would be considered through a Phase II in the existing base rate case or through another appropriate method to be determined at the conclusion of the generic proceeding. On June 21, 2013, JCP&L filed a detailed report in support of recovery of major storm costs with the NJBPU. On February 24, 2014, a Stipulation was filed with the NJBPU by JCP&L, the Division of Rate Counsel and NJBPU Staff which will allow recovery of $736 million of JCP&L’s $744 million of costs related to the significant weather events of 2011 and 2012. As a result, FirstEnergy recorded a regulatory asset impairment charge of approximately $8 million (pre-tax) as of December 31, 2013. By its Order of March 19, 2014, the NJBPU approved the Stipulation of Settlement. Although the settlement permits recovery of 2011 and 2012 storm costs, the recovery of the 2011 costs will be addressed in the pending base rate case; whereas the manner and timing of recovery of the 2012 storm costs totaling $580 million will be determined by the NJBPU.

OHIO

The Ohio Companies primarily operate under their ESP 3 plan which expires on May 31, 2016. The material terms of ESP 3 include:
Continuing the current base distribution rate freeze through May 31, 2016;
Continues collection of lost distribution revenues associated with energy efficiency and peak demand reduction programs;
Continuing to provide economic development and assistance to low-income customers for the two-year plan period at levels established in the prior ESP;
A 6% generation rate discount to certain low income customers provided by the Ohio Companies through a bilateral wholesale contract with FES (FES is one of the wholesale suppliers to the Ohio Companies);
Continuing to provide power to non-shopping customers at a market-based price set through an auction process;
Continuing Rider DCR that allows continued investment in the distribution system for the benefit of customers;
Continuing commitment not to recover from retail customers certain costs related to transmission cost allocations for the longer of the five-year period from June 1, 2011 through May 31, 2016 or when the amount of costs avoided by customers for certain types of products totals $360 million, subject to the outcome of certain FERC proceedings;
Securing generation supply for a longer period of time by conducting an auction for a three-year period rather than a one-year period, in each of October 2012 and January 2013, to mitigate any potential price spikes for the Ohio Companies' utility customers who do not switch to a competitive generation supplier; and
Extending the recovery period for costs associated with purchasing RECs mandated by SB221, Ohio's renewable energy and energy efficiency standard, through the end of the new ESP 3 period. This is expected to initially reduce the monthly renewable energy charge for all non-shopping utility customers of the Ohio Companies by spreading out the costs over the entire ESP period.

Notices of appeal of the Ohio Companies' ESP 3 plan to the Supreme Court of Ohio were filed by the Northeast Ohio Public Energy Council and the ELPC. The matter has not yet been scheduled for oral argument.

The Ohio Companies filed an application with the PUCO on August 4, 2014 seeking approval of their ESP IV entitled Powering Ohio's Progress. The Ohio Companies have requested a decision by the PUCO by April 8, 2015. The Ohio Companies filed a partial Stipulation and Recommendation on December 22, 2014. The evidentiary hearing on the ESP IV is scheduled to commence on April 13, 2015. The material terms of the proposed plan include:
Continuing a base distribution rate freeze through May 31, 2019;
Continuing collection of lost distribution revenues associated with energy efficiency and peak demand reduction programs;
Providing economic development and assistance to low-income customers for the three-year plan period;
An Economic Stability Program providing for a retail rate stability rider to flow through charges or credits representing the net result of the costs paid to FES through a proposed 15-year purchase power agreement for the output of Sammis, Davis-Besse and FES’ share of OVEC against the revenues received from selling the output into the PJM markets over the same period;
Continuing to provide power to non-shopping customers at a market-based price set through an auction process;
Continuing Rider DCR with increased revenue caps of approximately $30 million per year that allows continued investment supporting the distribution system for the benefit of customers;
A commitment not to recover from retail customers certain costs related to transmission cost allocations for the longer of the five-year period from June 1, 2011 through May 31, 2016 or when the amount of such costs avoided by customers for certain types of products totals $360 million, including appropriately such costs from MISO along with such costs from PJM, subject to the outcome of certain FERC proceedings; and
General updates to electric service regulations and tariffs to reflect regulatory orders, administrative rule changes, and current practices.

Under Ohio's energy efficiency standards (SB221 and SB310), and the Ohio Companies' filing of amended energy efficiency plans, the Ohio Companies are required to implement energy efficiency programs that achieve a total annual energy savings equivalent of approximately 2,237 GWHs in 2014, 2015 and 2016. The Ohio Companies are also required to reduce peak demand in 2009 by 1%, with an additional 0.75% reduction each year thereafter through 2014, and retain the 2014 level for 2015 and 2016, and then increase the benchmark by an additional 0.75% thereafter through 2020.

On March 20, 2013, the PUCO approved the three-year energy efficiency portfolio plans for 2013-2015, estimated to cost the Ohio Companies approximately $250 million over the three-year period, which is expected to be recovered in rates. Applications for rehearing were filed by the Ohio Companies and several other parties. On July 17, 2013, the PUCO denied the Ohio Companies' application for rehearing, in part, but authorized the Ohio Companies to receive 20% of any revenues obtained from offering energy efficiency and DR reserves into the PJM auction. The PUCO also confirmed that the Ohio Companies can recover PJM costs and applicable penalties associated with PJM auctions, including the costs of purchasing replacement capacity from PJM incremental auctions, to the extent that such costs or penalties are prudently incurred. On August 16, 2013, ELPC and OCC filed applications for rehearing, which were granted for the sole purpose of further consideration of the issue. On September 24, 2014, the Ohio Companies filed an amendment to their portfolio plan as contemplated by SB310, seeking to suspend certain programs for the 2015-2016 period in order to better align the plan with the new benchmarks under SB310. On November 20, 2014, the PUCO approved the Ohio Companies' amended portfolio plan. Several applications for rehearing were filed, and the PUCO granted those applications for further consideration of the matters specified in those applications.

On September 16, 2013, the Ohio Companies filed with the Supreme Court of Ohio a notice of appeal of the PUCO's July 17, 2013 Entry on Rehearing related to energy efficiency, alternative energy, and long-term forecast rules stating that the rules issued by the PUCO are inconsistent with, and are not supported by, statutory authority. On October 23, 2013, the PUCO filed a motion to dismiss the appeal, which is still pending. The matter has not been scheduled for oral argument.

Ohio law requires electric utilities and electric service companies in Ohio to serve part of their load from renewable energy resources measured by an annually increasing percentage amount through 2024, except 2015 and 2016 that remain at the 2014 level. The Ohio Companies conducted RFPs in 2009, 2010 and 2011 to secure RECs to help meet these renewable energy requirements. In September 2011, the PUCO opened a docket to review the Ohio Companies' alternative energy recovery rider through which the Ohio Companies recover the costs of acquiring these RECs. The PUCO issued an Opinion and Order on August 7, 2013 approving the Ohio Companies' acquisition process and their purchases of RECs to meet statutory mandates in all instances except for part of the purchases arising from one auction and directing the Ohio Companies to credit non-shopping customers in the amount of $43.4 million, plus interest, on the basis that the Ohio Companies did not prove such purchases were prudent. Based on the PUCO ruling, a regulatory charge of approximately $51 million, including interest, was recorded in the fourth quarter of 2013. On December 24, 2013, following the denial of their application for rehearing, the Ohio Companies filed a notice of appeal and a motion for stay of the PUCO's order with the Supreme Court of Ohio, which was granted. On February 18, 2014, the OCC and the ELPC also filed appeals of the PUCO's order. The Ohio Companies filed their merit brief with the Supreme Court of Ohio on March 6, 2014 and the briefing process concluded on December 24, 2014. The matter is not yet scheduled for oral argument.

On April 9, 2014, the PUCO initiated a generic investigation of marketing practices in the competitive retail electric service market, with a focus on the marketing of fixed-price or guaranteed percent-off SSO rate contracts where there is a provision that permits the pass-through of new or additional charges.

PENNSYLVANIA

The Pennsylvania Companies currently operate under DSPs that expire on May 31, 2015, and provide for the competitive procurement of generation supply for customers that do not choose an alternative EGS or for customers of alternative EGSs that fail to provide the contracted service. The default service supply is currently provided by wholesale suppliers through a mix of long-term and short-term contracts procured through descending clock auctions, competitive requests for proposals and spot market purchases. On July 24, 2014, the PPUC unanimously approved a settlement of the Pennsylvania Companies' DSPs for the period of June 1, 2015 through May 31, 2017, that provides for quarterly descending clock auctions to procure 3, 12 and 24-month energy contracts, as well as one RFP seeking 2-year contracts to secure SRECs for ME, PN and Penn.

The PPUC entered an Order on March 3, 2010 that denied the recovery of marginal transmission losses through the TSC rider for the period of June 1, 2007 through March 31, 2008, and directed ME and PN to submit a new tariff or tariff supplement reflecting the removal of marginal transmission losses from the TSC. Pursuant to a plan approved by the PPUC, ME and PN refunded those amounts to customers over 29-months concluding in the second quarter of 2013. On appeal, the Commonwealth Court affirmed the PPUC's Order to the extent that it holds that line loss costs are not transmission costs and, therefore, the approximately $254 million in marginal transmission losses and associated carrying charges for the period prior to January 1, 2011, are not recoverable under ME's and PN's TSC riders. The Pennsylvania Supreme Court denied ME's and PN's Petition for Allowance of Appeal and the Supreme Court of the United States denied ME's and PN's Petition for Writ of Certiorari. The U.S. District Court for the Eastern District of Pennsylvania granted the PPUC's motion to dismiss the complaint filed by ME and PN to obtain an order that would enjoin enforcement of the PPUC and Pennsylvania court orders under a theory of federal preemption on the question of retail rate recovery of the marginal transmission loss charges. As a result of the U.S. District Court's decision, FirstEnergy recorded a regulatory asset impairment charge of approximately $254 million (pre-tax) in the quarter ended September 30, 2013. On appeal, on September 16, 2014, in a split decision, two judges of a three-judge panel of the United States Court of Appeals for the Third Circuit affirmed the U.S. District Court's dismissal of the complaint, agreeing that ME and PN had litigated the issue in the state proceedings and thus were precluded from subsequent litigation in federal court. On September 30, 2014, ME and PN filed for rehearing and rehearing en banc before the Third Circuit and, on October 15, 2014, the Third Circuit rejected that rehearing request. ME and PN filed a Petition for Certiorari with the U.S. Supreme Court on February 12, 2015.

Pursuant to Pennsylvania's EE&C legislation (Act 129 of 2008), the PPUC was charged with reviewing the cost effectiveness of energy efficiency and peak demand reduction programs. The PPUC found the energy efficiency programs to be cost effective and directed all of the electric utilities in Pennsylvania to submit by November 15, 2012, a Phase II EE&C Plan that would be in effect for the period June 1, 2013 through May 31, 2016. The PPUC deferred ruling on the need to create peak demand reduction targets and did not include a peak demand reduction requirement in the Phase II plans. On March 14, 2013, the PPUC adopted a settlement among the Pennsylvania Companies and interested parties and approved the Pennsylvania Companies' Phase II EE&C Plans for the period 2013-2016. Total costs of these plans are expected to be approximately $234 million and recoverable through the Pennsylvania Companies' reconcilable EE&C riders.

On August 4, 2014, the Pennsylvania Companies each filed tariffs with the PPUC proposing general rate increases associated with their distribution operations. The filings request approval to increase operating revenues by approximately $151.9 million at ME, $119.8 million at PN, $28.5 million at Penn, and $115.5 million at WP based upon fully projected future test years for the twelve months ending April 30, 2016 at each of the Pennsylvania Companies. On February 3, 2015, each of the Pennsylvania Companies filed a Joint Petition for Settlement seeking PPUC approval of the agreements reached in each proceeding which included, among other things: 1) increases in current distribution revenues of $89.3 million for ME, $90.8 million for PN, $15.9 million for Penn and $96.8 million for WP; 2) a Universal Services Charge Rider to be established for WP; 3) storm reserve accounts for future storm recovery to be established for each of the Pennsylvania Companies; and 4) certain other operational and customer service-related provisions. The sole issue reserved for briefing was with respect to the scope and pricing of the Companies' proposed LED offerings. Orders on the proposed increases are expected in May 2015.

WEST VIRGINIA

On April 30, 2014, MP and PE filed a rate case, as amended on June 13, 2014, requesting a base rate increase of approximately $104 million, or 9.9%, based on an historic 2013 test year. The filing also included a request for an additional $48 million to recover by surcharge costs for new and existing vegetation management programs. On November 3, 2014, a Joint Stipulation was submitted by all parties which settled all issues in the proceeding. The settlement includes, among other things: a $15 million increase in base rate revenues effective February 25, 2015; the implementation of a Vegetation Management Surcharge effective February 25, 2015 to recover all costs related to both new and existing vegetation maintenance programs; authority to establish a regulatory asset for MATS investments placed into service in 2016 and 2017; authority to defer, amortize and recover over a 5-year period approximately $46 million of storm restoration costs; and elimination of the Temporary Transaction Surcharge for costs associated with MP's acquisition of the Harrison plant in October 2013 and movement of those costs into base rates effective February 25, 2015. On February 3, 2015, the WVPSC approved the settlement in full and without modification. MP and PE's new rates will go into effect February 25, 2015.

On August 29, 2014, MP and PE filed their annual ENEC case proposing an approximate $65.8 million annual increase in ENEC rates, which is a 5.7% overall increase to existing rates. The increase is comprised of an actual $51.6 million under-recovered balance as of June 30, 2014, and a projected $14.2 million in under-recovery for the 2015 rate effective period. A settlement was reached by all the parties, which was filed with the WVPSC on December 2, 2014. The parties agreed to defer $16.8 million of the energy portion of the under-recovery balance for medium and large customers for one year at a carrying cost of 4% in order to mitigate the proposed rate impact to those customers. The settlement permits MP and PE to recover all of their costs incurred during the two year review period and closes the review period except for two coal issues for further review in next year’s ENEC case. On January 29, 2015, the WVPSC approved the settlement in full without modification and new ENEC rates will go into effect February 25, 2015.

RELIABILITY MATTERS

Federally-enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements on the Utilities, FES, AE Supply, FG, FENOC, NG, ATSI and TrAIL. NERC is the ERO designated by FERC to establish and enforce these reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to eight regional entities, including RFC. All of FirstEnergy's facilities are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability standards implemented and enforced by RFC.

FirstEnergy believes that it is in compliance with all currently-effective and enforceable reliability standards. Nevertheless, in the course of operating its extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy's part to comply with the reliability standards for its bulk electric system could result in the imposition of financial penalties that could have a material adverse effect on its financial condition, results of operations and cash flows.

FERC MATTERS

PJM Transmission Rates

PJM and its stakeholders have been debating the proper method to allocate costs for new transmission facilities. While FirstEnergy and other parties advocate for a traditional "beneficiary pays" (or usage based) approach, others advocate for “socializing” the costs on a load-ratio share basis, where each customer in the zone would pay based on its total usage of energy within PJM. This question has been the subject of extensive litigation before FERC and the appellate courts, including most recently before the Seventh Circuit. On June 25, 2014, a divided three-judge panel of the Seventh Circuit ruled that FERC had not quantified the benefits that western PJM utilities would derive from certain new 500 kV or higher lines and thus had not adequately supported its decision to socialize the costs of these lines. The majority found that eastern PJM utilities are the primary beneficiaries of the lines, while western PJM utilities are only incidental beneficiaries, and that, while incidental beneficiaries should pay some share of the costs of the lines, that share should be proportionate to the benefit they derive from the lines, and not on load-ratio share in PJM as a whole. The court remanded the case to FERC, which issued an order setting the issue of cost allocation for hearing and settlement proceedings. Settlement discussions under a FERC-appointed settlement judge are ongoing.

Order No. 1000, issued by FERC on July 21, 2011, announced new policies regarding transmission planning and transmission cost allocation, requiring the submission of a compliance filing by PJM and the PJM transmission owners demonstrating that the cost allocation methodology for new transmission projects directed by the PJM Board of Managers satisfied the principles set forth in the order. On August 15, 2014 the U.S. Court of Appeals for the D.C. Circuit affirmed Order No. 1000, including its termination of certain "right of first refusal" privileges discussed in more detail below. The court subsequently denied a request for rehearing of its decision.

In series of orders, including certain of the orders related to the Order No. 1000 proceedings, FERC has asserted that the PJM transmission owners do not hold an incumbent “right of first refusal” to construct, own and operate transmission projects within their respective footprints that are approved as part of PJM’s RTEP process. FirstEnergy and other PJM transmission owners have appealed these rulings, and those appeals are pending before the U.S. Court of Appeals for the D.C. Circuit.

To demonstrate compliance with the regional cost allocation principles of Order No. 1000, the PJM transmission owners, including FirstEnergy, proposed a hybrid allocation of 50% beneficiary pays and 50% socialized to be effective for RTEP projects approved by the PJM Board of Managers on, and after, the requested February 1, 2013 effective date of the compliance filing. FERC has accepted that approach.

Separately, the PJM transmission owners, including FirstEnergy, submitted filings to FERC setting forth the cost allocation method for projects that cross the borders between the PJM Region and: (1) the NYISO region; (2) the MISO region; and (3) the FERC-jurisdictional members of the SERTP region. These filings propose to allocate the cost of these interregional transmission projects based on the costs of projects that otherwise would have been constructed separately in each region, or, in the case of MISO, indicate that the cost allocation provisions for interregional transmission projects provided in the Joint Operating Agreement between PJM and MISO comply with the requirements of Order No. 1000. FERC accepted the PJM/MISO and PJM/SERTP filing, subject to refund and further compliance requirements. The PJM/NYISO cross-border project cost allocation filing remains pending before FERC.

The outcome of these proceedings and their impact, if any, on FirstEnergy cannot be predicted at this time.

RTO Realignment

On June 1, 2011, ATSI and the ATSI zone transferred from MISO to PJM. While many of the matters involved with the move have been resolved, FERC denied recovery under ATSI's transmission rate for certain charges that collectively can be described as "exit fees" and certain other transmission cost allocation charges totaling approximately $78.8 million until such time as ATSI submits a cost/benefit analysis demonstrating net benefits to customers from the move. FERC rejected a proposed settlement agreement to resolve the exit fee and transmission cost allocation issues, stating that its action is without prejudice to ATSI submitting a cost/benefit analysis demonstrating that the benefits of the RTO realignment decisions outweigh the exit fee and transmission cost allocation charges. FirstEnergy's request for rehearing of FERC's order remains pending.

Separately, the question of ATSI's responsibility for certain costs for the “Michigan Thumb” transmission project continues to be disputed. Potential responsibility arises under the MISO MVP tariff, which has been litigated in complex proceedings before FERC and certain U.S. appellate courts. In the event of a final non-appealable order that rules that ATSI must pay these charges, ATSI will seek recovery of these charges through its formula rate. On a related issue, FirstEnergy joined certain other PJM transmission owners in a protest of MISO's proposal to allocate MVP costs to energy transactions that cross MISO's borders into the PJM Region. On January 22, 2015, FERC issued an order establishing a paper hearing on remand from the Seventh Circuit of the issue of whether any limitation on "export pricing" for sales of energy from MISO into PJM is justified in light of applicable FERC precedent. Initial comments on the MISO/PJM MVP issue are due March 9, 2015, and reply comments are due April 8, 2015.

In addition, in a May 31, 2011 order, FERC ruled that the costs for certain "legacy RTEP" transmission projects in PJM approved before ATSI joined PJM could be charged to transmission customers in the ATSI zone. The amount to be paid, and the question of derived benefits, is pending before FERC as a result of the Seventh Circuit's June 25, 2014 order described above under PJM Transmission Rates.

The outcome of those proceedings that address the remaining open issues related to ATSI's move into PJM cannot be predicted at this time.

2014 ATSI Formula Rate Filing

On October 31, 2014, ATSI filed a proposal with FERC to change the structure of its formula rate. The proposed change requested to move from an “historical looking” approach, where transmission rates reflect actual costs for the prior year, to a “forward looking” approach, where transmission rates would be based on the estimated costs for the coming year, with an annual true up. Several parties protested ATSI's filing. On December 31, 2014, FERC issued an order accepting ATSI's filing effective January 1, 2015, as requested, subject to refund and the outcome of hearing and settlement proceedings. Settlement discussions under a FERC-appointed settlement judge are ongoing. FERC also initiated an inquiry pursuant to Section 206 of the FPA into ATSI's ROE and certain other matters, with a refund effective date of January 12, 2015, for any refund resulting from the inquiry. A procedural schedule for the Section 206 inquiry has not yet been established.
California Claims Matters

In October 2006, several California governmental and utility parties presented AE Supply with a settlement proposal to resolve alleged overcharges for power sales by AE Supply to the California Energy Resource Scheduling division of the CDWR during 2001. The settlement proposal claims that CDWR is owed approximately $190 million for these alleged overcharges. This proposal was made in the context of mediation efforts by FERC and the Ninth Circuit in several pending proceedings to resolve all outstanding refund and other claims, including claims of alleged price manipulation in the California energy markets during 2000 and 2001. The Ninth Circuit had previously remanded one of those proceedings to FERC, which dismissed the claims of the California Parties in May 2011. The California Parties appealed FERC's decision back to the Ninth Circuit, where the appeal remains pending. AE Supply joined with other intervenors in the case and filed a brief in support of FERC's dismissal of the case. Oral argument was held on February 11, 2015. The matter is now before the Ninth Circuit for decision.

In another proceeding, in June 2009, the California Attorney General, on behalf of certain California parties, filed a complaint with FERC against various sellers, including AE Supply, again seeking refunds for transactions in the California energy markets during 2000 and 2001. The above-noted transactions with CDWR are the basis for including AE Supply in this complaint. AE Supply filed a motion to dismiss, which FERC granted. The California Attorney General appealed FERC's dismissal of its complaint to the Ninth Circuit, which has consolidated the case with other pending appeals related to California refund claims, and stayed the proceedings pending further order.

FirstEnergy cannot predict the outcome of either of the above matters or estimate the possible loss or range of loss.

PATH Transmission Project

On August 24, 2012, the PJM Board of Managers canceled the PATH project, a proposed transmission line from West Virginia through Virginia and into Maryland which PJM had previously suspended in February 2011. As a result of PJM canceling the project, approximately $62 million and approximately $59 million in costs incurred by PATH-Allegheny and PATH-WV (an equity method investment for FE), respectively, were reclassified from net property, plant and equipment to a regulatory asset for future recovery. PATH-Allegheny and PATH-WV requested authorization from FERC to recover the costs with a proposed ROE of 10.9% (10.4% base plus 0.5% for RTO membership) from PJM customers over five years. FERC issued an order denying the 0.5% ROE adder for RTO membership and allowing the tariff changes enabling recovery of these costs to become effective on December 1, 2012, subject to settlement judge proceedings and hearing if the parties do not agree to a settlement. On March 24, 2014, the FERC Chief ALJ terminated settlement judge procedures and appointed an ALJ to preside over the hearing phase of the case. The FERC Chief ALJ later extended the procedural schedule to allow time for the parties to address the applicability of FERC's Opinion No. 531 to the PATH proceedings. FERC's Opinion No. 531, as discussed below, revises FERC's methodology for calculating ROE. The hearing is scheduled to commence in March 2015.

MISO Capacity Portability

On June 11, 2012, in response to certain arguments advanced by MISO, FERC issued a Notice of Request for Comments regarding whether existing rules on transfer capability act as barriers to the delivery of capacity between MISO and PJM. FirstEnergy and other parties have submitted filings arguing that MISO's concerns largely are without foundation and suggested that FERC address the remaining concerns in the existing stakeholder process that is described in the PJM/MISO Joint Operating Agreement. FERC has not mandated a solution, and the RTOs and affected parties are working to address the MISO's proposal in stakeholder proceedings. In January 2015, the RTOs and affected parties indicated to FERC that discussions on the various issues are continuing. Changes to the criteria and qualifications for participation in the PJM RPM capacity auctions could have a significant impact on the outcome of those auctions, including a negative impact on the prices at which those auctions would clear.

FTR Underfunding Complaint

In PJM, FTRs are a mechanism to hedge congestion and operate as a financial replacement for physical firm transmission service. FTRs are financially-settled instruments that entitle the holder to a stream of revenues based on the hourly congestion price differences across a specific transmission path in the PJM Day-ahead Energy Market. FE also performs bilateral transactions for the purpose of hedging the price differences between the location of supply resources and retail load obligations. Due to certain language in the PJM Tariff, the funds that are set aside to pay FTRs can be diverted to other uses, resulting in “underfunding” of FTR payments. Since June 2010, FES and AE Supply have lost more than $94 million in revenues that they otherwise would have received as FTR holders to hedge congestion costs. FES and AE Supply expect to continue to experience significant underfunding.

On February 15, 2013, FES and AE Supply filed a renewed complaint with FERC for the purpose of changing the PJM Tariff to eliminate FTR underfunding. On June 5, 2013, FERC issued its order denying the new complaint. Requests for rehearing, and all subsequent filings in the docket, are pending before FERC. The PJM stakeholders continue to discuss FTR underfunding.

A recent and related issue is the effect that certain financial trades have on congestion. On August 29, 2014, FERC instituted an investigation to address the question of whether the current rules regarding “Up-to Congestion” transactions are just and reasonable. FESC, on behalf of FES and the Utilities, filed comments supporting the investigation, arguing that PJM Tariff changes would decrease the incidence of Up-to Congestion transactions, and funding for FTRs likely would increase. FERC convened a technical conference on January 7, 2015 to discuss application of certain FTR-related rules to Up-to Congestion and virtual transactions and whether PJM’s current uplift allocation for Up-to Congestion and virtual transactions is just and reasonable. FERC action following the technical conference is pending.

PJM Market Reform: 2014 PJM RPM Tariff Amendments

In late 2013 and early 2014, PJM submitted a series of amendments to the PJM Tariff to ensure that resources that clear in the RPM auctions are available as physical resources in the delivery year and that the rules implement comparable obligations for different types of resources. PJM's filings can be grouped into four categories: (i) DR; (ii) imports; (iii) modeling of transmission upgrades in calculating geographic clearing prices; and (iv) arbitrage/capacity replacement. In each of the relevant dockets, FirstEnergy and other parties submitted comments largely supporting PJM's proposed amendments. FERC largely approved the PJM Tariff amendments as proposed by PJM regarding DR, imports, and transmission upgrade modeling. Compliance filings pursuant to and requests for rehearing of certain of these orders are pending before FERC. However, FERC rejected the arbitrage/capacity replacement amendments, directing instead that a technical conference be convened to further examine the issues. The technical conference has yet to be scheduled.

PJM Market Reform: PJM Capacity Performance Proposal and 2015/2016 Reliability Filings

On December 12, 2014, PJM submitted two filings to implement its proposed “Capacity Performance” reform of the RPM capacity market. PJM proposes to revise the PJM Tariff to, among other things: (i) adopt a modified version of the FERC-approved ISO New England Inc. capacity performance payment structure; (ii) allow no excuses for nonperformance except under certain defined circumstances; (iii) maintain DR as a supply-side resource; and (iv) impose a Capacity Performance Resource must-offer requirement (units that can perform as a Capacity Performance Resource must offer into the capacity market, except certain defined resources, including DR). PJM also proposes, among other things, to revise the PJM Operating Agreement to provide limits in energy market offers based on specific physical characteristics and to ensure that capacity resources are available when the PJM Region needs them to perform. PJM requested an effective date of April 1, 2015 for these proposed reforms. Numerous parties filed comments on and protests to PJM’s Capacity Performance filings. FESC, on behalf of its affected affiliates, and, as part of a coalition of certain other PJM utilities, filed comments and protests on the proposed reforms. PJM's filings and all related pleadings are pending before FERC.

In addition, on December 24, 2014, PJM submitted two filings seeking to ensure enough capacity is available during the 2015/2016 Delivery Year. First, PJM proposed to revise the PJM Tariff to allow PJM to procure an undetermined amount of additional capacity for the 2015/2016 Delivery Year to address reliability concerns. PJM requested an effective date of February 23, 2015 for this revision. Second, PJM requested a one-time PJM Tariff waiver that would permit PJM to keep approximately 2,000 MW of committed capacity that should be released for the third incremental auction for the 2015/2016 Delivery Year. Without the waiver, PJM would be required under the PJM Tariff to release this capacity. PJM requests an effective date of February 23, 2015 for the waiver. Numerous parties filed comments on and protests to these PJM filings. FESC, on behalf of its affected affiliates, and, as part of a coalition of certain other PJM utilities, filed comments in support of both PJM filings and seeking additional information from PJM about the scope of any capacity shortfall. PJM's filings and all related pleadings are pending before FERC.

PJM Market Reform: PJM RPM Auctions - Calculation of Unit-Specific Offer Caps

The PJM Tariff describes the rules for calculating the “offer cap” for each unit that offers into the RPM auctions. FES disagreed with the PJM Market Monitor's approach for calculating the offer caps and in 2014, FES asked FERC to determine which PJM Tariff interpretation, FES's or the PJM Market Monitor's, was correct. On August 25, 2014, FERC issued a declaratory order agreeing with the FES interpretation of the PJM Tariff language. FERC went on, however, to initiate a new proceeding to examine whether the existing PJM Tariff language is just and reasonable. PJM filed its brief explaining why the existing PJM Tariff language is just and reasonable. Other parties, including FES, submitted responsive briefs. The briefs and related pleadings are pending before FERC.

PJM Market Reform: FERC Order No. 745 - DR

On May 23, 2014, a divided three-judge panel of the U.S. Court of Appeals for the D.C. Circuit issued an opinion vacating FERC Order No. 745, which required that, under certain parameters, DR participating in organized wholesale energy markets be compensated at LMP. The majority concluded that DR is a retail service, and therefore falls under state, and not federal, jurisdiction, and that FERC, therefore, lacks jurisdiction to regulate DR. The majority also found that even if FERC had jurisdiction over DR, Order No. 745 would be arbitrary and capricious because, under its requirements, DR was inappropriately receiving a double payment (LMP plus the savings of foregone energy purchases). On January 15, 2015, FERC and a coalition of DR providers and industrial end-user groups filed separate petitions for U.S. Supreme Court review of the May 23, 2014 decision. Responses to those petitions are due March 19, 2015. The U.S. Court of Appeals for the D.C. Circuit will withhold issuance of the mandate pending the United States Supreme Court's disposition of those petitions.

On May 23, 2014, FESC, on behalf of its affiliates with market-based rate authorization, filed a complaint asking FERC to issue an order requiring the removal of all portions of the PJM Tariff allowing or requiring DR to be included in the PJM capacity market, with a refund effective date of May 23, 2014. FESC also requested that the results of the May 2014 PJM BRA be considered void and legally invalid to the extent that DR cleared that auction because the participation of DR in that auction was unlawful in light of the May 23, 2014 U.S. Court of Appeals for the D.C. Circuit decision discussed above. FESC, on behalf of FES, subsequently filed an amended complaint renewing its request that DR be removed from the May 2014 BRA. Specifically, FESC requested that FERC direct PJM to recalculate the results of the May 2014 BRA by: (i) removing DR from the PJM capacity supply pool; (ii) leaving the offers of actual capacity suppliers unchanged; and then (iii) determining which capacity suppliers clear the auction on the basis of the offers they submitted consistent with the existing PJM Tariff once the unlawful DR resources have been removed. The complaint remains pending before FERC. The timing of FERC action and the outcome of this proceeding cannot be predicted at this time.

On January 14, 2015, PJM filed proposed amendments to the PJM Tariff for the purpose of addressing the uncertainty of DR. The amendments, which will become effective only in certain defined conditions, purport to be in response to the U.S. Court of Appeals for the D.C. Circuit's May 23, 2014 decision regarding FERC's jurisdiction to regulate DR, as discussed above. If implemented, the amendments will move DR from the supply side to the load side for purposes of PJM's RPM capacity markets, and will permit loads to bid load reductions into the RPM auctions occurring after April 1, 2015. On February 13, 2015, FirstEnergy, as part of a coalition, filed a protest against PJM's proposed amendments. FirstEnergy expects further filings before FERC rules on this matter.

PJM Market Reform: PJM 2014 Triennial RPM Review

The PJM Tariff obligates PJM to perform a thorough review of its RPM program every three years. On September 25, 2014, PJM filed proposed changes to the PJM Tariff as part of the latest review cycle. Among other adjustments, the filing included: (i) shifting the VRR curve one percentage point to the right, which would increase the amount of capacity supply that is procured in the RPM auctions and the clearing price; and (ii) a change to the index used for calculating the generation plant construction costs of the Net CONE formula for the future years between triennial reviews. On November 28, 2014, FERC accepted the PJM Tariff amendments as proposed, subject to a minor compliance requirement. PJM subsequently submitted the required compliance filing. On December 23, 2014, a coalition including FESC, on behalf of its affected affiliates, requested rehearing of FERC's order. PJM's compliance filing, and the coalition's and others' requests for rehearing, remain pending before FERC.

Market-Based Rate Authority, Triennial Update

The Utilities, AE Supply, FES, FG, NG, FirstEnergy Generation Mansfield Unit 1 Corp., Buchanan Generation, LLC, and Green Valley Hydro, LLC each hold authority from FERC to sell electricity at market-based rates. One condition for retaining this authority is that every three years each entity must file an update with the FERC that demonstrates that each entity continues to meet FERC’s requirements for holding market-based rate authority. On December 20, 2013, FESC, on behalf of its affiliates with market-based rate authority, submitted to FERC the most recent triennial market power analysis filing for each market-based rate holder for the current cycle of this filing requirement. On August 13, 2014, FERC accepted the triennial filing as submitted.

FERC Opinion No. 531

On June 19, 2014, FERC issued Opinion No. 531, in which FERC revised its approach for calculating the discounted cash flow element of FERC’s ROE methodology, and announced a qualitative adjustment to the ROE methodology results. Under the old methodology, FERC used a five-year forecast for the dividend growth variable, whereas going forward the growth variable will consist of two parts: (a) a five-year forecast for dividend growth (2/3 weight); and (b) a long-term dividend growth based on a forecast for the U.S. economy (1/3 weight). Regarding the qualitative adjustment, FERC formerly pegged ROE at the mid-point of the “zone of reasonableness” that came out of the ROE formula, whereas going forward, FERC may rely on record evidence to make qualitative adjustments to the outcome of the ROE methodology in order to reach a level sufficient to attract future investment. Requests for rehearing of Opinion No. 531 are currently pending before FERC. On October 16, 2014, FERC issued its Opinion No. 531-A, applying the revised ROE methodology to certain ISO New England Inc. transmission owners. FirstEnergy is evaluating the potential impact of Opinion No. 531 on the authorized ROE of our FERC-regulated transmission utilities and the cost-of-service wholesale power generation transactions of MP.