NOTE 17—COMMITMENTS AND CONTINGENCIES

General Guarantees and Indemnifications. In the normal course of business, the Company enters into numerous real estate leasing and aircraft financing arrangements that have various guarantees included in the contracts. These guarantees are primarily in the form of indemnities under which the Company typically indemnifies the lessors and any tax/financing parties against tort liabilities that arise out of the use, occupancy, operation or maintenance of the leased premises or financed aircraft. Currently, the Company believes that any future payments required under these guarantees or indemnities would be immaterial, as most tort liabilities and related indemnities are covered by insurance (subject to deductibles). Additionally, certain leased premises such as fueling stations or storage facilities include indemnities of such parties for any environmental liability that may arise out of or relate to the use of the leased premises.

 

Legal and Environmental Contingencies. The Company has certain contingencies resulting from litigation and claims incident to the ordinary course of business. Management believes, after considering a number of factors, including (but not limited to) the information currently available, the views of legal counsel, the nature of contingencies to which the Company is subject and prior experience, that the ultimate disposition of these contingencies will not materially affect the Company's consolidated financial position or results of operations.

The Company records liabilities for legal and environmental claims when a loss is probable and reasonably estimable. These amounts are recorded based on the Company's assessments of the likelihood of their eventual disposition.

Commitments. The table below summarizes the Company's commitments as of December 31, 2011, which primarily relate to the acquisition of aircraft and related spare engines, aircraft improvements and include other commitments primarily to acquire information technology services and assets (in millions):

 

                         
     UAL      United      Continental  

2012

   $ 1,625       $ 167       $ 1,458   

2013

     1,091         79         1,012   

2014

     1,025         95         930   

2015

     1,772         373         1,399   

2016

     1,817         1,137         680   

After 2016

     5,697         5,697         —     
    

 

 

    

 

 

    

 

 

 
     $ 13,027       $ 7,548       $ 5,479   
    

 

 

    

 

 

    

 

 

 

United Aircraft Commitments

As of December 31, 2011, United had firm commitments to purchase 50 new aircraft (25 Boeing 787 aircraft and 25 Airbus A350XWB aircraft) scheduled for delivery from 2016 through 2019. United also has options to purchase 42 Airbus A319 and A320 aircraft, and purchase rights for 50 Boeing 787 aircraft and 50 Airbus A350XWB aircraft.

United has secured considerable backstop financing commitments from its aircraft and engine manufacturers, subject to certain customary conditions. However, United can provide no assurance that backstop financing, or any other financing not already in place, for aircraft and engine deliveries will be available to United on acceptable terms when necessary or at all.

Continental Aircraft Commitments

As of December 31, 2011, Continental had firm commitments to purchase 82 new aircraft (57 Boeing 737 aircraft and 25 Boeing 787 aircraft) scheduled for delivery from 2012 through 2016. Continental expects to place into service 19 Boeing 737 aircraft, of which two have been delivered prior to the filing of this report, and five Boeing 787 aircraft in 2012. Continental also has options to purchase 89 additional Boeing 737 and 787 aircraft.

Continental does not have backstop financing or any other financing currently in place for the Boeing aircraft on order. Financing will be necessary to satisfy Continental's capital commitments for its firm order aircraft and other related capital expenditures. Continental can provide no assurance that backstop financing, or any other financing not already in place, for aircraft and engine deliveries will be available to Continental on acceptable terms when necessary or at all.

The Company is currently in discussions with Boeing over potential compensation related to delays in the 787 aircraft deliveries. The Company is not able to estimate the ultimate success, amount of, nature or timing of any potential recoveries from Boeing over such delays.

 

Credit Card Processing Agreements

United and Continental have agreements with financial institutions that process customer credit card transactions for the sale of air travel and other services. Under certain of United's and Continental's credit card processing agreements, the financial institutions either require, or under certain circumstances have the right to require, that United and Continental maintain a reserve equal to a portion of advance ticket sales that have been processed by that financial institution, but for which United and Continental have not yet provided the air transportation.

As of December 31, 2011, United and Continental provided a reserve of $25 million, as required under their combined credit card processing agreement with JPMorgan Chase Bank, N.A. and Paymentech, LLC. Additional reserves may be required under this or other credit card processing agreements of United or Continental if the amount of unrestricted cash, cash equivalents, short-term investments and undrawn amounts under any revolving credit facilities held by United and Continental is less than $3.5 billion as of any calendar month-end measurement date. In addition, in certain circumstances, an increase in the future reserve requirements and the posting of a significant amount of cash collateral as provided by the terms of any or all of United's and Continental's material credit card processing agreements could materially reduce the Company's liquidity.

Guarantees and Off-Balance Sheet Financing

Fuel Consortia. The Company participates in numerous fuel consortia with other air carriers at major airports to reduce the costs of fuel distribution and storage. Interline agreements govern the rights and responsibilities of the consortia members and provide for the allocation of the overall costs to operate the consortia based on usage. The consortium (and in limited cases, the participating carriers) have entered into long-term agreements to lease certain airport fuel storage and distribution facilities that are typically financed through tax-exempt bonds (either special facilities lease revenue bonds or general airport revenue bonds), issued by various local municipalities. In general, each consortium lease agreement requires the consortium to make lease payments in amounts sufficient to pay the maturing principal and interest payments on the bonds. As of December 31, 2011, approximately $1.4 billion principal amount of such bonds were secured by significant fuel facility leases in which UAL participates, as to which UAL and each of the signatory airlines has provided indirect guarantees of the debt. As of December 31, 2011, UAL's contingent exposure was approximately $271 million principal amount of such bonds based on its recent consortia participation. As of December 31, 2011, United's and Continental's contingent exposure related to these bonds, based on its recent consortia participation, was approximately $214 million and $57 million, respectively. The Company's contingent exposure could increase if the participation of other air carriers decreases. The guarantees will expire when the tax-exempt bonds are paid in full, which ranges from 2011 to 2041. The Company did not record a liability at the time these indirect guarantees were made.

Guarantees. United has guaranteed interest and principal payments on $270 million of the Denver Bonds, which were originally issued in 1992, but were subsequently redeemed and reissued in 2007 and are due in 2032 unless United elects not to extend its equipment and ground lease in which case the bonds are due in 2023. The related lease obligation is accounted for as an operating lease with the associated expense recorded on a straight-line basis resulting in ratable accrual of the final $270 million lease obligation over the expected lease term through 2032, and is included in our lease commitments disclosed in Note 15. Continental has guaranteed approximately $1.6 billion in aggregate principal amount of tax-exempt special facilities revenue bonds and interest thereon, excluding the US Airways contingent liability described below.

Continental is contingently liable for US Airways' obligations under a lease agreement between US Airways and the Port Authority of New York and New Jersey related to the East End Terminal at LaGuardia (which lease agreement was assigned by US Airways to Delta Air Lines, Inc. ("Delta")). These obligations include the payment of ground rentals to the Port Authority and the payment of other rentals in respect of the full amounts owed on special facilities revenue bonds issued by the Port Authority having an outstanding par amount of $79 million at December 31, 2011, and a final scheduled maturity in 2015. If both US Airways and Delta default on these obligations, Continental would be obligated to cure the default and would have the right to occupy the terminal after US Airways' and Delta's interest in the lease had been terminated.

In the Company's financing transactions that include loans, the Company typically agrees to reimburse lenders for any reduced returns with respect to the loans due to any change in capital requirements and, in the case of loans in which the interest rate is based on the LIBOR for certain other increased costs that the lenders incur in carrying these loans as a result of any change in law, subject in most cases to certain mitigation obligations of the lenders. At December 31, 2011, UAL had $2.9 billion of floating rate debt (consisting of United's $2.1 billion and Continental's $820 million of debt) and $405 million of fixed rate debt (consisting of United's $205 million and Continental's $200 million of debt), with remaining terms of up to ten years, that are subject to these increased cost provisions. In several financing transactions involving loans or leases from non-U.S. entities, with remaining terms of up to ten years and an aggregate balance of $3.3 billion (consisting of United's $2.3 billion and Continental's $964 million balance), the Company bears the risk of any change in tax laws that would subject loan or lease payments thereunder to non-U.S. entities to withholding taxes, subject to customary exclusions.

Houston Bush Terminal B Redevelopment Project. In May 2011, UAL, in partnership with the Houston Airport System, announced that it would begin construction of the first phase of a three-phase $1 billion terminal improvement project for Terminal B at George Bush Intercontinental Airport ("Houston Bush") by the end of 2011. In November 2011, the City of Houston issued approximately $113 million of special facilities revenue bonds to finance the construction of a new south concourse at Houston Bush dedicated to the Company's regional jet operations. The bonds are guaranteed by Continental and are payable from certain rentals paid by Continental under a special facilities lease agreement with the City of Houston. UAL's initial commitment is to construct the first phase of the currently anticipated three-phase project. UAL's cost of construction of phase one of the project is currently estimated to be approximately $100 million and is funded by special facilities revenue bonds. Construction of the remaining phases of the project will be based on demand over the next 7 to 10 years, with phase one currently expected to be completed in late 2013.

Based on a qualitative assessment of the Houston Bush Terminal B Redevelopment Project due to the fact that Continental is guaranteeing the special facilities revenue bonds and the requirement that UAL or one of its subsidiaries fund cost overruns with no stated limits, the Company being considered the owner of the property during the construction period for accounting purposes. As a result, the construction project is being treated as a financing transaction such that the property and related financing will be included on UAL's consolidated balance sheet as an asset under operating property and equipment and an obligation under long-term liabilities.

Labor Negotiations. As of December 31, 2011, UAL and its subsidiaries had approximately 87,000 active employees, of whom approximately 72% are represented by various U.S. labor organizations. United and Continental had approximately 82% and 61%, respectively, of their active employees represented by various U.S. labor organizations. We are in the process of negotiating amended collective bargaining agreements with our employee groups.

United Airlines Inc [Member]
 
Commitments And Contingencies

NOTE 17—COMMITMENTS AND CONTINGENCIES

General Guarantees and Indemnifications. In the normal course of business, the Company enters into numerous real estate leasing and aircraft financing arrangements that have various guarantees included in the contracts. These guarantees are primarily in the form of indemnities under which the Company typically indemnifies the lessors and any tax/financing parties against tort liabilities that arise out of the use, occupancy, operation or maintenance of the leased premises or financed aircraft. Currently, the Company believes that any future payments required under these guarantees or indemnities would be immaterial, as most tort liabilities and related indemnities are covered by insurance (subject to deductibles). Additionally, certain leased premises such as fueling stations or storage facilities include indemnities of such parties for any environmental liability that may arise out of or relate to the use of the leased premises.

Legal and Environmental Contingencies. The Company has certain contingencies resulting from litigation and claims incident to the ordinary course of business. Management believes, after considering a number of factors, including (but not limited to) the information currently available, the views of legal counsel, the nature of contingencies to which the Company is subject and prior experience, that the ultimate disposition of these contingencies will not materially affect the Company's consolidated financial position or results of operations.

The Company records liabilities for legal and environmental claims when a loss is probable and reasonably estimable. These amounts are recorded based on the Company's assessments of the likelihood of their eventual disposition.

Commitments. The table below summarizes the Company's commitments as of December 31, 2011, which primarily relate to the acquisition of aircraft and related spare engines, aircraft improvements and include other commitments primarily to acquire information technology services and assets (in millions):

 

     UAL      United      Continental  

2012

   $ 1,625       $ 167       $ 1,458   

2013

     1,091         79         1,012   

2014

     1,025         95         930   

2015

     1,772         373         1,399   

2016

     1,817         1,137         680   

After 2016

     5,697         5,697         —     
  

 

 

    

 

 

    

 

 

 
   $ 13,027       $ 7,548       $ 5,479   
  

 

 

    

 

 

    

 

 

 

United Aircraft Commitments

As of December 31, 2011, United had firm commitments to purchase 50 new aircraft (25 Boeing 787 aircraft and 25 Airbus A350XWB aircraft) scheduled for delivery from 2016 through 2019. United also has options to purchase 42 Airbus A319 and A320 aircraft, and purchase rights for 50 Boeing 787 aircraft and 50 Airbus A350XWB aircraft.

United has secured considerable backstop financing commitments from its aircraft and engine manufacturers, subject to certain customary conditions. However, United can provide no assurance that backstop financing, or any other financing not already in place, for aircraft and engine deliveries will be available to United on acceptable terms when necessary or at all.

Continental Aircraft Commitments

As of December 31, 2011, Continental had firm commitments to purchase 82 new aircraft (57 Boeing 737 aircraft and 25 Boeing 787 aircraft) scheduled for delivery from 2012 through 2016. Continental expects to place into service 19 Boeing 737 aircraft, of which two have been delivered prior to the filing of this report, and five Boeing 787 aircraft in 2012. Continental also has options to purchase 89 additional Boeing 737 and 787 aircraft.

Continental does not have backstop financing or any other financing currently in place for the Boeing aircraft on order. Financing will be necessary to satisfy Continental's capital commitments for its firm order aircraft and other related capital expenditures. Continental can provide no assurance that backstop financing, or any other financing not already in place, for aircraft and engine deliveries will be available to Continental on acceptable terms when necessary or at all.

The Company is currently in discussions with Boeing over potential compensation related to delays in the 787 aircraft deliveries. The Company is not able to estimate the ultimate success, amount of, nature or timing of any potential recoveries from Boeing over such delays.

 

Credit Card Processing Agreements

United and Continental have agreements with financial institutions that process customer credit card transactions for the sale of air travel and other services. Under certain of United's and Continental's credit card processing agreements, the financial institutions either require, or under certain circumstances have the right to require, that United and Continental maintain a reserve equal to a portion of advance ticket sales that have been processed by that financial institution, but for which United and Continental have not yet provided the air transportation.

As of December 31, 2011, United and Continental provided a reserve of $25 million, as required under their combined credit card processing agreement with JPMorgan Chase Bank, N.A. and Paymentech, LLC. Additional reserves may be required under this or other credit card processing agreements of United or Continental if the amount of unrestricted cash, cash equivalents, short-term investments and undrawn amounts under any revolving credit facilities held by United and Continental is less than $3.5 billion as of any calendar month-end measurement date. In addition, in certain circumstances, an increase in the future reserve requirements and the posting of a significant amount of cash collateral as provided by the terms of any or all of United's and Continental's material credit card processing agreements could materially reduce the Company's liquidity.

Guarantees and Off-Balance Sheet Financing

Fuel Consortia. The Company participates in numerous fuel consortia with other air carriers at major airports to reduce the costs of fuel distribution and storage. Interline agreements govern the rights and responsibilities of the consortia members and provide for the allocation of the overall costs to operate the consortia based on usage. The consortium (and in limited cases, the participating carriers) have entered into long-term agreements to lease certain airport fuel storage and distribution facilities that are typically financed through tax-exempt bonds (either special facilities lease revenue bonds or general airport revenue bonds), issued by various local municipalities. In general, each consortium lease agreement requires the consortium to make lease payments in amounts sufficient to pay the maturing principal and interest payments on the bonds. As of December 31, 2011, approximately $1.4 billion principal amount of such bonds were secured by significant fuel facility leases in which UAL participates, as to which UAL and each of the signatory airlines has provided indirect guarantees of the debt. As of December 31, 2011, UAL's contingent exposure was approximately $271 million principal amount of such bonds based on its recent consortia participation. As of December 31, 2011, United's and Continental's contingent exposure related to these bonds, based on its recent consortia participation, was approximately $214 million and $57 million, respectively. The Company's contingent exposure could increase if the participation of other air carriers decreases. The guarantees will expire when the tax-exempt bonds are paid in full, which ranges from 2011 to 2041. The Company did not record a liability at the time these indirect guarantees were made.

Guarantees. United has guaranteed interest and principal payments on $270 million of the Denver Bonds, which were originally issued in 1992, but were subsequently redeemed and reissued in 2007 and are due in 2032 unless United elects not to extend its equipment and ground lease in which case the bonds are due in 2023. The related lease obligation is accounted for as an operating lease with the associated expense recorded on a straight-line basis resulting in ratable accrual of the final $270 million lease obligation over the expected lease term through 2032, and is included in our lease commitments disclosed in Note 15. Continental has guaranteed approximately $1.6 billion in aggregate principal amount of tax-exempt special facilities revenue bonds and interest thereon, excluding the US Airways contingent liability described below.

Continental is contingently liable for US Airways' obligations under a lease agreement between US Airways and the Port Authority of New York and New Jersey related to the East End Terminal at LaGuardia (which lease agreement was assigned by US Airways to Delta Air Lines, Inc. ("Delta")). These obligations include the payment of ground rentals to the Port Authority and the payment of other rentals in respect of the full amounts owed on special facilities revenue bonds issued by the Port Authority having an outstanding par amount of $79 million at December 31, 2011, and a final scheduled maturity in 2015. If both US Airways and Delta default on these obligations, Continental would be obligated to cure the default and would have the right to occupy the terminal after US Airways' and Delta's interest in the lease had been terminated.

In the Company's financing transactions that include loans, the Company typically agrees to reimburse lenders for any reduced returns with respect to the loans due to any change in capital requirements and, in the case of loans in which the interest rate is based on the LIBOR for certain other increased costs that the lenders incur in carrying these loans as a result of any change in law, subject in most cases to certain mitigation obligations of the lenders. At December 31, 2011, UAL had $2.9 billion of floating rate debt (consisting of United's $2.1 billion and Continental's $820 million of debt) and $405 million of fixed rate debt (consisting of United's $205 million and Continental's $200 million of debt), with remaining terms of up to ten years, that are subject to these increased cost provisions. In several financing transactions involving loans or leases from non-U.S. entities, with remaining terms of up to ten years and an aggregate balance of $3.3 billion (consisting of United's $2.3 billion and Continental's $964 million balance), the Company bears the risk of any change in tax laws that would subject loan or lease payments thereunder to non-U.S. entities to withholding taxes, subject to customary exclusions.

Houston Bush Terminal B Redevelopment Project. In May 2011, UAL, in partnership with the Houston Airport System, announced that it would begin construction of the first phase of a three-phase $1 billion terminal improvement project for Terminal B at George Bush Intercontinental Airport ("Houston Bush") by the end of 2011. In November 2011, the City of Houston issued approximately $113 million of special facilities revenue bonds to finance the construction of a new south concourse at Houston Bush dedicated to the Company's regional jet operations. The bonds are guaranteed by Continental and are payable from certain rentals paid by Continental under a special facilities lease agreement with the City of Houston. UAL's initial commitment is to construct the first phase of the currently anticipated three-phase project. UAL's cost of construction of phase one of the project is currently estimated to be approximately $100 million and is funded by special facilities revenue bonds. Construction of the remaining phases of the project will be based on demand over the next 7 to 10 years, with phase one currently expected to be completed in late 2013.

Based on a qualitative assessment of the Houston Bush Terminal B Redevelopment Project due to the fact that Continental is guaranteeing the special facilities revenue bonds and the requirement that UAL or one of its subsidiaries fund cost overruns with no stated limits, the Company being considered the owner of the property during the construction period for accounting purposes. As a result, the construction project is being treated as a financing transaction such that the property and related financing will be included on UAL's consolidated balance sheet as an asset under operating property and equipment and an obligation under long-term liabilities.

Labor Negotiations. As of December 31, 2011, UAL and its subsidiaries had approximately 87,000 active employees, of whom approximately 72% are represented by various U.S. labor organizations. United and Continental had approximately 82% and 61%, respectively, of their active employees represented by various U.S. labor organizations. We are in the process of negotiating amended collective bargaining agreements with our employee groups.

Continental Airlines Inc [Member]
 
Commitments And Contingencies

NOTE 17—COMMITMENTS AND CONTINGENCIES

General Guarantees and Indemnifications. In the normal course of business, the Company enters into numerous real estate leasing and aircraft financing arrangements that have various guarantees included in the contracts. These guarantees are primarily in the form of indemnities under which the Company typically indemnifies the lessors and any tax/financing parties against tort liabilities that arise out of the use, occupancy, operation or maintenance of the leased premises or financed aircraft. Currently, the Company believes that any future payments required under these guarantees or indemnities would be immaterial, as most tort liabilities and related indemnities are covered by insurance (subject to deductibles). Additionally, certain leased premises such as fueling stations or storage facilities include indemnities of such parties for any environmental liability that may arise out of or relate to the use of the leased premises.

Legal and Environmental Contingencies. The Company has certain contingencies resulting from litigation and claims incident to the ordinary course of business. Management believes, after considering a number of factors, including (but not limited to) the information currently available, the views of legal counsel, the nature of contingencies to which the Company is subject and prior experience, that the ultimate disposition of these contingencies will not materially affect the Company's consolidated financial position or results of operations.

The Company records liabilities for legal and environmental claims when a loss is probable and reasonably estimable. These amounts are recorded based on the Company's assessments of the likelihood of their eventual disposition.

Commitments. The table below summarizes the Company's commitments as of December 31, 2011, which primarily relate to the acquisition of aircraft and related spare engines, aircraft improvements and include other commitments primarily to acquire information technology services and assets (in millions):

 

     UAL      United      Continental  

2012

   $ 1,625       $ 167       $ 1,458   

2013

     1,091         79         1,012   

2014

     1,025         95         930   

2015

     1,772         373         1,399   

2016

     1,817         1,137         680   

After 2016

     5,697         5,697         —     
  

 

 

    

 

 

    

 

 

 
   $ 13,027       $ 7,548       $ 5,479   
  

 

 

    

 

 

    

 

 

 

United Aircraft Commitments

As of December 31, 2011, United had firm commitments to purchase 50 new aircraft (25 Boeing 787 aircraft and 25 Airbus A350XWB aircraft) scheduled for delivery from 2016 through 2019. United also has options to purchase 42 Airbus A319 and A320 aircraft, and purchase rights for 50 Boeing 787 aircraft and 50 Airbus A350XWB aircraft.

United has secured considerable backstop financing commitments from its aircraft and engine manufacturers, subject to certain customary conditions. However, United can provide no assurance that backstop financing, or any other financing not already in place, for aircraft and engine deliveries will be available to United on acceptable terms when necessary or at all.

Continental Aircraft Commitments

As of December 31, 2011, Continental had firm commitments to purchase 82 new aircraft (57 Boeing 737 aircraft and 25 Boeing 787 aircraft) scheduled for delivery from 2012 through 2016. Continental expects to place into service 19 Boeing 737 aircraft, of which two have been delivered prior to the filing of this report, and five Boeing 787 aircraft in 2012. Continental also has options to purchase 89 additional Boeing 737 and 787 aircraft.

Continental does not have backstop financing or any other financing currently in place for the Boeing aircraft on order. Financing will be necessary to satisfy Continental's capital commitments for its firm order aircraft and other related capital expenditures. Continental can provide no assurance that backstop financing, or any other financing not already in place, for aircraft and engine deliveries will be available to Continental on acceptable terms when necessary or at all.

The Company is currently in discussions with Boeing over potential compensation related to delays in the 787 aircraft deliveries. The Company is not able to estimate the ultimate success, amount of, nature or timing of any potential recoveries from Boeing over such delays.

 

Credit Card Processing Agreements

United and Continental have agreements with financial institutions that process customer credit card transactions for the sale of air travel and other services. Under certain of United's and Continental's credit card processing agreements, the financial institutions either require, or under certain circumstances have the right to require, that United and Continental maintain a reserve equal to a portion of advance ticket sales that have been processed by that financial institution, but for which United and Continental have not yet provided the air transportation.

As of December 31, 2011, United and Continental provided a reserve of $25 million, as required under their combined credit card processing agreement with JPMorgan Chase Bank, N.A. and Paymentech, LLC. Additional reserves may be required under this or other credit card processing agreements of United or Continental if the amount of unrestricted cash, cash equivalents, short-term investments and undrawn amounts under any revolving credit facilities held by United and Continental is less than $3.5 billion as of any calendar month-end measurement date. In addition, in certain circumstances, an increase in the future reserve requirements and the posting of a significant amount of cash collateral as provided by the terms of any or all of United's and Continental's material credit card processing agreements could materially reduce the Company's liquidity.

Guarantees and Off-Balance Sheet Financing

Fuel Consortia. The Company participates in numerous fuel consortia with other air carriers at major airports to reduce the costs of fuel distribution and storage. Interline agreements govern the rights and responsibilities of the consortia members and provide for the allocation of the overall costs to operate the consortia based on usage. The consortium (and in limited cases, the participating carriers) have entered into long-term agreements to lease certain airport fuel storage and distribution facilities that are typically financed through tax-exempt bonds (either special facilities lease revenue bonds or general airport revenue bonds), issued by various local municipalities. In general, each consortium lease agreement requires the consortium to make lease payments in amounts sufficient to pay the maturing principal and interest payments on the bonds. As of December 31, 2011, approximately $1.4 billion principal amount of such bonds were secured by significant fuel facility leases in which UAL participates, as to which UAL and each of the signatory airlines has provided indirect guarantees of the debt. As of December 31, 2011, UAL's contingent exposure was approximately $271 million principal amount of such bonds based on its recent consortia participation. As of December 31, 2011, United's and Continental's contingent exposure related to these bonds, based on its recent consortia participation, was approximately $214 million and $57 million, respectively. The Company's contingent exposure could increase if the participation of other air carriers decreases. The guarantees will expire when the tax-exempt bonds are paid in full, which ranges from 2011 to 2041. The Company did not record a liability at the time these indirect guarantees were made.

Guarantees. United has guaranteed interest and principal payments on $270 million of the Denver Bonds, which were originally issued in 1992, but were subsequently redeemed and reissued in 2007 and are due in 2032 unless United elects not to extend its equipment and ground lease in which case the bonds are due in 2023. The related lease obligation is accounted for as an operating lease with the associated expense recorded on a straight-line basis resulting in ratable accrual of the final $270 million lease obligation over the expected lease term through 2032, and is included in our lease commitments disclosed in Note 15. Continental has guaranteed approximately $1.6 billion in aggregate principal amount of tax-exempt special facilities revenue bonds and interest thereon, excluding the US Airways contingent liability described below.

Continental is contingently liable for US Airways' obligations under a lease agreement between US Airways and the Port Authority of New York and New Jersey related to the East End Terminal at LaGuardia (which lease agreement was assigned by US Airways to Delta Air Lines, Inc. ("Delta")). These obligations include the payment of ground rentals to the Port Authority and the payment of other rentals in respect of the full amounts owed on special facilities revenue bonds issued by the Port Authority having an outstanding par amount of $79 million at December 31, 2011, and a final scheduled maturity in 2015. If both US Airways and Delta default on these obligations, Continental would be obligated to cure the default and would have the right to occupy the terminal after US Airways' and Delta's interest in the lease had been terminated.

In the Company's financing transactions that include loans, the Company typically agrees to reimburse lenders for any reduced returns with respect to the loans due to any change in capital requirements and, in the case of loans in which the interest rate is based on the LIBOR for certain other increased costs that the lenders incur in carrying these loans as a result of any change in law, subject in most cases to certain mitigation obligations of the lenders. At December 31, 2011, UAL had $2.9 billion of floating rate debt (consisting of United's $2.1 billion and Continental's $820 million of debt) and $405 million of fixed rate debt (consisting of United's $205 million and Continental's $200 million of debt), with remaining terms of up to ten years, that are subject to these increased cost provisions. In several financing transactions involving loans or leases from non-U.S. entities, with remaining terms of up to ten years and an aggregate balance of $3.3 billion (consisting of United's $2.3 billion and Continental's $964 million balance), the Company bears the risk of any change in tax laws that would subject loan or lease payments thereunder to non-U.S. entities to withholding taxes, subject to customary exclusions.

Houston Bush Terminal B Redevelopment Project. In May 2011, UAL, in partnership with the Houston Airport System, announced that it would begin construction of the first phase of a three-phase $1 billion terminal improvement project for Terminal B at George Bush Intercontinental Airport ("Houston Bush") by the end of 2011. In November 2011, the City of Houston issued approximately $113 million of special facilities revenue bonds to finance the construction of a new south concourse at Houston Bush dedicated to the Company's regional jet operations. The bonds are guaranteed by Continental and are payable from certain rentals paid by Continental under a special facilities lease agreement with the City of Houston. UAL's initial commitment is to construct the first phase of the currently anticipated three-phase project. UAL's cost of construction of phase one of the project is currently estimated to be approximately $100 million and is funded by special facilities revenue bonds. Construction of the remaining phases of the project will be based on demand over the next 7 to 10 years, with phase one currently expected to be completed in late 2013.

Based on a qualitative assessment of the Houston Bush Terminal B Redevelopment Project due to the fact that Continental is guaranteeing the special facilities revenue bonds and the requirement that UAL or one of its subsidiaries fund cost overruns with no stated limits, the Company being considered the owner of the property during the construction period for accounting purposes. As a result, the construction project is being treated as a financing transaction such that the property and related financing will be included on UAL's consolidated balance sheet as an asset under operating property and equipment and an obligation under long-term liabilities.

Labor Negotiations. As of December 31, 2011, UAL and its subsidiaries had approximately 87,000 active employees, of whom approximately 72% are represented by various U.S. labor organizations. United and Continental had approximately 82% and 61%, respectively, of their active employees represented by various U.S. labor organizations. We are in the process of negotiating amended collective bargaining agreements with our employee groups.