OTHER CONTINGENCIES AND COMMITMENTS
6 Months Ended
Jun. 30, 2019
Commitments and Contingencies Disclosure [Abstract]  
OTHER CONTINGENCIES AND COMMITMENTS WILDFIRE-RELATED CONTINGENCIES

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to wildfires. A provision for a loss contingency is recorded when it is both probable that a liability has been incurred and the amount of the liability can be reasonably estimated. PG&E Corporation and the Utility evaluate which potential liabilities are probable and the related range of reasonably estimated losses and record a charge that reflects their best estimate or the lower end of the range, if there is no better estimate. The assessment of whether a loss is probable or reasonably possible, and whether the loss or a range of losses is estimable, often involves a series of complex judgments about future events. Loss contingencies are reviewed quarterly and estimates are adjusted to reflect the impact of all known information, such as negotiations, discovery, settlements and payments, rulings, advice of legal counsel, and other information and events pertaining to a particular matter. PG&E Corporation’s and the Utility’s provision for loss and expense excludes anticipated legal costs, which are expensed as incurred. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows may be materially affected by the outcome of the following matters.

Wildfire-Related Claims

Wildfire-related claims on the Condensed Consolidated Financial Statements include amounts associated with the 2018 Camp fire, the 2017 Northern California wildfires, and the 2015 Butte fire.

At June 30, 2019 and December 31, 2018, the Utility’s Condensed Consolidated Balance Sheets include estimated liabilities in respect of total wildfire-related claims as follows:
 
Balance at
(in millions)
June 30, 2019
 
December 31, 2018
2015 Butte fire
$
212

 
$
226

2017 Northern California wildfires
5,500

 
3,500

2018 Camp fire
12,400

 
10,500

Total wildfire-related claims (1)
$
18,112

 
$
14,226

 
 
 
 
(1) On the Petition Date, all wildfire-related claims were classified as LSTC and all pending litigation was stayed. As of June 30, 2019, $100 million was reclassified from LSTC to current liabilities - wildfire-related claims to reflect Bankruptcy Court approval of contributions to the Wildfire Assistance Fund.

In addition, during the three and six months ended June 30, 2019, the Utility incurred legal and other costs of $19 million and $32 million, respectively, related to the 2018 Camp fire, with no corresponding costs in the same periods in 2018. During the three and six months ended June 30, 2019, the Utility incurred legal and other costs of $7 million and $41 million, respectively, related to the 2017 Northern California wildfires, as compared to $46 million and $68 million, respectively, in the same periods in 2018.

2018 Camp Fire Background

On November 8, 2018, a wildfire began near the city of Paradise, Butte County, California (the “2018 Camp fire”), which is located in the Utility’s service territory. Cal Fire’s Camp Fire Incident Information Website as of July 9, 2019 (the “Cal Fire website”) indicated that the 2018 Camp fire consumed 153,336 acres. On the Cal Fire website, Cal Fire reported 85 fatalities and the destruction of 13,972 residences, 528 commercial structures and 4,293 other buildings resulting from the 2018 Camp fire. There have been no subsequent updates of this information on the Cal Fire website.

On May 15, 2019, Cal Fire issued a news release announcing the results of its investigation into the cause of the 2018 Camp fire. According to the news release:

Cal Fire determined that the 2018 Camp fire was caused by electrical transmission lines owned and operated by the Utility near Pulga, California.

Cal Fire identified a second ignition site and stated that the second fire was consumed by the original fire which started earlier near Pulga, California. Cal Fire stated that the cause of the second fire was determined to be “vegetation into electrical distribution lines owned and operated by” the Utility.

Cal Fire indicated in its news release that its investigation report for the 2018 Camp fire has been forwarded to the Butte County District Attorney. (See “District Attorneys’ Offices’ Investigations” below for further information regarding the investigations of the 2018 Camp fire.) As of the date of this filing, this investigation report has not been released publicly.

PG&E Corporation and the Utility accept Cal Fire’s determination that the 2018 Camp fire ignited at the first ignition site. PG&E Corporation and the Utility have not been able to form a conclusion as to whether a second fire ignited as a result of vegetation contact with the Utility’s facilities.

PG&E Corporation and the Utility are continuing to review the evidence concerning the 2018 Camp fire. PG&E Corporation and the Utility have not yet had access to all of the evidence collected by Cal Fire as part of its investigation or to the investigation report prepared by Cal Fire.

Further, the CPUC’s SED is conducting investigations to assess the compliance of electric and communication companies’ facilities with applicable rules and regulations in areas impacted by the 2018 Camp fire. According to information made available by the CPUC, investigation topics include, but are not limited to, maintenance of facilities, vegetation management, and emergency preparedness and response. Various other entities may also be investigating the fire. It is uncertain when the investigations will be complete and whether the SED will release any preliminary findings before its investigations are complete.

2017 Northern California Wildfires Background

Beginning on October 8, 2017, multiple wildfires spread through Northern California, including Napa, Sonoma, Butte, Humboldt, Mendocino, Lake, Nevada, and Yuba Counties, as well as in the area surrounding Yuba City (the “2017 Northern California wildfires”). According to the Cal Fire California Statewide Fire Summary dated October 30, 2017, at the peak of the 2017 Northern California wildfires, there were 21 major fires that, in total, burned over 245,000 acres and destroyed an estimated 8,900 structures. The 2017 Northern California wildfires resulted in 44 fatalities.

Cal Fire has issued 19 investigation reports and two supplementary investigation reports that include its determination of the causes of 21 of the 2017 Northern California wildfires, and alleged that all of these fires, with the exception of the Tubbs fire, involved the Utility’s equipment.

During the second quarter of 2018, Cal Fire issued news releases announcing its determination on the causes of 16 of the 2017 Northern California wildfires (the La Porte, McCourtney, Lobo, Honey, Redwood, Sulphur, Cherokee, 37, Blue, Norrbom, Adobe, Partrick, Pythian, Nuns, Pocket and Atlas fires, located in Mendocino, Lake, Butte, Sonoma, Humboldt, Nevada and Napa counties). According to the Cal Fire news releases:

the La Porte, McCourtney, Lobo and Honey fires “were caused by trees coming into contact with power lines,” and

the Redwood, Sulphur, Cherokee, 37, Blue, Norrbom, Adobe, Partrick, Pythian, Nuns, Pocket and Atlas fires “were caused by electric power and distribution lines, conductors and the failure of power poles.”

Cal Fire stated in its news releases that the McCourtney, Lobo, Sulphur, Blue, Norrbom, Adobe, Partrick, Pythian, Pocket and Atlas fire investigations, and the investigation related to the Honey fire, have been referred to the appropriate county District Attorney’s offices for review “due to evidence of alleged violations of state law.” (See “District Attorneys’ Offices’ Investigations” below for further information regarding the investigations by the District Attorneys’ offices related to these fires.)

Also during the second quarter of 2018, Cal Fire released its investigation reports related to the Redwood, Cherokee, 37, Nuns and La Porte fires. Cal Fire did not refer these fires to District Attorney offices for investigation.

On October 9, 2018, Cal Fire issued a news release announcing the results of its investigation into the Cascade fire, located in Yuba County, concluding that the Cascade fire “was started by sagging power lines coming into contact during heavy winds” and that “the power line in question was owned by Pacific Gas and Electric Company.” On October 10, 2018, Cal Fire released its investigation report related to the Cascade fire. (See “District Attorneys’ Offices’ Investigations” below for further information regarding the investigations of the Cascade fire by the Office of the District Attorney of Yuba County.)

On January 24, 2019, Cal Fire issued a news release and its investigation report into the cause of the Tubbs fire. Cal Fire has determined that the Tubbs fire was caused by a private electrical system adjacent to a residential structure.

During the second quarter of 2019, Cal Fire released its investigation reports related to the Sulphur, Blue, Norrbom, Adobe, Partrick, Pythian, Pocket and Atlas fires. The Cal Fire investigation report for the Adobe fire included as Attachment 42.1 a “Supplementary Investigation Report” concerning the Pressley fire. The Cal Fire investigator concludes in the Supplementary Investigation Report that the Pressley fire was started by an ember cast from the Adobe fire.

On July 24, 2019, the CPUC released copies of Cal Fire’s investigation report related to the Point fire and supplementary investigation reports related to the Youngs fire, which Cal Fire had not previously released publicly, as attachments to the SED’s own investigative reports for those fires. (The Youngs fire is the fire that the Utility has previously referred to as the Maacama fire.) The Cal Fire investigation report for the Point fire alleges that the fire was caused by a tree limb that broke off in high winds and fell into a power line, causing the power line to contact the ground. The Cal Fire investigators in the Youngs supplementary reports conclude that the fire was caused by a tree that fell into a power line, severing the line.

Cal Fire has not yet released its investigation reports related to the McCourtney and Lobo fires because Cal Fire referred its investigations into these fires to local law enforcement and the information contained in its investigation reports related to these fires remains confidential.

As described in Note 11, on June 27, 2019, the CPUC issued an OII disclosing the findings of a June 13, 2019 report by the SED, which, among other things, alleges that the Utility committed 27 violations in connection with 12 of the 2017 Northern California wildfires (specifically, the Adobe, Atlas, Cascade, Norrbom, Nuns, Oakmont/Pythian, Partrick, Pocket, Point, Potter/Redwood, Sulphur and Youngs fires). As described in the OII, the 27 alleged violations include failure to maintain vegetation clearances, failure to identify and abate hazardous trees, improper record keeping, incomplete patrol prior to re-energizing a circuit, failure to retain evidence, failure to report an incident, and failure to maintain clearances between lines. No violations were identified by the SED in connection with the Cherokee, La Porte and Tubbs fires. The 37 fire was determined by the SED to not be a reportable incident. The SED report does not address the Lobo and McCourtney fires because Cal Fire referred its investigations into these fires to local law enforcement and the information contained in its investigation reports related to these fires remains confidential. On a status conference call before the assigned ALJ on July 29, 2019, the SED informed the parties that because the Nevada County District Attorney had decided not to pursue criminal charges in connection with the Lobo and McCourtney fires, the SED may add alleged violations related to those fires and the 2018 Camp fire to the OII. As required by the OII, on July 29, 2019, the Utility filed its initial response to the OII. In the initial response, the Utility indicated that it intends to fully cooperate with the CPUC but also stated that it disagreed with certain of the alleged violations set forth in the OII. The Utility also filed a Corrective Actions Report and an Application to Develop a Mobile Application and Supporting Systems, both as required by the OII. Also as required by the OII, on August 5, 2019, the Utility submitted a report to respond to the information requests contained in the OII, relating to matters such as the Utility’s vegetation management procedures and practices, its use of recloser devices in high fire risk areas, its pro-active de-energization of powerlines during times of high fire danger and its recordkeeping and other practices.

Further, the SED is conducting investigations into certain of the other 2017 Northern California wildfires, including the McCourtney and Lobo fires. Various other entities may also be investigating certain of the fires. It is uncertain when the investigations will be complete and whether the SED will release any preliminary findings before its investigations are complete.

Third-Party Claims, Investigations and Other Proceedings Related to the 2018 Camp Fire and 2017 Northern California Wildfires

If the Utility’s facilities, such as its electric distribution and transmission lines, are determined to be the substantial cause of one or more fires, and the doctrine of inverse condemnation applies, the Utility could be liable for property damage, business interruption, interest and attorneys’ fees without having been found negligent. California courts have imposed liability under the doctrine of inverse condemnation in legal actions brought by property holders against utilities on the grounds that losses borne by the person whose property was damaged through a public use undertaking should be spread across the community that benefited from such undertaking, and based on the assumption that utilities have the ability to recover these costs from their customers. Further, California courts have determined that the doctrine of inverse condemnation is applicable regardless of whether the CPUC ultimately allows recovery by the utility for any such costs. The CPUC may decide not to authorize cost recovery even if a court decision were to determine that the Utility is liable as a result of the application of the doctrine of inverse condemnation. (See “Loss Recoveries – Regulatory Recovery” below for further information regarding potential cost recovery related to the wildfires, including in connection with SB 901.)

In addition to claims for property damage, business interruption, interest and attorneys’ fees, the Utility could be liable for fire suppression costs, evacuation costs, medical expenses, personal injury damages, punitive damages and other damages under other theories of liability, including if the Utility were found to have been negligent.

Further, the Utility could be subject to material fines, penalties, or restitution orders if the CPUC or any law enforcement agency were to bring an enforcement action, including a criminal proceeding, and it were determined that the Utility had failed to comply with applicable laws and regulations.

As of January 28, 2019, before the automatic stay arising as a result of the filing of the Chapter 11 Cases, PG&E Corporation and the Utility were aware of approximately 100 complaints on behalf of at least 4,200 plaintiffs related to the 2018 Camp fire, nine of which sought to be certified as class actions. The pending civil litigation against PG&E Corporation and the Utility related to the 2018 Camp fire, which is currently stayed as a result of the commencement of the Chapter 11 Cases, included claims under multiple theories of liability, including inverse condemnation, trespass, private nuisance, public nuisance, negligence, negligence per se, negligent interference with prospective economic advantage, negligent infliction of emotional distress, premises liability, violations of the Public Utilities Code, violations of the Health & Safety Code, malice and false advertising in violation of the California Business and Professions Code. The plaintiffs principally asserted that PG&E Corporation’s and the Utility’s alleged failure to maintain and repair their distribution and transmission lines and failure to properly maintain the vegetation surrounding such lines were the causes of the 2018 Camp fire. The plaintiffs sought damages and remedies that include wrongful death, personal injury, property damage, evacuation costs, medical expenses, establishment of a class action medical monitoring fund, punitive damages, attorneys’ fees and other damages. PG&E Corporation’s and the Utility’s obligations with respect to such claims are expected to be determined through the Chapter 11 process.

As of January 28, 2019, before the automatic stay arising as a result of the filing of the Chapter 11 Cases, PG&E Corporation and the Utility were aware of approximately 750 complaints on behalf of at least 3,800 plaintiffs related to the 2017 Northern California wildfires, five of which sought to be certified as class actions. These cases were coordinated in the San Francisco County Superior Court. As of the Petition Date, the coordinated litigation was in the early stages of discovery. A trial with respect to the Atlas fire was scheduled to begin on September 23, 2019. The pending civil litigation against PG&E Corporation and the Utility related to the 2017 Northern California wildfires, included claims under multiple theories of liability, including inverse condemnation, trespass, private nuisance and negligence. This litigation, including the trial date with respect to the Atlas fire, currently is stayed as a result of the commencement of the Chapter 11 Cases. The plaintiffs principally asserted that PG&E Corporation’s and the Utility’s alleged failure to maintain and repair their distribution and transmission lines and failure to properly maintain the vegetation surrounding such lines were the causes of the 2017 Northern California wildfires. The plaintiffs sought damages that include wrongful death, personal injury, property damage, evacuation costs, medical expenses, punitive damages, attorneys’ fees and other damages. PG&E Corporation’s and the Utility’s obligations with respect to such claims are expected to be determined through the Chapter 11 process. However, the TCC has submitted a motion to the Bankruptcy Court seeking relief from the automatic stay to enable certain plaintiffs to pursue their claims outside of the Chapter 11 process, as further described under the heading “Motions to Lift the Automatic Stay for Certain Tubbs Fire-Related Claims” below. PG&E Corporation and the Utility have opposed such motions.

Insurance carriers who have made payments to their insureds for property damage arising out of the 2017 Northern California wildfires filed 52 subrogation complaints in the San Francisco County Superior Court and the Sonoma County Superior Court as of January 28, 2019. These complaints allege, among other things, negligence, inverse condemnation, trespass and nuisance. The allegations were similar to the ones made by individual plaintiffs. As of January 28, 2019, insurance carriers have filed 39 similar subrogation complaints with respect to the 2018 Camp fire in the Sacramento County Superior Court and the Butte County Superior Court. PG&E Corporation’s and the Utility’s obligations with respect to such claims are expected to be determined through the Chapter 11 process. However, certain holders of subrogation claims have submitted motions to the Bankruptcy Court seeking relief from the automatic stay in order to pursue their claims outside of the Chapter 11 process, as further described under the heading “Motions to Lift the Automatic Stay for Certain Tubbs Fire-Related Claims” below. PG&E Corporation and the Utility have opposed such motions.

Various government entities, including Yuba, Nevada, Lake, Mendocino, Napa and Sonoma Counties and the Cities of Santa Rosa and Clearlake, also asserted claims against PG&E Corporation and the Utility based on the damages that these government entities allegedly suffered as a result of the 2017 Northern California wildfires. Such alleged damages included, among other things, loss of natural resources, loss of public parks, property damages and fire suppression costs. The causes of action and allegations were similar to the ones made by individual plaintiffs and the insurance carriers. With respect to the 2018 Camp fire, Butte County has filed similar claims against PG&E Corporation and the Utility. As described below under the heading “Plan Support Agreements with Public Entities,” on June 18, 2019, PG&E Corporation and the Utility entered into agreements with certain government entities to potentially resolve their wildfire-related claims through the Chapter 11 process.

As described in Note 2, on July 1, 2019, the Bankruptcy Court entered an order approving the Bar Date of October 21, 2019, at 5:00 p.m. (Pacific Time) for filing claims against PG&E Corporation and the Utility relating to the period prior to the Petition Date, including claims in connection with the 2018 Camp fire and the 2017 Northern California wildfires. The Bar Date is subject to certain exceptions, including for claims arising under section 503(b)(9) of the Bankruptcy Code, the bar date for which occurred on April 22, 2019. It is expected that numerous wildfire-related claims will be filed against PG&E Corporation and the Utility in connection with the 2018 Camp fire and the 2017 Northern California wildfires through the Bar Date. On July 18, 2019, PG&E Corporation and the Utility filed a motion for entry of an order establishing procedures and schedules for the estimation of PG&E Corporation’s and the Utility’s aggregate liability for certain claims arising out of the 2018 Camp fire and the 2017 Northern California wildfires, as further described under the heading “Motion for the Establishment of Wildfire Claims Estimation Procedures” below.

PG&E Corporation and the Utility are continuing to review the evidence concerning the 2018 Camp fire and 2017 Northern California wildfires. PG&E Corporation and the Utility have not yet had access to all of the evidence collected by Cal Fire as part of its investigations or to the McCourtney and Lobo investigation reports prepared by Cal Fire. PG&E Corporation and the Utility and plaintiffs have reached an agreement to transfer available evidence collected by Cal Fire for the fires for which its investigation reports have been released to a shared storage facility. The transfer of the evidence is not yet complete. (See “District Attorneys’ Offices’ Investigations” below for information regarding certain investigations related to the 2018 Camp fire and 2017 Northern California wildfires.)

Regardless of any determinations of cause by Cal Fire with respect to any pre-petition fire, ultimately PG&E Corporation’s and the Utility’s liability will be resolved through the Chapter 11 process, regulatory proceedings and any potential enforcement proceedings, all of which could take a number of years to resolve. The timing and outcome of these and other potential proceedings are uncertain.

PG&E Corporation and the Utility, as part of their efforts to emerge from bankruptcy, are engaged in discussions with holders of claims related to the 2017 Northern California wildfires and the 2018 Camp fire in an attempt to reach a global settlement of such claims. As discussed under the heading “Plan Support Agreements with Public Entities,” PG&E Corporation and the Utility have entered into agreements with certain government entity claimholders to potentially resolve their wildfire-related claims. The most recent settlement offers made by PG&E Corporation and the Utility to subrogated insurance claimholders and individual claimholders as of the date of this filing are discussed in further detail below under the heading “2018 Camp Fire and 2017 Northern California Wildfires Accounting Charge.” PG&E Corporation and the Utility cannot predict the outcome or timing of discussions with other claimholders.  Even if discussions with claimholders were successful, the consummation of such a global settlement would likely be contingent on numerous uncertain conditions, including Bankruptcy Court approval and governmental action.

On March 16, 2018, PG&E Corporation and the Utility filed a demurrer to the inverse condemnation cause of action in the 2017 Northern California wildfires litigation. On May 21, 2018, the court overruled the motion. On July 20, 2018, PG&E Corporation and the Utility filed a writ in the Court of Appeal requesting appellate review of the trial court’s decision, which was denied on September 17, 2018. On September 27, 2018, PG&E Corporation and the Utility filed a petition for review to the California Supreme Court. On November 14, 2018, the California Supreme Court denied PG&E Corporation’s and the Utility’s petition for review.

Motions to Lift the Automatic Stay for Certain Tubbs Fire-Related Claims

On July 2, 2019, the TCC submitted a motion, pursuant to section 362(d)(1) of the Bankruptcy Code, for entry of an order terminating the automatic stay to permit certain individual plaintiffs (the “Tubbs Preference Plaintiffs”) to proceed to a jury trial on their claims against PG&E Corporation and the Utility arising from the Tubbs fire, and to request the San Francisco Superior Court in the coordinated litigation for the 2017 Northern California wildfires to order one or more of the cases of the Tubbs Preference Plaintiffs to trial with preference pursuant to California Code of Civil Procedure section 36. On July 9, 2019, the TCC submitted an amended motion to request relief from the stay with respect to additional individual plaintiffs to proceed to a jury trial on their claims against PG&E Corporation and the Utility arising from the Tubbs fire.

On July 3, 2019, the Ad Hoc Subrogation Group submitted a motion for relief from the automatic stay to permit certain of the Ad Hoc Subrogation Group’s members to pursue their claims against PG&E Corporation and the Utility regarding the issue of PG&E Corporation’s and the Utility’s liability for the Tubbs fire in the San Francisco Superior Court in the coordinated litigation for the 2017 Northern California wildfires.

On July 19, 2019, PG&E Corporation and the Utility filed an objection to the motions of the TCC and the Ad Hoc Subrogation Group, requesting that the motions be denied. Also on July 19, 2019, the UCC and the Shareholder Group filed objections to the motions of the TCC and the Ad Hoc Subrogation Group with the Bankruptcy Court, requesting that the motions be denied. The Shareholder Group also joined in PG&E Corporation’s and the Utility’s objection to the motions of the TCC and the Ad Hoc Subrogation Group.

On July 22, 2019, the Bankruptcy Court issued an order continuing the hearings on the TCC’s and the Ad Hoc Subrogation Group’s motions for relief from the automatic stay to August 14, 2019.

Motion for the Establishment of Wildfire Claims Estimation Procedures

On July 18, 2019, PG&E Corporation and the Utility submitted a motion, pursuant to sections 105(a) and 502(c) of the Bankruptcy Code, for entry of an order establishing procedures and schedules for the estimation of PG&E Corporation’s and the Utility’s aggregate liability for contingent and/or unliquidated claims arising out of the 2015 Butte fire, the 2017 Northern California wildfires and the 2018 Camp fire (which are collectively referred to in this paragraph as “wildfire claims”). In the motion, PG&E Corporation and the Utility proposed, among other things, the following general parameters of the estimation process:

First, the Bankruptcy Court would address the legal issue of whether, pursuant to the state law doctrine of inverse condemnation, PG&E Corporation and the Utility may be held strictly liable for wildfire claims asserting property damages even where PG&E Corporation or the Utility were not negligent.

Second, the Bankruptcy Court would schedule a hearing on the limited issue of causation of the Tubbs fire on October 7, 2019, or as soon as possible thereafter.

Third, following the Bar Date, the Bankruptcy Court would determine the aggregate value of the wildfire claims in a hearing proposed to be scheduled for early December 2019. This phase of the estimation process would involve the resolution of questions around the likelihood of success of the wildfire claims on issues such as negligence, the recoverability of certain categories of damages and the aggregate estimate of overall damages based upon sampling of claims and expert testimony. In the motion, PG&E Corporation and the Utility indicated that they are prepared to agree that, as part of the proposed estimation process, they will not contest causation with respect to any wildfire for which Cal Fire has concluded that PG&E Corporation and the Utility are responsible, including the 2018 Camp fire and the 2017 Northern California wildfires identified above, except the Tubbs fire.

The motion is expected to be heard by the Bankruptcy Court on August 14, 2019. On August 7, 2019, certain third parties filed joinders and statements in support with the Bankruptcy Court with respect to PG&E Corporation’s and the Utility’s motion, including the Ad Hoc Noteholder Committee, the UCC and the Shareholder Group. Also on August 7, 2019, certain third parties filed objections to PG&E Corporation’s and the Utility’s motion with the Bankruptcy Court, including the City and County of San Francisco, the Ad Hoc Subrogation Group and the TCC. The objection of the City and County of San Francisco is limited to PG&E Corporation’s and the Utility’s proposal for the Bankruptcy Court to address the legal issue of whether, under the doctrine of inverse condemnation, PG&E Corporation and the Utility may be held strictly liable for wildfire claims asserting property damages even where it was not negligent.

Plan Support Agreements with Public Entities

On June 18, 2019, PG&E Corporation and the Utility entered into PSAs with certain local public entities providing for an aggregate of $1.0 billion to be paid by PG&E Corporation and the Utility to such public entities pursuant to PG&E Corporation and the Utility’s Chapter 11 plan of reorganization in order to settle such public entities’ claims against PG&E Corporation and the Utility relating to the 2018 Camp fire, 2017 Northern California wildfires and 2015 Butte fire (collectively, “Public Entity Wildfire Claims”). PG&E Corporation and the Utility’s Chapter 11 plan of reorganization currently is under development and has not yet been filed with the Bankruptcy Court.  PG&E Corporation and the Utility have entered into a PSA with each of the following public entities or group of public entities, as applicable: 

the City of Clearlake, the City of Napa, the City of Santa Rosa, the County of Lake, the Lake County Sanitation District, the County of Mendocino, Napa County, the County of Nevada, the County of Sonoma, the Sonoma County Agricultural Preservation and Open Space District, the Sonoma County Community Development Commission, the Sonoma County Water Agency, the Sonoma Valley County Sanitation District and the County of Yuba (collectively, the “2017 Northern California Wildfire Public Entities”);

the Town of Paradise;

the County of Butte;

the Paradise Recreation & Park District;

the County of Yuba; and

the Calaveras County Water District. 

For purposes of each PSA, the local public entities that are party to such PSA are referred to herein as “Supporting Public Entities.”

Each PSA provides that PG&E Corporation and the Utility’s Chapter 11 plan of reorganization will include, among other things, the following elements: 

following the effective date of PG&E Corporation and the Utility’s Chapter 11 plan of reorganization, PG&E Corporation and the Utility will remit a Settlement Amount (as defined below) in the amount set forth below to the applicable Supporting Public Entities in full and final satisfaction and discharge of their Public Entity Wildfire Claims, and

subject to the Supporting Public Entities voting affirmatively to accept PG&E Corporation and the Utility’s Chapter 11 plan of reorganization, following the effective date of PG&E Corporation and the Utility’s Chapter 11 plan of reorganization, PG&E Corporation and the Utility will create and promptly fund $10.0 million to a segregated fund to be used by the Supporting Public Entities collectively in connection with the defense or resolution of claims against the Supporting Public Entities by third parties relating to the wildfires noted above (“Third Party Claims”). 

The “Settlement Amount” set forth in each PSA is as follows: 

for the 2017 Northern California Wildfire Public Entities, $415.0 million (which amount will be allocated among such entities),

for the Town of Paradise, $270.0 million,

for the County of Butte, $252.0 million,

for the Paradise Recreation & Park District, $47.5 million,

for the County of Yuba, $12.5 million, and

for the Calaveras County Water District, $3.0 million.

Each PSA provides that, subject to certain terms and conditions, the Supporting Public Entities will support PG&E Corporation and the Utility’s Chapter 11 plan of reorganization with respect to its treatment of their respective Public Entity Wildfire Claims, including by voting to accept PG&E Corporation and the Utility’s Chapter 11 plan of reorganization in the Chapter 11 Cases.

Each PSA may be terminated by the applicable Supporting Public Entities under certain circumstances, including:

if the Federal Emergency Management Agency or the OES fails to agree that no reimbursement is required from the Supporting Public Entities on account of assistance rendered by either agency in connection with the wildfires noted above, and

by any individual Supporting Public Entity, if a material amount of Third Party Claims is filed against such Supporting Public Entity and such Third Party Claims are not released pursuant to PG&E Corporation and the Utility’s Chapter 11 plan of reorganization. 

Each PSA may be terminated by PG&E Corporation and the Utility under certain circumstances, including if:

PG&E Corporation and the Utility do not obtain the consent, or the waiver of the lack of consent as a defense, of their insurance carriers for the policy years 2017 and 2018,

the Board of Directors of either PG&E Corporation or the Utility determines in good faith that continued performance under the PSA would be inconsistent with the exercise of its fiduciary duties, and

any Supporting Public Entity terminates a PSA, in which case PG&E Corporation and the Utility may terminate any other PSA.

Potential Losses in Connection with the 2018 Camp Fire and 2017 Northern California Wildfires

On May 8, 2019, the California Department of Insurance issued a news release announcing an update on property losses in connection with the 2018 wildfires in Southern California (which are not in the Utility’s service territory) and the 2018 Camp fire, indicating that “total claims over $12 billion as of April [2019]” in insured losses have been reported from the November 2018 fires, of which approximately $8.6 billion relates to statewide claims from the 2018 Camp fire. On September 6, 2018, the California Department of Insurance issued a news release announcing that insurers have received nearly 55,000 insurance claims totaling more than $12.28 billion in losses, of which approximately $10 billion relates to statewide claims from the 2017 Northern California wildfires.

The dollar amounts announced by the California Department of Insurance represent an aggregate amount of approximately $18.6 billion of insurance claims made as of the above dates related to the 2018 Camp fire and 2017 Northern California wildfires. PG&E Corporation and the Utility expect that additional claims have been submitted and will continue to be submitted to insurers, particularly with respect to the 2018 Camp fire. These claims reflect insured property losses only. The $18.6 billion of insurance claims made as of the above dates does not account for uninsured or underinsured property losses, interest, attorneys’ fees, fire suppression and clean-up costs, evacuation costs, personal injury or wrongful death damages, medical expenses or other costs, such as potential punitive damages, fines or penalties, or losses related to claims that have not manifested yet (“future claims”), each of which could be significant.

Potential liabilities related to the 2018 Camp fire and 2017 Northern California wildfires depend on various factors, including but not limited to the cause of each fire, contributing causes of the fires (including alternative potential origins, weather and climate related issues), the number, size and type of structures damaged or destroyed, the contents of such structures and other personal property damage, the number and types of trees damaged or destroyed, attorneys’ fees for claimants, the nature and extent of any personal injuries, including the loss of lives, the extent to which future claims arise, the amount of fire suppression and clean-up costs, other damages the Utility may be responsible for if found negligent, the amount of any penalties or fines that may be imposed by governmental entities, and the amount of any penalties, fines, or restitution orders that might result from any criminal charges brought.

There are a number of unknown facts and legal considerations that may impact the amount of any potential liability. Among other things, there is uncertainty at this time as to the number of wildfire-related claims that will be filed in the Chapter 11 Cases, the number of current and future claims that will be allowed by the Bankruptcy Court, how claims for punitive damages and claims by variously situated persons will be treated and whether such claims will be allowed, and the impact that historical settlement values for wildfire claims and other factors may have on the estimation of wildfire liability in the Chapter 11 Cases. If PG&E Corporation and the Utility were to be found liable for certain or all of the costs, expenses and other losses described above with respect to the 2018 Camp fire and 2017 Northern California wildfires, the amount of such liability could exceed $30 billion, which amount does not include potential punitive damages, fines and penalties or damages related to claims that have not manifested yet. This estimate is based on a wide variety of data and other information available to PG&E Corporation and the Utility and their advisors, including various precedents involving similar claims, and accounts for property losses (including insured, uninsured and underinsured property losses), interest, attorneys’ fees, fire suppression and clean-up costs, evacuation costs, personal injury or wrongful death damages, medical expenses and certain other costs. This estimate is not intended to provide an upper end of the range of potential liability arising from the 2018 Camp fire and 2017 Northern California wildfires. In certain circumstances, PG&E Corporation’s and the Utility’s liability could be substantially greater than such amount.

If PG&E Corporation and the Utility were to be found liable for any punitive damages, and such damages were allowed by the Bankruptcy Court, or if PG&E Corporation and the Utility were subject to fines or penalties, the amount of such punitive damages, fines and penalties could be significant. PG&E Corporation and the Utility have received significant fines and penalties in connection with past incidents. For example, in 2015, the CPUC approved a decision that imposed penalties on the Utility totaling $1.6 billion in connection with the natural gas explosion that occurred in the City of San Bruno, California on September 9, 2010 (the “San Bruno explosion”). These penalties represented nearly three times the underlying liability for the San Bruno explosion of approximately $558 million incurred for third-party claims, exclusive of shareholder derivative lawsuits and legal costs incurred. The amount of punitive damages, fines and penalties imposed on PG&E Corporation and the Utility could likewise be a significant amount in relation to the underlying liabilities with respect to the 2018 Camp fire and 2017 Northern California wildfires. PG&E Corporation’s and the Utility’s obligations with respect to such claims are expected to be determined through the Chapter 11 process. Regulatory proceedings are not subject to the automatic stay imposed as a result of the commencement of the Chapter 11 Cases; however, collection efforts in connection with fines or penalties arising out of such proceedings are stayed.

2018 Camp Fire and 2017 Northern California Wildfires Accounting Charge

Following accounting rules, PG&E Corporation and the Utility record a liability when a loss is probable and reasonably estimable. In accordance with U.S. generally accepted accounting principles, PG&E Corporation and the Utility evaluate which potential liabilities are probable and the related range of reasonably estimated losses, and record a charge that is the amount within the range that is a better estimate than any other amount or the lower end of the range, if there is no better estimate. The assessment of whether a loss is probable or reasonably possible, and whether the loss or a range of losses is estimable, often involves a series of complex judgments about future events. Loss contingencies are reviewed quarterly and estimates are adjusted to reflect the impact of all known information, such as negotiations, discovery, settlements and payments, rulings, advice of legal counsel, and other information and events pertaining to a particular matter.

2018 Camp Fire

In light of the current state of the law and the information currently available to the Utility, PG&E Corporation and the Utility have determined that it is probable they will incur a loss for claims in connection with the 2018 Camp fire. PG&E Corporation and the Utility recorded a charge in the amount of $10.5 billion for the year ended December 31, 2018. Based on additional facts and circumstances available to the Utility as of the date of this filing, including the entry into the PSAs and the status of PG&E Corporation’s and the Utility’s efforts to reach a resolution with other holders of wildfire-related claims, PG&E Corporation and the Utility recorded an additional charge for claims in connection with the 2018 Camp fire in the amount of $1.9 billion for the three months ended June 30, 2019.

The aggregate liability of $12.4 billion for claims in connection with the 2018 Camp fire corresponds to the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimated probable losses, and is subject to change based on additional information.

PG&E Corporation and the Utility currently believe that it is reasonably possible that the amount of the loss related to the 2018 Camp fire will be greater than the amount accrued, but are unable to reasonably estimate the additional loss and the upper end of the range because there are a number of unknown facts and legal considerations that may impact the amount of any potential liability, including the total scope and nature of claims that may be asserted against PG&E Corporation and the Utility. PG&E Corporation and the Utility intend to continue to review the available information and other information as it becomes available, including evidence in Cal Fire’s possession, evidence from or held by other parties, claims that have not yet been submitted, and additional information about the nature and extent of personal and business property damage and losses, the nature, number and severity of personal injuries, and information made available through the discovery process.

The process for estimating losses associated with claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including but not limited to factors identified above and estimates based on currently available information and prior experience with wildfires. As more information becomes available, management estimates and assumptions regarding the financial impact of the 2018 Camp fire may change, which could result in material increases to the loss accrued.

The $12.4 billion liability does not include any amounts for potential penalties or fines that may be imposed by governmental entities on PG&E Corporation or the Utility, or punitive damages, if any, or any losses related to future claims for damages that have not manifested yet, each of which could be significant. In addition, the charge does not include any amount in respect of FEMA reimbursement claims, claims for property damages related to federal land and other property or claims by certain state and local public entities that are not party to the PSAs, which amounts could be substantial. The charge also does not include any amounts for potential losses in connection with the wildfire-related securities class action litigation described below.

2017 Northern California Wildfires

In light of the current state of the law and the information currently available to the Utility, PG&E Corporation and the Utility have determined that it is probable they will incur a loss for claims in connection with all 21 of the 2017 Northern California wildfires identified above, the reasons for which are discussed in more detail in this section below. PG&E Corporation and the Utility recorded a charge in the amount of $2.5 billion during the quarter ended June 30, 2018 and a charge in the amount of $1.0 billion during the quarter ended December 31, 2018, for a total charge in the amount of $3.5 billion for the year ended December 31, 2018. Based on additional facts and circumstances available to the Utility as of the date of this filing, including additional information from Cal Fire, the entry into the PSAs and the status of PG&E Corporation’s and the Utility’s efforts to reach a resolution with other holders of wildfire-related claims, PG&E Corporation and the Utility recorded an additional charge for claims in connection with the 2017 Northern California wildfires in the amount of $2.0 billion for the three months ended June 30, 2019.

The aggregate liability of $5.5 billion for claims in connection with the 2017 Northern California wildfires corresponds to the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimated probable losses and is subject to change based on additional information.

In the case of the Tubbs and 37 fires, PG&E Corporation and the Utility continue to believe that if the claims related to these fires were litigated on the merits, it would not be probable that they would incur a loss for such claims. However, as a result of PG&E Corporation’s and the Utility’s most recent settlement offer to holders of claims related to the Tubbs and 37 fires as of the date of this filing, PG&E Corporation and the Utility have determined that it is probable they will incur a loss for claims in connection with such fires. With respect to 17 of the other 19 of the 2017 Northern California wildfires (the La Porte, McCourtney, Lobo, Honey, Redwood, Sulphur, Cherokee, Blue, Pocket, Atlas, Cascade, Point and Sonoma/Napa merged fires (which include the Nuns, Norrbom, Adobe, Partrick and Pythian fires)), PG&E Corporation and the Utility previously determined that it is probable they would incur a loss for claims in connection with such fires if such claims were litigated on the merits. With respect to 2 of the other 19 of the 2017 Northern California wildfires (the Youngs and Pressley fires), PG&E Corporation and the Utility have determined that it is probable they would incur a loss for claims in connection with such fires if such claims were litigated on the merits based on information that became available to PG&E Corporation and the Utility after the filing of their last Quarterly Report on Form 10-Q.

PG&E Corporation and the Utility currently believe that it is reasonably possible that the amount of the loss related to the 2017 Northern California wildfires will be greater than the amount accrued, but are unable to reasonably estimate the additional loss and the upper end of the range because there are a number of unknown facts and legal considerations that may impact the amount of any potential liability, including the total scope and nature of claims that may be asserted against PG&E Corporation and the Utility. PG&E Corporation and the Utility intend to continue to review the available information and other information as it becomes available, including evidence in Cal Fire’s possession, evidence from or held by other parties, claims that have not yet been submitted, and additional information about the nature and extent of personal and business property damage and losses, the nature, number and severity of personal injuries, and information made available through the discovery process.

The process for estimating losses associated with claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including but not limited to factors identified above and estimates based on currently available information and prior experience with wildfires. As more information becomes available, management estimates and assumptions regarding the financial impact of the 2017 Northern California wildfires may change, which could result in material increases to the loss accrued.

The $5.5 billion liability does not include any amounts for potential penalties or fines that may be imposed by governmental entities on PG&E Corporation or the Utility, or punitive damages, if any, or any losses related to future claims for damages that have not manifested yet, each of which could be significant. In addition, the charge does not include any amount in respect of FEMA reimbursement claims, claims for property damages related to federal land and other property or claims by certain state and local public entities that are not party to the PSAs, which amounts could be substantial. The charge also does not include any amounts for potential losses in connection with the wildfire-related securities class action litigation described below.

Additional Information Related to 2018 Camp Fire and 2017 Northern California Wildfires Accounting Charge

The aggregate liability of $17.9 billion for claims in connection with the 2018 Camp fire and the 2017 Northern California wildfires is comprised of (i) $8.5 billion for subrogated insurance claimholders, (ii) $7.5 billion for individual claimholders (including those with uninsured and underinsured property losses, among other claims), (iii) $1.0 billion for the Supporting Public Entities with respect to their Public Entity Wildfire Claims pursuant to the PSAs and (iv) $900 million for clean-up and fire suppression costs. The aggregate liabilities of $8.5 billion for subrogated insurance claimholders and $7.5 billion for individual claimholders are based on PG&E Corporation’s and the Utility’s estimates of probable loss developed from data and other information available to PG&E Corporation and the Utility and PG&E Corporation’s and the Utility’s most recent settlement offers to representatives of such claimholders as of the date of this filing. PG&E Corporation and the Utility cannot predict the outcome or timing of discussions with such claimholders. With respect to the $1.0 billion liability for claims held by the Supporting Public Entities, while PG&E Corporation and the Utility previously disclosed the existence of claims asserted by such entities, PG&E Corporation and the Utility had not previously taken a charge related to these claims as the amount of the liability could not be reasonably estimated. As described above, the aggregate liability of $17.9 billion for claims in connection with the 2018 Camp fire and the 2017 Northern California wildfires corresponds to the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimated probable losses and is subject to change based on additional information. (See “Potential Losses in Connection with the 2018 Camp Fire and 2017 Northern California Wildfires” above.)

As of the date of this filing, PG&E Corporation and the Utility believe that the settlement discussions with representatives of subrogated insurance claimholders are in a particularly critical period of the negotiation. PG&E Corporation and the Utility believe that the potential exists for material developments in the negotiation in the near term. Accordingly, if PG&E Corporation, the Utility and such claimholders reach agreement, PG&E Corporation’s and the Utility’s probable loss contingency for the subrogated insurance claims may increase by a material amount, which would result in an additional accrual above the $8.5 billion reflected in this filing. Any such increase could be substantial and could be taken in the third quarter of 2019. In their motion submitted to the Bankruptcy Court on July 23, 2019, the Ad Hoc Subrogation Group stated that holders of subrogated insurance claims hold in excess of $20 billion of wildfire-related claims against PG&E Corporation and the Utility. In the “Restructuring Term Sheet” attached to such motion, the Ad Hoc Subrogation Group proposed terms for a plan of reorganization that would settle all such subrogated insurance claims for consideration valued at $15.8 billion. PG&E Corporation and the Utility cannot predict the outcome or timing of discussions with such claimholders.

Loss Recoveries

PG&E Corporation and the Utility had insurance coverage for liabilities, including wildfire. Additionally, there are several mechanisms that allow for recovery of costs from customers. Potential for recovery is described below. Failure to obtain a substantial or full recovery of costs related to the 2018 Camp fire and 2017 Northern California wildfires or any conclusion that such recovery is no longer probable could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the inability to recover costs in in a timely manner could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

Insurance

PG&E Corporation and the Utility had $842 million of insurance coverage for liabilities, including wildfire events, for the period from August 1, 2017 through July 31, 2018, subject to an initial self-insured retention of $10 million per occurrence and further retentions of approximately $40 million per occurrence. During the third quarter of 2018, PG&E Corporation and the Utility renewed their liability insurance coverage for wildfire events in an aggregate amount of approximately $1.4 billion for the period from August 1, 2018 through July 31, 2019, comprised of $700 million for general liability (subject to an initial self-insured retention of $10 million per occurrence), and $700 million for property damages only, which property damage coverage includes an aggregate amount of approximately $200 million through the reinsurance market where a catastrophe bond was utilized.

PG&E Corporation and the Utility record a receivable for insurance recoveries when it is deemed probable that recovery of a recorded loss will occur. Through June 30, 2019, PG&E Corporation and the Utility recorded $1.38 billion for probable insurance recoveries in connection with the 2018 Camp fire and $842 million for probable insurance recoveries in connection with the 2017 Northern California wildfires. These amounts reflect an assumption that the cause of each fire is deemed to be a separate occurrence under the insurance policies. The amount of the receivable is subject to change based on additional information. PG&E Corporation and the Utility intend to seek full recovery for all insured losses and believe it is reasonably possible that they will record a receivable for the full amount of the insurance limits in the future.

If PG&E Corporation and the Utility are unable to recover the full amount of their insurance, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected. Even if PG&E Corporation and the Utility were to recover the full amount of their insurance, PG&E Corporation and the Utility expect their losses in connection with the 2018 Camp fire and 2017 Northern California wildfires will substantially exceed their available insurance.

The following table presents changes in the insurance receivable for the six months ended June 30, 2019. The balance for insurance receivable is included in Other accounts receivable in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets:
(in millions)
Insurance Receivable
2018 Camp fire
 
Balance at December 31, 2018
$
1,380

Accrued insurance recoveries

Reimbursements

Balance at June 30, 2019
$
1,380

 
 
2017 Northern California wildfires
 
Balance at December 31, 2018
$
829

Accrued insurance recoveries

Reimbursements

Balance at June 30, 2019
$
829



Regulatory Recovery

On June 21, 2018, the CPUC issued a decision granting the Utility’s request to establish a WEMA to track specific incremental wildfire liability costs effective as of July 26, 2017. The decision does not grant the Utility rate recovery of any wildfire-related costs. Any such rate recovery would require CPUC authorization in a separate proceeding. The Utility may be unable to fully recover costs in excess of insurance, if at all. Rate recovery is uncertain, therefore the Utility has not recorded a regulatory asset related to any wildfire claims costs. Even if such recovery is possible, it could take a number of years to resolve and a number of years to collect.

In addition, SB 901, signed into law on September 21, 2018, requires the CPUC to establish a customer harm threshold, directing the CPUC to limit certain disallowances in the aggregate, so that they do not exceed the maximum amount that the Utility can pay without harming ratepayers or materially impacting its ability to provide adequate and safe service (the “Customer Harm Threshold”). SB 901 also authorizes the CPUC to issue a financing order that permits recovery, through the issuance of recovery bonds (also referred to as “securitization”), of wildfire-related costs found to be just and reasonable by the CPUC and, only for the 2017 Northern California wildfires, any amounts in excess of the Customer Harm Threshold. SB 901 does not authorize securitization with respect to possible 2018 Camp fire costs.

On January 10, 2019, the CPUC adopted an OIR, which establishes a process to develop criteria and a methodology to inform determinations of the Customer Harm Threshold in future applications under Section 451.2(a) of the Public Utilities Code for recovery of costs related to the 2017 Northern California wildfires.

On March 29, 2019, the Assigned Commissioner issued a scoping memo, which confirmed that the CPUC in this proceeding would establish a Customer Harm Threshold methodology applicable only to 2017 fires, to be invoked in connection with a future application for cost recovery, and would not determine a specific financial outcome in this proceeding.

On July 8, 2019, the CPUC issued a decision in the Customer Harm Threshold proceeding. The CPUC decision provides that “[a]n electrical corporation that has filed for relief under chapter 11 of the Bankruptcy Code may not access the Stress Test to recover costs in an application under Section 451.2(b), because the Commission cannot determine the corporation’s ‘financial status,’ which includes, among other considerations, its capital structure, liquidity needs, and liabilities, as required by Section 451.2(b).” This determination effectively bars PG&E Corporation and the Utility from access to relief under the Customer Harm Threshold during the pendency of the Chapter 11 Cases. On August 7, 2019, the Utility submitted to the CPUC an application for rehearing of the decision. The Utility indicated in its application, among other things, that the CPUC’s decision “is contrary to law because it bars a utility that has filed for Chapter 11 from accessing the CHT [Customer Harm Threshold], requires a utility to file a cost recovery application before the CHT [Customer Harm Threshold] will be determined, and erects ratepayer protection mechanisms as an extra-statutory hurdle for accessing the CHT [Customer Harm Threshold].” The Utility also argued that the CPUC should apply the Customer Harm Threshold methodology to costs related to the 2018 Camp fire.

The decision otherwise adopts a methodology to determine the Customer Harm Threshold based on (1) the maximum additional debt that a utility can take on and maintain a minimum investment grade credit rating; (2) excess cash available to the utility; (3) a potential maximum regulatory adjustment of either 20% of the Customer Harm Threshold or 5% of the total disallowed wildfire liabilities, whichever is greater; and (4) an adjustment to preserve for ratepayers any tax benefits associated with the Customer Harm Threshold. The decision also requires a utility to include proposed ratepayer protection measures to mitigate harm to ratepayers as part of an application under Section 451.2(b).

Failure to obtain a substantial or full recovery of costs related to wildfires could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows.

Wildfire-Related Derivative Litigation

Two purported derivative lawsuits alleging claims for breach of fiduciary duties and unjust enrichment were filed in the San Francisco County Superior Court on November 16, 2017 and November 20, 2017, respectively, naming as defendants current and certain former members of the Board of Directors and certain current and former officers of PG&E Corporation and the Utility. PG&E Corporation and the Utility are named as nominal defendants. These lawsuits were consolidated by the court on February 14, 2018, and are denominated In Re California North Bay Fire Derivative Litigation. On April 13, 2018, the plaintiffs filed a consolidated complaint. After the parties reached an agreement regarding a stay of the derivative proceeding pending resolution of the tort actions described above and any regulatory proceeding relating to the 2017 Northern California wildfires, on April 24, 2018, the court entered a stipulation and order to stay. The stay is subject to certain conditions regarding the plaintiffs’ access to discovery in other actions. On January 28, 2019, the plaintiffs filed a request to lift the stay for the purposes of amending their complaint to add allegations regarding the 2018 Camp fire.

On August 3, 2018, a third purported derivative lawsuit, entitled Oklahoma Firefighters Pension and Retirement System v. Chew, et al., was filed in the U.S. District Court for the Northern District of California, naming as defendants certain current and former members of the Board of Directors and certain current and former officers of PG&E Corporation and the Utility. PG&E Corporation is named as a nominal defendant. The lawsuit alleges claims for breach of fiduciary duties and unjust enrichment as well as a claim under Section 14(a) of the federal Securities Exchange Act of 1934 alleging that PG&E Corporation’s and the Utility’s 2017 proxy statement contained misrepresentations regarding the companies’ risk management and safety programs. On October 15, 2018, PG&E Corporation filed a motion to stay the litigation. Prior to the scheduled hearing on this motion, this matter was automatically stayed by PG&E Corporation’s and the Utility’s commencement of bankruptcy proceedings, as discussed below.

On October 23, 2018, a fourth purported derivative lawsuit, entitled City of Warren Police and Fire Retirement System v. Chew, et al., was filed in San Francisco County Superior Court, alleging claims for breach of fiduciary duty, corporate waste and unjust enrichment. It names as defendants certain current and former members of the Board of Directors and certain current and former officers of PG&E Corporation, and names PG&E Corporation as a nominal defendant. Plaintiff filed a request with the court seeking the voluntary dismissal of this matter without prejudice on January 18, 2019.

On November 21, 2018, a fifth purported derivative lawsuit, entitled Williams v. Earley, Jr., et al., was filed in federal court in San Francisco, alleging claims identical to those alleged in the Oklahoma Firefighters Pension and Retirement System v. Chew, et al. lawsuit listed above against certain current and former officers and directors, and naming PG&E Corporation and the Utility as nominal defendants. This lawsuit includes allegations related to the 2017 Northern California wildfires and the 2018 Camp fire. This action was stayed by stipulation of the parties and order of the court on December 21, 2018, subject to resolution of the pending securities class action.

On December 24, 2018, a sixth purported derivative lawsuit, entitled Bowlinger v. Chew, et al., was filed in San Francisco Superior Court, alleging claims for breach of fiduciary duty, abuse of control, corporate waste, and unjust enrichment in connection with the 2018 Camp fire against certain current and former officers and directors, and naming PG&E Corporation and the Utility as nominal defendants. The court has scheduled a case management conference for December 13, 2019.

On January 25, 2019, a seventh purported derivative lawsuit, entitled Hagberg v. Chew, et al., was filed in San Francisco Superior Court, alleging claims for breach of fiduciary duty, abuse of control, corporate waste, and unjust enrichment in connection with the 2018 Camp fire against certain current and former officers and directors, and naming PG&E Corporation and the Utility as nominal defendants.

On January 28, 2019, an eighth purported derivative lawsuit, entitled Blackburn v. Meserve, et al., was filed in federal court alleging claims for breach of fiduciary duty, unjust enrichment, and waste of corporate assets in connection with the 2017 Northern California wildfires and the 2018 Camp fire against certain current and former officers and directors, and naming PG&E Corporation as a nominal defendant.

Due to the commencement of the Chapter 11 Cases, PG&E Corporation and the Utility filed notices in each of these proceedings on February 1, 2019, reflecting that the proceedings are automatically stayed pursuant to Section 362(a) of the Bankruptcy Code. On February 5, 2019, the plaintiff in Bowlinger v. Chew, et al. filed a response to the notice asserting that the automatic stay did not apply to his claims. PG&E Corporation and the Utility accordingly filed a Motion to Enforce the Automatic Stay with the Bankruptcy Court as to the Bowlinger action, which was granted.

Wildfire-Related Securities Class Action Litigation

In June 2018, two purported securities class actions were filed in the United States District Court for the Northern District of California, naming PG&E Corporation and certain of its current and former officers as defendants, entitled David C. Weston v. PG&E Corporation, et al. and Jon Paul Moretti v. PG&E Corporation, et al., respectively.  The complaints alleged material misrepresentations and omissions related to, among other things, vegetation management and transmission line safety in various PG&E Corporation public disclosures. The complaints asserted claims under Section 10(b) and Section 20(a) of the federal Securities Exchange Act of 1934 and Rule 10b-5 promulgated thereunder, and sought unspecified monetary relief, interest, attorneys’ fees and other costs. Both complaints identified a proposed class period of April 29, 2015 to June 8, 2018. On September 10, 2018, the court consolidated both cases and the litigation is now denominated In re PG&E Corporation Securities Litigation. The court also appointed the Public Employees Retirement Association of New Mexico as lead plaintiff. The plaintiff filed a consolidated amended complaint on November 9, 2018. After the plaintiff requested leave to amend their complaint to add allegations regarding the 2018 Camp fire, the plaintiff filed a second amended consolidated complaint on December 14, 2018.

Due to the commencement of the Chapter 11 Cases, PG&E Corporation and the Utility filed a notice on February 1, 2019, reflecting that the proceedings are automatically stayed pursuant to Section 362(a) of the Bankruptcy Code. On February 15, 2019, PG&E Corporation and the Utility filed a complaint in Bankruptcy Court against the plaintiff seeking preliminary and permanent injunctive relief to extend the stay to the claims alleged against the individual officer defendants.

On February 22, 2019, a purported securities class action was filed in the United States District Court for the Northern District of California, entitled York County on behalf of the York County Retirement Fund, et al. v. Rambo, et al. (the “York County Action”). The complaint names as defendants certain current and former officers and directors, as well as the underwriters of four public offerings of notes from 2016 to 2018. Neither PG&E Corporation nor the Utility is named as a defendant. The complaint alleges material misrepresentations and omissions in connection with the note offerings related to, among other things, PG&E Corporation’s and the Utility’s vegetation management and wildfire safety measures. The complaint asserts claims under Section 11 and Section 15 of the federal Securities Act of 1933, and seeks unspecified monetary relief, attorneys’ fees and other costs, and injunctive relief. On May 7, 2019, the York County Action was consolidated with In re PG&E Corporation Securities Litigation.

On May 28, 2019, the plaintiffs in the consolidated securities actions filed a third amended consolidated class action complaint, which includes the claims asserted in the previously-filed actions and names as defendants PG&E Corporation, the Utility, certain current and former officers and directors, and the underwriters. The action remains stayed as to PG&E Corporation and the Utility, and PG&E Corporation and the Utility are currently seeking an order from the Bankruptcy Court to extend the stay to the officer, director, and underwriter defendants.

District Attorneys’ Offices’ Investigations

During the second quarter of 2018, Cal Fire issued news releases stating that it referred the investigations related to the McCourtney, Lobo, Honey, Sulphur, Blue, Norrbom, Adobe, Partrick, Pythian, Pocket and Atlas fires to the appropriate county District Attorney’s offices for review “due to evidence of alleged violations of state law.” On March 12, 2019, the Sonoma, Napa, Humboldt and Lake County District Attorneys announced that they would not prosecute PG&E Corporation or the Utility for the fires in those counties, which include the Sulphur, Blue, Norrbom, Adobe, Partrick, Pythian, Pocket and Atlas fires.

PG&E Corporation and the Utility were the subject of criminal investigations or other actions by the Nevada County District Attorney’s Office to whom Cal Fire had referred its investigations into the McCourtney and Lobo fires. On July 23, 2019, the Nevada County District Attorney informed PG&E Corporation and the Utility of his decision not to pursue criminal charges in connection with the McCourtney and Lobo fires.

The Honey fire was referred to the Butte County District Attorney’s Office, and in October 2018, the Utility reached an agreement to settle any civil claims or criminal charges that could have been brought by the Butte County District Attorney in connection with the Honey fire, as well as the La Porte and Cherokee fires (which were not referred). The settlement provides for funding by the Utility for at least four years of an enhanced fire prevention and communication program, in the amount of up to $1.5 million, not recoverable in rates.

On October 9, 2018, the Office of the District Attorney of Yuba County announced its decision not to pursue criminal charges at such time against PG&E Corporation or the Utility pertaining to the Cascade fire. The District Attorney’s Office also indicated that it reserved the right “to review any additional information or evidence that may be submitted to it prior to the expiration of the criminal statute of limitations.”

In addition, the Butte County District Attorney’s Office and the California Attorney General’s Office have opened a criminal investigation of the 2018 Camp fire. PG&E Corporation and the Utility have been informed by the Butte County District Attorney’s Office and the California Attorney General’s Office that a grand jury has been empaneled in Butte County, and the Utility was served with subpoenas in the grand jury investigation. The Utility has produced documents and continues to produce documents and respond to other requests for information in connection with the criminal investigation of the 2018 Camp fire, including, but not limited to, documents related to the operation and maintenance of equipment owned or operated by the Utility. The Utility has also cooperated with the Butte County District Attorney’s Office and the California Attorney General’s Office in the collection of physical evidence from equipment owned or operated by the Utility. PG&E Corporation and the Utility are unable to predict the outcome of the criminal investigation into the 2018 Camp fire. The Utility could be subject to material fines, penalties, or restitution if it is determined that the Utility failed to comply with applicable laws and regulations, as well as non-monetary remedies such as oversight requirements. The criminal investigation is not subject to the automatic stay imposed as a result of the commencement of the Chapter 11 Cases.

Additional investigations and other actions may arise out of the other 2017 Northern California wildfires and the 2018 Camp fire. The timing and outcome for resolution of the remaining referrals by Cal Fire to the appropriate county District Attorneys’ offices are uncertain.

SEC Investigation

On March 20, 2019, PG&E Corporation learned that the SEC’s San Francisco Regional Office is conducting an investigation related to PG&E Corporation’s and the Utility’s public disclosures and accounting for losses associated with the 2018 Camp fire, the 2017 Northern California wildfires and the 2015 Butte fire. PG&E Corporation and the Utility are unable to predict the timing and outcome of the investigation.

Clean-up and Repair Costs

The Utility incurred costs of $655 million for clean-up and repair of the Utility’s facilities (including $236 million in capital expenditures) through June 30, 2019, in connection with the 2018 Camp fire. The Utility also incurred costs of $334 million for clean-up and repair of the Utility’s facilities (including $161 million in capital expenditures) through June 30, 2019, in connection with the 2017 Northern California wildfires. The Utility is authorized to track and seek recovery of clean-up and repair costs through CEMA. (CEMA requests are subject to CPUC approval.) The Utility capitalizes and records as regulatory assets costs that are probable of recovery. At June 30, 2019, the CEMA regulatory asset balances related to the 2018 Camp fire and 2017 Northern California wildfires were zero and $88 million, respectively, and are included in long-term regulatory assets on the Condensed Consolidated Balance Sheets. Additionally, the capital expenditures for clean-up and repair are included in property, plant and equipment at June 30, 2019.

Should PG&E Corporation and the Utility conclude that recovery of any clean-up and repair costs included in the CEMA is no longer probable, PG&E Corporation and the Utility will record a charge in the period such conclusion is reached. Failure to obtain a substantial or full recovery of these costs could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

Wildfire Assistance Fund

On May 24, 2019, the Bankruptcy Court entered an order authorizing PG&E Corporation and the Utility to establish and fund a program (the “Wildfire Assistance Fund”) to assist those displaced by the 2018 Camp fire and 2017 Northern California wildfires with the costs of substitute or temporary housing (“Alternative Living Expenses”) and other urgent needs. The Wildfire Assistance Fund is intended to aid certain wildfire claimants who are either uninsured or still in need of assistance for Alternative Living Expenses or have other urgent needs. The Wildfire Assistance Fund will consist of $105 million deposited into a segregated account to be controlled by an independent third-party administrator appointed by the Bankruptcy Court, who will disburse and administer the funds. The administrator will be responsible for developing the specific eligibility requirements and application procedures for the distribution of the Wildfire Assistance Fund to eligible claimants. Up to $5 million of the Wildfire Assistance Fund may be used to pay the costs of administering the fund. The establishment of the Wildfire Assistance Fund is not an acknowledgment or admission by PG&E Corporation or the Utility of liability with respect to the 2018 Camp fire or 2017 Northern California wildfires.

The Utility fully funded $105 million into the Wildfire Assistance Fund on August 2, 2019.

2015 Butte Fire

In September 2015, a wildfire (the “2015 Butte fire”) ignited and spread in Amador and Calaveras Counties in Northern California. On April 28, 2016, Cal Fire released its report of the investigation of the origin and cause of the 2015 Butte fire. According to Cal Fire’s report, the 2015 Butte fire burned 70,868 acres, resulted in two fatalities, destroyed 549 homes, 368 outbuildings and four commercial properties, and damaged 44 structures.  Cal Fire’s report concluded that the 2015 Butte fire was caused when a gray pine tree contacted the Utility’s electric line, which ignited portions of the tree, and determined that the failure by the Utility and/or its vegetation management contractors, ACRT Inc. and Trees, Inc., to identify certain potential hazards during its vegetation management program ultimately led to the failure of the tree.

Third-Party Claims

On May 23, 2016, individual plaintiffs filed a master complaint against the Utility and its two vegetation management contractors in the Superior Court of California, County of Sacramento.  Subrogation insurers also filed a separate master complaint on the same date.  The California Judicial Council previously had authorized the coordination of all cases in Sacramento County.  As of January 28, 2019, 95 known complaints were filed against the Utility and its two vegetation management contractors in the Superior Court of California in the Counties of Calaveras, San Francisco, Sacramento, and Amador.  The complaints involve approximately 3,900 individual plaintiffs representing approximately 2,000 households and their insurance companies.  These complaints were part of, or were in the process of being added to, the coordinated proceeding.  Plaintiffs sought to recover damages and other costs, principally based on the doctrine of inverse condemnation and negligence theory of liability.  Plaintiffs also sought punitive damages.  Several plaintiffs dismissed the Utility’s two vegetation management contractors from their complaints. The Utility does not expect the number of claimants to increase significantly in the future, because the statute of limitations for property damage and personal injury in connection with the 2015 Butte fire has expired. Further, due to the commencement of the Chapter 11 Cases, these plaintiffs have been stayed from continuing to prosecute pending litigation and from commencing new lawsuits against PG&E Corporation or the Utility on account of pre-petition obligations. On January 30, 2019, the Court in the coordinated proceeding issued an order staying the action.

On April 28, 2017, the Utility moved for summary adjudication on plaintiffs’ claims for punitive damages.  The court denied the Utility’s motion and the Utility filed a writ with the Court of Appeal of the State of California, Third Appellate District. The writ was granted on July 2, 2018, directing the trial court to enter summary adjudication in favor of the Utility and to deny plaintiffs’ claim for punitive damages under California Civil Code Section 3294. Plaintiffs sought rehearing and asked the California Supreme Court to review the Court of Appeal’s decision. Both requests were denied. Neither the trial nor appellate courts originally addressed whether plaintiffs can seek punitive damages at trial under Public Utilities Code Section 2106. However, the trial court, in November 2018, denied a motion filed by the Utility that would have confirmed that punitive damages under Public Utilities Code Section 2106 are unavailable. The Utility believes a loss related to punitive damages is unlikely, but possible.

On June 22, 2017, the Superior Court of California, County of Sacramento ruled on a motion of several plaintiffs and found that the doctrine of inverse condemnation applied to the Utility with respect to the 2015 Butte fire. The court held, among other things, that the Utility had failed to put forth any evidence to support its contention that the CPUC would not allow the Utility to pass on its inverse condemnation liability through rate increases. While the ruling was binding only between the Utility and the plaintiffs in the coordination proceeding at the time of the ruling, others could make similar claims. On January 4, 2018, the Utility filed with the court a renewed motion for a legal determination of inverse condemnation liability, citing the November 30, 2017 CPUC decision denying the San Diego Gas & Electric Company application to recover wildfire costs in excess of insurance, and the CPUC declaration that it will not automatically allow utilities to spread inverse condemnation losses through rate increases.

On May 1, 2018, the Superior Court of California, County of Sacramento issued its ruling on the Utility’s renewed motion in which the court affirmed, with minor changes, its tentative ruling dated April 25, 2018. The court determined that it was bound by earlier holdings of two appellate courts decisions, Barham and Pacific Bell. Further, the court stated that the Utility’s constitutional arguments should be made to the appellate courts and suggested that, to the extent the Utility raised the public policy implications of the November 30, 2017 CPUC decision in the San Diego Gas & Electric Company cost recovery proceeding, these arguments should be addressed to the Legislature or CPUC. The Utility filed a writ with the Court of Appeal seeking immediate review of the court’s decision. On June 18, 2018, after the writ was summarily denied, the Utility filed a Petition for Review with the California Supreme Court, which also was denied. On September 6, 2018, the court set a trial for some individual plaintiffs to begin on April 1, 2019. The Utility reached agreement with two plaintiffs in the litigation to stipulate to judgment against the Utility on inverse condemnation grounds. The court granted the Utility’s stipulated judgment motion on November 29, 2018 and the Utility filed its appeal on December 11, 2018. As a result of the filing of the Chapter 11 Cases, these lawsuits, including the trial and the appeal from the stipulated judgment, are stayed.

In addition to the coordinated plaintiffs, Cal Fire, the OES, the County of Calaveras, the Calaveras County Water District, and four smaller public entities (three fire districts and the California Department of Veterans Affairs) brought suit or indicated that they intended to do so. The Calaveras County Water District and the four smaller public entities filed their complaints in August 2018 and September 2018. They were added to the coordinated proceedings. The Utility settled the claims of the three fire protection districts and the Calaveras County Water District.

On April 13, 2017, Cal Fire filed a complaint with the Superior Court of California, County of Calaveras, seeking to recover over $87 million for its costs incurred on the theory that the Utility and its vegetation management contractors were negligent, or violated the law, among other claims.  On July 31, 2017, Cal Fire dismissed its complaint against Trees, Inc., one of the Utility’s vegetation contractors. Cal Fire had requested that a trial of its claims be set in 2019, following any trial of the claims of the individual plaintiffs. On October 19, 2018, the Utility filed a motion for summary judgment arguing that Cal Fire cannot recover any fire suppression costs under the Third District Court of Appeal’s decision in Dep’t of Forestry & Fire Prot. v. Howell (2017) 18 Cal. App. 5th 154. The hearing on that motion was set for January 31, 2019, but the hearing and Cal Fire’s case against the Utility are now stayed. Prior to the stay, the Utility and Cal Fire were also engaged in a mediation process.

Also, on February 20, 2018, the County of Calaveras filed suit against the Utility and the Utility’s vegetation management contractors to recover damages and other costs, based on the doctrine of inverse condemnation and negligence theory of liability. The County also sought punitive damages. On March 2, 2018, the County served a mediation demand seeking in excess of $167 million, having previously indicated that it intended to bring an approximately $85 million claim against the Utility. This claim included costs that the County of Calaveras allegedly incurred or expected to incur for infrastructure damage, erosion control, and other costs. The Utility and the County of Calaveras settled the County’s claims in November 2018 for $25.4 million.

Further, in May 2017, the OES indicated that it intended to bring a claim against the Utility that it estimated to be approximately $190 million.  This claim would include costs incurred by the OES for tree and debris removal, infrastructure damage, erosion control, and other claims related to the 2015 Butte fire. The Utility has not received any information or documentation from the OES since its May 2017 statement. In June 2017, the Utility entered into an agreement with the OES that extended its deadline to file a claim to December 2020.

PG&E Corporation’s and the Utility’s obligations with respect to such outstanding claims are expected to be determined through the Chapter 11 process. As described in Note 2, on July 1, 2019, the Bankruptcy Court entered an order approving the Bar Date of October 21, 2019, at 5:00 p.m. (Pacific Time) for filing claims against PG&E Corporation and the Utility relating to the period prior to the Petition Date, including claims in connection with the 2015 Butte fire. The Bar Date is subject to certain exceptions, including for claims arising under section 503(b)(9) of the Bankruptcy Code, the bar date for which occurred on April 22, 2019. It is expected that numerous wildfire-related claims will be filed against PG&E Corporation and the Utility in connection with the 2015 Butte fire through the Bar Date. On July 18, 2019, PG&E Corporation and the Utility filed a motion for entry of an order establishing procedures and schedules for the estimation of PG&E Corporation’s and the Utility’s aggregate liability for certain claims arising out of the 2015 Butte fire, as further described under the heading “Motion for the Establishment of Wildfire Claims Estimation Procedures” above.

Estimated Losses from Third-Party Claims

In connection with the 2015 Butte fire, the Utility may be liable for property damages, business interruption, interest, and attorneys’ fees without having been found negligent, through the doctrine of inverse condemnation.

In addition, the Utility may be liable for fire suppression costs, personal injury damages, and other damages if the Utility is found to have been negligent.  While the Utility believes it was not negligent, there can be no assurance that a court would agree with the Utility.

The Utility’s assessment of the estimated loss related to the 2015 Butte fire is based on assumptions about the number, size, and type of structures damaged or destroyed, the contents of such structures, the number and types of trees damaged or destroyed, as well as assumptions about personal injury damages, attorneys’ fees, fire suppression costs, and certain other damages.

The Utility has determined that it is probable that it will incur a loss of $1.1 billion in connection with the 2015 Butte fire. While this amount includes the Utility’s assumptions about fire suppression costs (including its assessment of the Cal Fire loss), it does not include any portion of the estimated claim from the OES. The Utility still does not have sufficient information to reasonably estimate any liability it may have for that additional claim.

The process for estimating costs associated with claims relating to the 2015 Butte fire requires management to exercise significant judgment based on a number of assumptions and subjective factors.  As more information becomes known, management estimates and assumptions regarding the financial impact of the 2015 Butte fire may result in material increases to the loss accrued.

PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets included liabilities for 2015 Butte fire third-party claims of $226 million and $212 million as of December 31, 2018 and June 30, 2019, respectively, reflecting payments of $14 million in January 2019, prior to the Petition Date. As of June 30, 2019, the Utility has paid $888 million of the $904 million in settlements to date in connection with the 2015 Butte fire.

If the Utility records losses in connection with claims relating to the 2015 Butte fire that materially exceed the amount the Utility accrued for these liabilities, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected in the reporting periods during which additional charges are recorded.

Loss Recoveries

The Utility has liability insurance from various insurers, that provides coverage for third-party liability attributable to the 2015 Butte fire in an aggregate amount of $922 million.  The Utility records insurance recoveries when it is deemed probable that a recovery will occur and the Utility can reasonably estimate the amount or its range.  Through June 30, 2019, the Utility recorded $922 million for probable insurance recoveries in connection with losses related to the 2015 Butte fire.  While the Utility plans to seek recovery of all insured losses, it is unable to predict the ultimate amount and timing of such insurance recoveries.  In addition, the Utility has received $60 million in cumulative reimbursements from the insurance policies of its vegetation management contractors. Recoveries of additional amounts under the insurance policies of the Utility’s vegetation management contractors, including policies where the Utility is listed as an additional insured, are uncertain.

The balance for the insurance receivable is included in Other accounts receivable in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets and was $85 million and $50 million as of December 31, 2018 and June 30, 2019, respectively, reflecting reimbursements of $35 million during the six months ended June 30, 2019.
OTHER CONTINGENCIES AND COMMITMENTS

PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to enforcement and litigation matters and environmental remediation.  A provision for a loss contingency is recorded when it is both probable that a liability has been incurred and the amount of the liability can reasonably be estimated.  PG&E Corporation and the Utility evaluate which potential liabilities are probable and the related range of reasonably estimated losses and record a charge that reflects their best estimate or the lower end of the range, if there is no better estimate. The assessment of whether a loss is probable or reasonably possible, and whether the loss or a range of losses is estimable, often involves a series of complex judgments about future events. PG&E Corporation’s and the Utility’s provision for loss and expense excludes anticipated legal costs, which are expensed as incurred.

The Utility also has substantial financial commitments in connection with agreements entered into to support its operating activities. 

PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows may be materially affected by the outcome of the following matters.

Enforcement and Litigation Matters

U.S. District Court Matters and Probation

On August 9, 2016, the jury in the federal criminal trial against the Utility in the United States District Court for the Northern District of California, in San Francisco, found the Utility guilty on one count of obstructing a federal agency proceeding and five counts of violations of pipeline integrity management regulations of the Natural Gas Pipeline Safety Act. On January 26, 2017, the court imposed a sentence on the Utility in connection with the conviction. The court sentenced the Utility to a five-year corporate probation period, oversight by the Monitor for a period of five years, with the ability to apply for early termination after three years, a fine of $3 million to be paid to the federal government, certain advertising requirements, and community service.

The probation includes a requirement that the Utility not commit any local, state, or federal crimes during the probation period. As part of the probation, the Utility has retained the Monitor at the Utility’s expense. The goal of the Monitor is to help ensure that the Utility takes reasonable and appropriate steps to maintain the safety of its gas and electric operations, and to maintain effective ethics, compliance and safety related incentive programs on a Utility-wide basis.

On November 27, 2018, the court overseeing the Utility’s probation issued an order requiring that the Utility, the United States Attorney’s Office for the Northern District of California (the “USAO”) and the Monitor provide written answers to a series of questions regarding the Utility’s compliance with the terms of its probation, including what requirements of the Utility’s probation “might be implicated were any wildfire started by reckless operation or maintenance of PG&E power lines” or “might be implicated by any inaccurate, slow, or failed reporting of information about any wildfire by PG&E.” The court also ordered the Utility to provide “an accurate and complete statement of the role, if any, of PG&E in causing and reporting the recent 2018 Camp fire in Butte County and all other wildfires in California” since January 2017 (“Question 4 of the November 27 Order”). On December 5, 2018, the court issued an order requesting that the Office of the California Attorney General advise the court of its view on “the extent to which, if at all, the reckless operation or maintenance of PG&E power lines would constitute a crime under California law.” The responses of the Attorney General were submitted on December 28, 2018, and the responses of the Utility, the USAO and the Monitor were submitted on December 31, 2018.

On January 3, 2019, the court issued a new order requiring that the Utility provide further information regarding the 2017 Atlas fire.  The court noted that “[t]his order postpones the question of the adequacy of PG&E’s response” to Question 4 of the November 27 Order.  On January 4, 2019, the court issued another order requiring that the Utility provide, “with respect to each of the eighteen October 2017 Northern California wildfires that [Cal Fire] has attributed to [the Utility’s] facilities,” information regarding the wind conditions in the vicinity of each fire’s origin and information about the equipment allegedly involved in each fire’s ignition.  The responses of the Utility were submitted on January 10, 2019.

On January 9, 2019, the court ordered the Utility to appear in court on January 30, 2019, as a result of the court’s finding that “there is probable cause to believe there has been a violation of the conditions of supervision” with respect to reporting requirements related to the 2017 Honey fire.  In addition, on January 9, 2019, the court issued an order (the “January 9 Order”) proposing to add new conditions of probation that would require the Utility, among other things, to:

prior to June 21, 2019, “re-inspect all of its electrical grid and remove or trim all trees that could fall onto its power lines, poles or equipment in high-wind conditions, . . . identify and fix all conductors that might swing together and arc due to slack and/or other circumstances under high-wind conditions[,] identify and fix damaged or weakened poles, transformers, fuses and other connectors [and] identify and fix any other condition anywhere in its grid similar to any condition that contributed to any previous wildfires,”

“document the foregoing inspections and the work done and . . . rate each segment’s safety under various wind conditions” and

at all times from and after June 21, 2019, “supply electricity only through those parts of its electrical grid it has determined to be safe under the wind conditions then prevailing.”

The Utility was ordered to show cause by January 23, 2019 as to why the Utility’s conditions of probation should not be modified as proposed.  The Utility’s response was submitted on January 23, 2019. The court requested that Cal Fire file a public statement, and invited the CPUC to comment, by January 25, 2019.  On January 30, 2019, the court found that the Utility had violated a condition of its probation with respect to reporting requirements related to the 2017 Honey fire. Also, on January 30, 2019, the court ordered the Utility to submit to the court on February 6, 2019 the 2019 Wildfire Safety Plan that the Utility was required to submit to the CPUC by February 6, 2019 in accordance with SB 901, and invited interested parties to comment on such plan by February 20, 2019. In addition, on February 14, 2019, the court ordered the Utility to provide additional information, including on its vegetation clearance requirements. The Utility submitted its response to the court on February 22, 2019. As of April 30, 2019, to the Utility’s knowledge, no parties have submitted comments to the court on the 2019 Wildfire Safety Plan.

On March 5, 2019, the court issued an order proposing to add new conditions of probation that would require the Utility, among other things, to:

“fully comply with all applicable laws concerning vegetation management and clearance requirements;”

“fully comply with the specific targets and metrics set forth in its wildfire mitigation plan, including with respect to enhanced vegetation management;”

submit to “regular, unannounced inspections” by the Monitor “of PG&E’s vegetation management efforts and equipment inspection, enhancement, and repair efforts” in connection with a requirement that the Monitor “assess PG&E’s wildfire mitigation and wildfire safety work;”

“maintain traceable, verifiable, accurate, and complete records of its vegetation management efforts” and report to the Monitor monthly on its vegetation management status and progress; and

“ensure that sufficient resources, financial and personnel, including contractors and employees, are allocated to achieve the foregoing” and to forgo issuing “any dividends until [the Utility] is in compliance with all applicable vegetation management requirements as set forth above.”

The court ordered all parties to show cause by March 22, 2019, as to why the Utility’s conditions of probation should not be modified as proposed. The responses of the Utility, the USAO, Cal Fire, the CPUC, and non-party victims were filed on March 22, 2019. At a hearing on April 2, 2019, the court indicated it would impose the new conditions of probation proposed on March 5, 2019, on the Utility, and on April 3, 2019, the court issued an order imposing the new terms though amended the second condition to clarify that “[f]or purposes of this condition, the operative wildfire mitigation plan will be the plan ultimately approved by the CPUC.”

Also, on April 2, 2019, the court directed the parties to submit briefing by April 16, 2019, regarding whether the court can extend the term of probation beyond five years in light of the violation that has been adjudicated and whether the Monitor reports should be made public. The responses of the Utility, the USAO, and the Monitor were filed on April 16, 2019. The Utility’s response contended that the term of probation may not be extended beyond five years and the USAO’s response contended that whether the term of probation could be extended beyond five years was an open legal issue.

The court held a sentencing hearing on the probation violation related to reporting requirements in connection with the 2017 Honey fire on May 7, 2019. After that hearing, the court imposed two additional conditions of probation by order dated May 14, 2019: (1) requiring that PG&E’s Board of Directors, Chief Executive Officer, senior executives, the Monitor and U.S. Probation Officer visit the towns of Paradise and San Bruno “to gain a firsthand understanding of the harm inflicted on those communities;” and (2) requiring that a committee of PG&E’s Board of Directors assume responsibility for tracking progress of the 2019 Wildfire Safety Plan and the additional terms of probation regarding wildfire safety, reporting in writing to the full Board at least quarterly. The court also stated that it was not going to rule at this time on whether the court has authority to extend probation and would leave that question “in abeyance.” The court did not discuss whether the Monitor reports should be made public. Members of PG&E Corporation’s Board of Directors and senior management attended site visits to the Town of Paradise on June 7, 2019 and the City of San Bruno on July 16, 2019, which were coordinated by the U.S. Probation Officer overseeing the Utility’s probation. In addition, the Compliance and Public Policy Committee, a committee of PG&E Corporation’s Board of Directors, will be responsible for tracking the Utility’s progress against the Utility’s wildfire mitigation plan, as approved by the CPUC, and compliance with the terms of the Utility’s probation regarding wildfire safety.
 
On July 10, 2019, the court ordered the Utility to respond to a Wall Street Journal article titled “PG&E Knew for Years Its Lines Could Spark Wildfires, and Didn’t Fix Them” on a paragraph-by-paragraph basis, stating the extent to which each paragraph in the article is accurate.  The court also ordered the Utility to disclose all political contributions made by the Utility since January 1, 2017, and provide additional explanations regarding those contributions and dividends distributed prior to filing the Chapter 11 Cases. The Utility filed its response with the court on July 31, 2019. In the response, the Utility disagreed with the Wall Street Journal article’s suggestion that the Utility knew of the specific maintenance conditions that caused the 2018 Camp fire and nonetheless deferred work that would have addressed those conditions.

CPUC and FERC Matters

Order Instituting an Investigation into the 2017 Northern California Wildfires

On June 27, 2019, the CPUC issued an OII (the “2017 Northern California Wildfires OII”) to determine whether the Utility “violated any provision(s) of the California Public Utilities Code (PU Code), Commission General Orders (GO) or decisions, or other applicable rules or requirements pertaining to the maintenance and operation of its electric facilities that were involved in igniting fires in its service territory in 2017.”

The 2017 Northern California Wildfires OII discloses the findings of a June 13, 2019 report by the SED, which, among other things, alleges that the Utility committed 27 violations in connection with 12 of the 2017 Northern California wildfires (specifically, the Adobe, Atlas, Cascade, Norrbom, Nuns, Oakmont/Pythian, Partrick, Pocket, Point, Potter/Redwood, Sulphur and Youngs fires). As described in the OII, the 27 alleged violations include failure to maintain vegetation clearances, failure to identify and abate hazardous trees, improper record keeping, incomplete patrol prior to re-energizing a circuit, failure to retain evidence, failure to report an incident, and failure to maintain clearances between lines. No violations were identified by the SED in connection with the Cherokee, La Porte and Tubbs fires. The 37 fire was determined by the SED to not be a reportable incident. The SED report does not address the Lobo and McCourtney fires because Cal Fire referred its investigations into these fires to local law enforcement and the information contained in its investigation reports related to these fires remains confidential. On a status conference call before the assigned ALJ on July 29, 2019, the SED informed the parties that because the Nevada County District Attorney had decided not to pursue criminal charges in connection with the Lobo and McCourtney fires, the SED may add alleged violations related to those fires and the 2018 Camp fire to the OII.

The 2017 Northern California Wildfires OII requires the Utility to (i) show cause by July 29, 2019 why it should not be sanctioned for the 27 violations alleged in the SED report and (ii) submit a report by August 5, 2019, responding to information requests relating to “matters of concern that […] warrant further investigation and possible charges for violations of law.” These latter matters include the following: (i) the Utility’s vegetation management procedures and practices, (ii) the Utility’s procedures and practices regarding use of “recloser” devices in fire risk areas and during fire season, (iii) the Utility’s lack of procedures or policies for proactive de-energization of power lines during times of extreme fire danger, and (iv) the Utility’s record-keeping and other practices. The Utility is also required to take certain corrective actions and provide information regarding the qualifications of vegetation management personnel within 30 days of the issuance of the 2017 Northern California Wildfires OII. The Utility must also file an application to develop an open source, publicly available asset management system/database and mobile app, the costs of development and continued operation of which would be at shareholder expense.

The OII also indicates that the assigned commissioner shall set a prehearing conference for 45 to 60 days after the initiation of the proceeding or as soon as practicable after the CPUC makes the assignment. The assigned commissioner will also issue a scoping memo setting forth the scope of the proceeding and establishing a procedural schedule.

As required by the OII, on July 29, 2019, the Utility filed its initial response to the OII. In the initial response, the Utility indicated that it intends to fully cooperate with the CPUC but also stated that it disagreed with certain of the alleged violations set forth in the OII. The Utility also filed a Corrective Actions Report and an Application to Develop a Mobile Application and Supporting Systems, both as required by the OII. Also as required by the OII, on August 5, 2019, the Utility submitted a report to respond to the information requests contained in the OII, as explained above.

Based on the information currently available, PG&E Corporation and the Utility believe it is probable that the CPUC will impose penalties, including fines or other remedies, on the Utility.  The Utility is unable to reasonably estimate the amount or range of future charges that could be incurred given the CPUC’s wide discretion and the number of factors that can be considered in determining penalties.  The Utility is unable to predict the timing and outcome of this proceeding. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility were required to pay a material amount of penalties or if the Utility were required to incur a material amount of costs that it cannot recover through rates.

This proceeding is not subject to the automatic stay imposed as a result of the commencement of the Chapter 11 Cases; however, collection efforts in connection with fines or penalties arising out of this proceeding are stayed.

Order Instituting an Investigation and Order to Show Cause into the Utilitys Locate and Mark practices

On December 14, 2018, the CPUC issued an order instituting investigation and order to show cause (the “OII”) to assess the Utility’s practices and procedures related to the locating and marking of natural gas facilities. The OII directs the Utility to show cause as to why the CPUC should not find violations in this matter, and why the CPUC should not impose penalties, and/or any other forms of relief, if any violations are found. The Utility also is directed in the OII to provide a report on specific matters, including that it is conducting locate and mark programs in a safe manner.

The OII cites a report by the SED dated December 6, 2018, which alleges that the Utility violated the law pertaining to the locating and marking of its gas facilities and falsified records related to its locate and mark activities between 2012 and 2017. As described in the OII, the SED cites reports issued in this matter by two consultants retained by the Utility, that (i) included certain facts and conclusions about the extent of inaccuracies in the Utility’s late tickets and the reasons for the inaccuracies, and (ii) provided an analysis, based on the available data, of tickets that should be properly categorized as late, and identification of associated dig-ins. As a result, the OII will determine whether the Utility violated any provision of the Public Utilities Code, general orders, federal law adopted by California, other rules, or requirements, and/or other state or federal law, by its locate and mark policies, practices, and related issues, and the extent to which the Utility’s practices with regard to locate and mark may have diminished system safety.

The CPUC indicates that it has not concluded that the Utility has violated the law in any instance pertaining to late tickets, locating and marking, or any matter related to either, or to any other matter raised in this OII. However, if violations are found, the CPUC will consider what monetary fines and other remedies are appropriate, will review the duration of violations and, if supported by the evidence, it will consider ordering daily fines.

On March 14, 2019, as directed by the CPUC, the Utility submitted a report that addressed the SED report and responded to the order to show cause.  A prehearing conference was held on April 4, 2019, to establish scope and a procedural schedule.  The assigned Commissioner and ALJ encouraged the SED and the Utility to reach a partial stipulation in order to streamline the proceeding.  On April 24, 2019, the Utility provided notice of a settlement conference and the parties have continued settlement discussions.  On May 7, 2019, the assigned Commissioner issued a scoping memo and ruling that included within the proceedings, in addition to the issues identified in the OII relating to the Utility’s locate and mark procedures, issues relating to the Utility’s use of “qualified electrical workers” for locating and marking underground infrastructure. On July 24, 2019, the SED submitted its opening testimony to the CPUC.  A status conference with the ALJ was held on July 30, 2019. The parties continue settlement discussions. In accordance with the current procedural schedule issued by the ALJ on June 27, 2019, intervenor testimony is due August 16, 2019, and the Utility’s reply testimony is due September 18, 2019.  The SED’s rebuttal testimony is due October 4, 2019.  Evidentiary hearings are scheduled for October 21 to 25, 2019.

Based on the information available to PG&E Corporation and the Utility as of the date of this filing, PG&E Corporation and the Utility believe it is probable that the Utility will incur penalties, including fines or other remedies. Accordingly, PG&E Corporation and the Utility recorded a charge during the quarter ended June 30, 2019 for an amount that is not material, which corresponds to the lower end of the range of PG&E Corporation's and the Utility's reasonably estimated losses and is subject to change based on additional information.  PG&E Corporation and the Utility are unable to determine a better estimate within such range given the CPUC’s wide discretion and the number of factors that can be considered in determining penalties.  The Utility is unable to predict the timing and outcome of this proceeding. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows could be materially affected if the Utility were required to pay a material amount of penalties or if the Utility were required to incur a material amount of costs that it cannot recover through rates.

This proceeding is not subject to the automatic stay imposed as a result of the commencement of the Chapter 11 Cases; however, collection efforts in connection with fines or penalties arising out of this proceeding are stayed.

For more information about this proceeding, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8 of the 2018 Form 10-K.

Order Instituting an Investigation into Compliance with Ex Parte Communication Rules

On April 26, 2018, the CPUC approved the revised PD issued on April 3, 2018, adopting the settlement agreement jointly submitted to the CPUC on March 28, 2017, as modified (the “settlement agreement”) by the Utility, the Cities of San Bruno and San Carlos, PAO (formerly known as the Office of Ratepayer Advocates or ORA), the SED, and TURN.

The decision resulted in a total penalty of $97.5 million comprised of: (1) a $12 million payment to the California General Fund, (2) forgoing collection of $63.5 million of GT&S revenue requirements for the years 2018 ($31.75 million) and 2019 ($31.75 million), (3) a $10 million one-time revenue requirement adjustment to be amortized in equivalent annual amounts over the Utility’s next GRC cycle (i.e., the 2020 GRC), and (4) compensation payments to the Cities of San Bruno and San Carlos in a total amount of $12 million ($6 million to each city).  In addition, the settlement agreement provides for certain non-financial remedies, including enhanced noticing obligations between the Utility and CPUC decision-makers, as well as certification of employee training on the CPUC ex parte communication rules.  Under the terms of the settlement agreement, customers will bear no costs associated with the financial remedies set forth above.

As a result of the CPUC’s April 26, 2018 decision, on May 17, 2018, the Utility made a $12 million payment to the California General Fund and $6 million payments to each of the Cities of San Bruno and San Carlos. At June 30, 2019, PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets include an $16 million accrual for a portion of the 2019 GT&S revenue requirement reduction. In accordance with accounting rules, adjustments related to revenue requirements are recorded in the periods in which they are incurred.

The CPUC also ordered a second phase in this proceeding to determine if any of the additional communications that the Utility reported to the CPUC on September 21, 2017, violate the CPUC ex parte rules. On June 28, 2019, the Cities of San Bruno and San Carlos, PAO, the SED, TURN, and the Utility filed a joint motion with the CPUC seeking approval of a comprehensive settlement agreement that addresses all issues in the second phase of this proceeding. The settlement agreement proposed that the Utility pay a total penalty of $10 million comprised of: (1) a $2 million payment to the California General Fund, (2) forgoing collection of $5 million in revenue requirements during the term of its 2019 GT&S rate case, (3) forgoing collection of $1 million in revenue requirement during the term of its 2020 GRC cycle, and (4) compensation payments to the Cities of San Bruno and San Carlos in a total amount of $2 million ($1 million to each city). According to the terms of the settlement, these payments and forgone collection would not take place until a plan of reorganization is approved in the Chapter 11 Cases. In accordance with accounting rules, adjustments related to forgone collections would be recorded in the periods in which they are incurred.

At June 30, 2019, PG&E Corporation’s and the Utility’s Consolidated Balance Sheets include a $4 million accrual for the amounts payable to the California General Fund and the Cities of San Bruno and San Carlos. The Utility is unable to predict whether the CPUC will approve the settlement.

For more information about this proceeding, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8 of the 2018 Form 10-K.

Transmission Owner Rate Case Revenue Subject to Refund

The FERC determines the amount of authorized revenue requirements, including the rate of return on electric transmission assets, that the Utility may collect in rates in the TO rate case. The FERC typically authorizes the Utility to charge new rates based on the requested revenue requirement, subject to refund, before the FERC has issued a final decision. The Utility bills and records revenue based on the amounts requested in its rate case filing and records a reserve for its estimate of the amounts that are probable of refund. Rates subject to refund went into effect on March 1, 2017, and March 1, 2018, for TO18 and TO19, respectively. Rates subject to refund for TO20 went into effect on May 1, 2019.

On October 1, 2018, the ALJ issued an initial decision in the TO18 rate case and the Utility filed initial briefs on October 31, 2018, in response to the ALJ’s recommendations. The Utility expects the FERC to issue a decision in the TO18 rate case by late-2019, however, that decision will likely be the subject of requests for rehearing and appeal.

On September 21, 2018, the Utility filed an all-party settlement with FERC, which was approved by FERC on December 20, 2018, in connection with TO19. As part of the settlement, the TO19 revenue requirement will be set at 98.85% of the revenue requirement for TO18 that will be determined upon issuance of a final unappealable decision in TO18.

On November 30, 2018, the FERC issued an order accepting the Utility’s October 2018 filing of its TO20 formula rate case, subject to hearings and refund, and established May 1, 2019, as the effective date for rate changes.  FERC also ordered that the hearings will be held in abeyance pending settlement discussions among the parties. 

The Utility is unable to predict the timing or outcome of FERC’s decisions in the TO18 and TO19 proceedings or the timing or outcome of the TO20 proceeding.

Natural Gas Transmission Pipeline Rights-of-Way

In 2012, the Utility notified the CPUC and the SED that the Utility planned to complete a system-wide survey of its transmission pipelines in an effort to address a self-reported violation whereby the Utility did not properly identify encroachments (such as building structures and vegetation overgrowth) on the Utility’s pipeline rights-of-way.  The Utility also submitted a proposed compliance plan that set forth the scope and timing of remedial work to remove identified encroachments over a multi-year period and to pay penalties if the proposed milestones were not met.  In March 2014, the Utility informed the SED that the survey had been completed and that remediation work, including removal of the encroachments, was expected to continue for several years. The SED has not addressed the Utility’s proposed compliance plan, and it is reasonably possible that the SED will impose fines on the Utility in the future based on the Utility’s failure to continuously survey its system and remove encroachments.  The Utility is unable to reasonably estimate the amount or range of future charges that could be incurred given the SED’s wide discretion and the number of factors that can be considered in determining penalties.

Other Matters

PG&E Corporation and the Utility are subject to various claims, lawsuits, and regulatory proceedings that separately are not considered material.  Accruals for contingencies related to such matters (excluding amounts related to the contingencies discussed above under “Enforcement and Litigation Matters”) totaled $98 million at December 31, 2018. These amounts were included in Other current liabilities in the Condensed Consolidated Balance Sheets. On the Petition Date, these amounts were moved to LSTC. PG&E Corporation and the Utility do not believe it is reasonably possible that the resolution of these matters will have a material impact on their financial condition, results of operations, or cash flows.

2015 GT&S Rate Case Capital Disallowance

On June 23, 2016, the CPUC approved a final phase one decision in the Utility’s 2015 GT&S rate case. The phase one decision excluded from rate base $696 million of capital spending in 2011 through 2014 in excess of the amount adopted in the prior GT&S rate case. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to an audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. Additional charges may be required in the future based on the outcome of the CPUC’s audit of 2011 through 2014 capital spending. Capital disallowances are reflected in operating and maintenance expenses in the Condensed Consolidated Statements of Income. For more information, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8 of the 2018 Form 10-K.

Environmental Remediation Contingencies

The Utility’s environmental remediation liability is primarily included in non-current liabilities on the Condensed Consolidated Balance Sheets and is comprised of the following:
 
Balance at
(in millions)
June 30, 2019
 
December 31, 2018
Topock natural gas compressor station
$
346

 
$
369

Hinkley natural gas compressor station
142

 
146

Former manufactured gas plant sites owned by the Utility or third parties (1)
580

 
520

Utility-owned generation facilities (other than fossil fuel-fired),
other facilities, and third-party disposal sites
(2)
112

 
111

Fossil fuel-fired generation facilities and sites (3)
125

 
137

Total environmental remediation liability
$
1,305

 
$
1,283

 
 
 
 
(1) Primarily driven by the following sites: Vallejo, San Francisco East Harbor, Napa, Beach Street, San Francisco North Beach, and San Rafael MGP-Bio Marin MGP.
(2) Primarily driven by the Geothermal landfill and Shell Pond site.
(3) Primarily driven by the San Francisco Potrero Power Plant.

The Utility’s gas compressor stations, former manufactured gas plant sites, power plant sites, gas gathering sites, and sites used by the Utility for the storage, recycling, and disposal of potentially hazardous substances are subject to requirements issued by the Environmental Protection Agency under the Federal Resource Conservation and Recovery Act in addition to other state hazardous waste laws.  The Utility has a comprehensive program in place designed to comply with federal, state, and local laws and regulations related to hazardous materials, waste, remediation activities, and other environmental requirements.  The Utility assesses and monitors the environmental requirements on an ongoing basis, and implements changes to its program as deemed appropriate. The Utility’s remediation activities are overseen by the DTSC, several California regional water quality control boards, and various other federal, state, and local agencies.

The Utility’s environmental remediation liability at June 30, 2019, reflects its best estimate of probable future costs for remediation based on the current assessment data and regulatory obligations. Future costs will depend on many factors, including the extent of work necessary to implement final remediation plans and the Utility’s time frame for remediation.  The Utility may incur actual costs in the future that are materially different than this estimate and such costs could have a material impact on results of operations, financial condition, and cash flows during the period in which they are recorded. At June 30, 2019, the Utility expected to recover $960 million of its environmental remediation liability for certain sites through various ratemaking mechanisms authorized by the CPUC. 

For more information, see remediation site descriptions below and see Note 14 of the Notes to the Consolidated Financial Statements in Item 8 of the 2018 Form 10-K.

Natural Gas Compressor Station Sites

The Utility is legally responsible for remediating groundwater contamination caused by hexavalent chromium used in the past at the Utility’s natural gas compressor stations. The Utility is also required to take measures to abate the effects of the contamination on the environment.

Topock Site

The Utility’s remediation and abatement efforts at the Topock site are subject to the regulatory authority of the California DTSC and the U.S. Department of the Interior. On April 24, 2018, the DTSC authorized the Utility to build an in-situ groundwater treatment system to convert hexavalent chromium into a non-toxic and non-soluble form of chromium. Construction activities began in October 2018 and will continue for several years. The Utility’s undiscounted future costs associated with the Topock site may increase by as much as $302 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Topock site are expected to be recovered primarily through the HSM, where 90% of the costs are recovered in rates.

Hinkley Site

The Utility has been implementing remediation measures at the Hinkley site to reduce the mass of the chromium plume in groundwater and to monitor and control movement of the plume. The Utility’s remediation and abatement efforts at the Hinkley site are subject to the regulatory authority of the California Regional Water Quality Control Board, Lahontan Region. In November 2015, the California Regional Water Quality Control Board, Lahontan Region adopted a clean-up and abatement order directing the Utility to contain and remediate the underground plume of hexavalent chromium and the potential environmental impacts. The final order states that the Utility must continue and improve its remediation efforts, define the boundaries of the chromium plume, and take other action. Additionally, the final order sets plume capture requirements, requires a monitoring and reporting program, and includes deadlines for the Utility to meet interim cleanup targets. The United States Geological Survey team is currently conducting a background study on the site to better define the chromium plume boundaries. A draft background study report is expected to be issued in 2019 and finalized in 2020. The Utility’s undiscounted future costs associated with the Hinkley site may increase by as much as $139 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Hinkley site will not be recovered through rates.

Former Manufactured Gas Plants

Former MGPs used coal and oil to produce gas for use by the Utility’s customers before natural gas became available. The by-products and residues of this process were often disposed of at the MGPs themselves. The Utility has undertaken a program to manage the residues left behind as a result of the manufacturing process; many of the sites in the program have been addressed. The Utility’s undiscounted future costs associated with MGP sites may increase by as much as $528 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the MGP sites are recovered through the HSM, where 90% of the costs are recovered in rates.

Utility-Owned Generation Facilities and Third-Party Disposal Sites

Utility-owned generation facilities and third-party disposal sites often involve long-term remediation. The Utility’s undiscounted future costs associated with Utility-owned generation facilities and third-party disposal sites may increase by as much as $98 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the Utility-owned generation facilities and third-party disposal sites are recovered through the HSM, where 90% of the costs are recovered in rates.

Fossil Fuel-Fired Generation Sites

In 1998, the Utility divested its generation power plant business as part of generation deregulation. Although the Utility sold its fossil-fueled power plants, the Utility retained the environmental remediation liability associated with each site. The Utility’s undiscounted future costs associated with fossil fuel-fired generation sites may increase by as much as $86 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the fossil fuel-fired sites will not be recovered through rates.

Insurance

Wildfire Insurance

In 2018, PG&E Corporation and the Utility renewed their liability insurance coverage for wildfire events in an aggregate amount of approximately $1.4 billion for the period from August 1, 2018 through July 31, 2019, comprised of $700 million for general wildfire liability in policies covering wildfire and non-wildfire events (subject to an initial self-insured retention of $10 million per occurrence), and $700 million for wildfire property damages only, which included approximately $200 million of coverage through the use of a catastrophe bond. For the period from August 1, 2019 through July 31, 2020, PG&E Corporation and the Utility have secured approximately $430 million for general wildfire liability (subject to an initial self-insured retention of $10 million per occurrence). PG&E Corporation and the Utility continue to pursue additional insurance coverage for the period from August 1, 2019 through July 30, 2020. Various coverage limitations applicable to different insurance layers could result in uninsured costs in the future depending on the amount and type of damages resulting from covered events.

PG&E Corporation’s and the Utility’s cost of obtaining the wildfire and non-wildfire insurance coverage in place for the period of August 1, 2019 through July 31, 2020 (consisting of the $430 million general wildfire liability coverage described above and $520 million for non-wildfire general liability) is approximately $190 million, compared to the approximately $50 million that the Utility is currently recovering through rates through December 31, 2019. The Utility intends to seek recovery for the full amount of premium costs paid in excess of the amount the Utility currently is recovering from customers through the end of the current GRC period, which ends on December 31, 2019.

PG&E Corporation and the Utility record a receivable for insurance recoveries when it is deemed probable that recovery of a recorded loss will occur.  Through June 30, 2019, PG&E Corporation and the Utility recorded $1.38 billion for probable insurance recoveries in connection with the 2018 Camp fire and $842 million for probable insurance recoveries in connection with the 2017 Northern California wildfires. These amounts reflect an assumption that the cause of each fire is deemed to be a separate occurrence under the insurance policies. The amount of the receivable is subject to change based on additional information. PG&E Corporation and the Utility intend to seek full recovery for all insured losses and believe it is reasonably possible that they will record a receivable for the full amount of the insurance limits in the future.

Nuclear Insurance

The Utility maintains multiple insurance policies through NEIL and European Mutual Association for Nuclear Insurance, covering nuclear or non-nuclear events at the Utility’s two nuclear generating units at Diablo Canyon and the retired Humboldt Bay Unit 3.  If NEIL losses in any policy year exceed accumulated funds, the Utility could be subject to a retrospective assessment.  If NEIL were to exercise this assessment, as of the policy renewal on April 1, 2020, the maximum aggregate annual retrospective premium obligation for the Utility would be approximately $41 million.  If European Mutual Association for Nuclear Insurance losses in any policy year exceed accumulated funds, the Utility could be subject to a retrospective assessment of approximately $5 million, as of the policy renewal on April 1, 2020. For more information about the Utility’s nuclear insurance coverage, see Note 14 of the Notes to the Consolidated Financial Statements in Item 8 of the 2018 Form 10-K. 

Tax Matters

PG&E Corporation’s and the Utility’s unrecognized tax benefits may change significantly within the next 12 months due to the resolution of audits.  As of June 30, 2019, it is reasonably possible that unrecognized tax benefits will decrease by approximately $10 million within the next 12 months.  PG&E Corporation and the Utility believe that the majority of the decrease will not impact net income. 

PG&E Corporation does not believe that the Chapter 11 Cases resulted in loss of or limitation on the utilization of any of the tax carryforwards. PG&E Corporation will continue to monitor the status of tax carryforwards during the pendency of the Chapter 11 Cases.

Purchase Commitments

In the ordinary course of business, the Utility enters into various agreements to purchase power and electric capacity; natural gas supply, transportation, and storage; nuclear fuel supply and services; and various other commitments.  At December 31, 2018, the Utility had undiscounted future expected obligations of approximately $40 billion. (See Note 14 of the Notes to the Consolidated Financial Statements in Item 8 of the 2018 Form 10-K.) The Utility has not entered into any new material commitments during the six months ended June 30, 2019.