PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to enforcement and litigation matters and environmental remediation.  A provision for a loss contingency is recorded when it is both probable that a liability has been incurred and the amount of the liability can be reasonably estimated.  The Utility also has substantial financial commitments in connection with agreements entered into to support its operating activities.  PG&E Corporation’s and the Utility’s financial condition, results of operations, and cash flows may be materially affected by the outcome of the following matters.

Enforcement and Litigation Matters

Northern California Wildfires

Beginning on October 8, 2017, multiple wildfires spread through Northern California, including Napa, Sonoma, Butte, Humboldt, Mendocino, Del Norte, Lake, Nevada, and Yuba Counties, as well as in the area surrounding Yuba City. According to the Cal Fire California Statewide Fire Summary dated October 30, 2017, at the peak of the wildfires, there were 21 major wildfires in Northern California that, in total, burned over 245,000 acres and destroyed an estimated 8,900 structures. The wildfires also resulted in 44 fatalities.

The Utility incurred costs of $259 million for service restoration and repair to the Utility’s facilities (including $108 million in capital expenditures) through March 31, 2018, in connection with these fires. While the Utility believes that such costs are recoverable through CEMA, its CEMA requests are subject to CPUC approval. The Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility is unable to recover such costs.

The Northern California wildfires are under investigation by Cal Fire and the CPUC, including the possible role of the Utility’s power lines and other facilities. The Utility expects that Cal Fire will issue a report or reports stating its conclusions as to the sources of ignition of the fires and the ways that they progressed. Further, the CPUC’s SED is conducting investigations to assess the compliance of electric and communication companies’ facilities with applicable rules and regulations in fire-impacted areas. According to information made available by the CPUC, investigation topics include, but are not limited to, maintenance of facilities, vegetation management, and emergency preparedness and response. Various other entities, including fire departments, may also be investigating certain of the fires. (For example, on February 3, 2018, it was reported that investigators with the Santa Rosa Fire Department had completed their investigation of two small fires that reportedly destroyed two homes and damaged one outbuilding and had concluded that the Utility’s facilities, along with high wind and other factors, contributed to those fires.) It is uncertain when the investigations will be complete and whether Cal Fire will release any preliminary findings before its investigations are complete.

As of April 30, 2018, the Utility had submitted 23 electric incident reports to the CPUC associated with the Northern California wildfires where Cal Fire or the Utility has identified a site as potentially involving the Utility’s facilities in its investigation and the property damage associated with each incident exceeded $50,000. The information contained in these reports is factual and preliminary, and does not reflect a determination of the causes of the fires. The investigations into the fires are ongoing.

If the Utility’s facilities, such as its electric distribution and transmission lines, are determined to be the substantial cause of one or more fires, and the doctrine of inverse condemnation applies, the Utility could be liable for property damage, business interruption, interest, and attorneys’ fees without having been found negligent, which liability, in the aggregate, could be substantial and have a material adverse effect on PG&E Corporation and the Utility. California courts have imposed liability under the doctrine of inverse condemnation in legal actions brought by property holders against utilities on the grounds that losses borne by the person whose property was damaged through a public use undertaking should be spread across the community that benefited from such undertaking and based on the assumption that utilities have the ability to recover these costs from their customers. Further, courts could determine that the doctrine of inverse condemnation applies even in the absence of an open CPUC proceeding for cost recovery, or before a potential cost recovery decision is issued by the CPUC. There is no guarantee that the CPUC would authorize cost recovery even if a court decision were to determine that the doctrine of inverse condemnation applies. In addition to such claims for property damage, business interruption, interest and attorneys’ fees, the Utility could be liable for fire suppression costs, evacuation costs, medical expenses, personal injury damages, and other damages under other theories of liability, including if the Utility were found to have been negligent, which liability, in the aggregate, could be substantial and have a material adverse effect on PG&E Corporation and the Utility. Further, the Utility could be subject to material fines or penalties if the CPUC or any other law enforcement agency brought an enforcement action and determined that the Utility failed to comply with applicable laws and regulations.

Given the incomplete investigations and the uncertainty as to the causes of the fires, PG&E Corporation and the Utility do not believe a loss is probable at this time. However, it is reasonably possible that facts could emerge through the course of the various investigations that lead PG&E Corporation and the Utility to believe that a loss is probable, resulting in an accrued liability in the future, the amount of which could be substantial. PG&E Corporation and the Utility currently are unable to reasonably estimate the amount of potential losses (or range of amounts) that they could incur given the preliminary stages of the investigations and the uncertainty regarding the extent and magnitude of potential damages. On January 31, 2018, the California Department of Insurance issued a press release announcing an update on property losses in connection with the October and December wildfires in California, stating that, as of such date, “insurers have received nearly 45,000 insurance claims totaling more than $11.79 billion in losses,” of which approximately $10 billion relates to statewide claims from the October 2017 wildfires. The remaining amount relates to claims from the Southern California December 2017 wildfires. According to the California Department of Insurance, as of the date of the press release, more than 21,000 homes, 3,200 businesses, and more than 6,100 vehicles, watercraft, farm vehicles, and other equipment were damaged or destroyed by the October 2017 wildfires. PG&E Corporation and the Utility have not independently verified these estimates. The California Department of Insurance did not state in its press release whether it intends to provide updated estimates of losses in the future.

If the Utility’s facilities are determined to be the cause of one or more of the Northern California wildfires, PG&E Corporation and the Utility could be liable for the related property losses and other damages. The California Department of Insurance January 31, 2018 press release reflects insured property losses only. The press release does not account for uninsured losses, interest, attorneys’ fees, fire suppression costs, evacuation costs, medical expenses, personal injury and wrongful death damages or other costs. If the Utility were to be found liable for certain or all of such other costs and expenses, the amount of PG&E Corporation’s and the Utility’s liability could be higher than the approximately $10 billion in estimated insured property losses with respect to the wildfires that occurred in October 2017, depending on the extent of the damage in connection with such fire or fires. As a result, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected.

As of May 1, 2018, PG&E Corporation and the Utility are aware of more than 150 lawsuits representing approximately 2,500 plaintiffs, 6 of which seek to be certified as class actions, that have been filed against PG&E Corporation and the Utility in the Sonoma, Napa and San Francisco Counties Superior Courts. The lawsuits allege, among other things, negligence, inverse condemnation, trespass, and private nuisance. They principally assert that PG&E Corporation’s and the Utility’s alleged failure to maintain and repair their distribution and transmission lines and failure to properly maintain the vegetation surrounding such lines were the causes of the fires. The plaintiffs seek damages that include wrongful death, personal injury, property damage, evacuation costs, medical expenses, punitive damages, attorneys’ fees, and other damages. In addition, insurance carriers who have made payments to their insureds for property damage arising out of the fires have filed 8 subrogation complaints in the San Francisco County Superior Court. These complaints allege, among other things, negligence, inverse condemnation, trespass and nuisance. The allegations are similar to the ones made by individual plaintiffs. Various government entities, including Mendocino, Napa and Sonoma Counties, have also asserted claims against PG&E Corporation and the Utility in the San Francisco County Superior Court based on the damages that these public entities allegedly suffered as a result of the fires. Such alleged damages include, among other things, loss of natural resources, loss of public parks, property damages and fire suppression costs. The causes of action and allegations are similar to the ones made by individual plaintiffs and the insurance carriers. On April 16, 2018, PG&E Corporation and the Utility submitted notices of claims against, among other government entities, Mendocino, Napa and Sonoma Counties, reserving their rights to pursue claims against these entities for contribution and equitable indemnity stemming from these entities’ actions and inactions before and during the Northern California wildfires.

On October 31, 2017, a group of plaintiffs submitted a petition for coordination to the Chair of the Judicial Council of California and requested coordination of the litigation in the San Francisco Superior Court. On November 9, 2017, PG&E Corporation and the Utility submitted a petition for coordination to the Chair of the Judicial Council of California, and requested separate coordination in the counties in which the fires occurred. On January 4, 2018, the coordination motion judge of the San Francisco Superior Court entered an order granting coordination of the litigation in connection with the Northern California wildfires and recommending that the coordinated proceeding take place in the San Francisco Superior Court. On January 12, 2018, the Judicial Council of California accepted the coordination motion judge’s recommendation and assigned the coordinated proceeding to San Francisco. The first case management conference took place on February 27, 2018. The individual plaintiffs, subrogation insurance carriers and certain government entities filed Master Complaints on March 12, 2018, and PG&E Corporation and the Utility filed Master Answers to those Master Complaints on March 16, 2018. PG&E Corporation and the Utility also filed on March 16, 2018, a legal challenge to the inverse condemnation causes of action in the Master Complaints. The court set a hearing on that challenge for May 18, 2018. The next case management conference will be scheduled at the May 18, 2018 hearing.

In addition, two derivative lawsuits for breach of fiduciary duties and unjust enrichment were filed in the San Francisco County Superior Court on November 16, 2017 and November 20, 2017, respectively. The first lawsuit is filed against the members of the Board of Directors and certain officers of PG&E Corporation. PG&E Corporation is identified as a nominal defendant in that action. The second lawsuit is filed against the members of the Board of Directors, certain former members of the Board of Directors, and certain officers of both PG&E Corporation and the Utility. PG&E Corporation and the Utility are identified as nominal defendants in that action. On February 14, 2018, the Court consolidated the two lawsuits, and, on April 13, 2018, the plaintiffs filed a consolidated complaint. After the parties reached an agreement regarding a stay of the derivative proceeding pending resolution of the tort actions described above and any regulatory proceeding relating to the Northern California wildfires, on April 24, 2018, the Court entered a stipulation and order to stay. The stay is subject to certain conditions regarding discovery.

PG&E Corporation and the Utility expect to be the subject of additional lawsuits in connection with the Northern California wildfires. The wildfire litigation could take a number of years to be resolved because of the complexity of the matters, including the ongoing investigation into the causes of the fires and the growing number of parties and claims involved. The Utility has liability insurance from various insurers, which provides coverage for third-party liability attributable to the Northern California wildfires in an aggregate amount of approximately $840 million, subject to an initial self-insured retention of $10 million per occurrence and further retentions of approximately $40 million per occurrence. In addition, coverage limits within the Utility's wildfire insurance policies could result in further material self-insured costs in the event each fire were deemed to be a separate occurrence under the terms of the insurance policies. If the Utility were to be found liable for one or more fires, the Utility's insurance could be insufficient to cover that liability, depending on the extent of the damage in connection with such fire or fires. Following the Northern California wildfires, PG&E Corporation reinstated its liability insurance in the amount of approximately $630 million for any potential future event.

In addition, it could take a number of years before the Utility’s final liability is known. The Utility may be unable to recover costs in excess of insurance through regulatory mechanisms and, even if such recovery is possible, it could take a number of years to resolve and a number of years thereafter to collect. PG&E Corporation and the Utility have considered certain actions that might be taken to attempt to address liquidity needs of the business in such circumstances, but the inability to recover costs in excess of insurance through increases in rates and by collecting such rates in a timely manner, or any negative assessment by the Utility of the likelihood or timeliness of such recovery and collection, could have a material adverse effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

Litigation and Regulatory Citations in Connection with the Butte Fire

In September 2015, a wildfire (known as the “Butte fire”) ignited and spread in Amador and Calaveras Counties in Northern California. On April 28, 2016, Cal Fire released its report of the investigation of the origin and cause of the wildfire. According to Cal Fire’s report, the fire burned 70,868 acres, resulted in two fatalities, destroyed 549 homes, 368 outbuildings and four commercial properties, and damaged 44 structures.  Cal Fire’s report concluded that the wildfire was caused when a gray pine tree contacted the Utility’s electric line, which ignited portions of the tree and determined that the failure by the Utility and/or its vegetation management contractors, ACRT Inc. and Trees, Inc., to identify certain potential hazards during its vegetation management program ultimately led to the failure of the tree.

Third-Party Claims

On May 23, 2016, individual plaintiffs filed a master complaint against the Utility and its two vegetation management contractors in the Superior Court of California, County of Sacramento.  Subrogation insurers also filed a separate master complaint on the same date.  The California Judicial Council had previously authorized the coordination of all cases in Sacramento County.  As of March 31, 2018, 79 known complaints have been filed against the Utility and its two vegetation management contractors in the Superior Court of California in the Counties of Calaveras, San Francisco, Sacramento, and Amador.  The complaints involve approximately 3,770 individual plaintiffs representing approximately 2,000 households and their insurance companies.  These complaints are part of or are in the process of being added to the two master complaints.  Plaintiffs seek to recover damages and other costs, principally based on the doctrine of inverse condemnation and negligence theory of liability.  Plaintiffs also seek punitive damages.  Prior to March 31, 2018, several plaintiffs dismissed the Utility's two vegetation management contractors from their complaints. The number of individual complaints and plaintiffs may still increase in the future, because the statute of limitations for property damage in connection with the Butte fire has not yet expired. (The statute of limitations for personal injury in connection with the Butte fire has expired.)  The Utility continues mediating and settling cases.

In addition, on April 13, 2017, Cal Fire filed a complaint with the Superior Court of California, County of Calaveras, seeking to recover over $87 million for its costs incurred on the theory that the Utility and its vegetation management contractors were negligent, among other claims.  On July 31, 2017, Cal Fire dismissed its complaint against Trees, Inc., one of the Utility's vegetation contractors. The Utility and Cal Fire are currently engaged in a mediation process.

Further, in May 2017, the OES indicated that it intends to bring a claim against the Utility that it estimates to be approximately $190 million.  This claim would include costs incurred by the OES for tree and debris removal, infrastructure damage, erosion control, and other claims related to the Butte fire.

Also, on February 20, 2018, the County of Calaveras filed suit against the Utility and the Utility’s vegetation management contractors. The County seeks to recover damages and other costs, based on the doctrine of inverse condemnation and negligence theory of liability. The County also seeks punitive damages. It had previously indicated that it intended to bring a claim against the Utility that it estimated to be approximately $85 million. On March 2, 2018, the County served a mediation demand seeking in excess of $167 million. This claim includes costs that the County of Calaveras allegedly incurred or expects to incur for infrastructure damage, erosion control, and other costs related to the Butte fire. The Utility and the County of Calaveras are currently engaged in a mediation process.

On April 28, 2017, the Utility moved for summary adjudication on plaintiffs’ claims for punitive damages.  On August 10, 2017, the Court denied the Utility’s motion on the grounds that plaintiffs might be able to show conscious disregard for public safety based on the fact that the Utility relied on contractors to fulfill their contractual obligation to hire and train qualified employees.  On August 16, 2017, the Utility filed a writ with the Court of Appeal challenging the trial court's ruling on punitive damages.  The Court of Appeal accepted the writ on September 15, 2017, and ordered the trial court and plaintiffs to show cause why the relief requested by the Utility should not be granted.  Briefing on the writ was completed as of January 2, 2018. The Utility sought expedited review of the motion. On April 4, 2018, the Court of Appeal indicated that it is prepared to issue a decision without oral argument. On April 13, 2018 and April 16, 2018, respectively, the plaintiffs and the Utility requested oral argument, which is now scheduled for June 22, 2018.

On June 22, 2017, the Superior Court of California, County of Sacramento ruled on a motion of several plaintiffs and found that the doctrine of inverse condemnation applies to the Utility with respect to the Butte fire. The Court held, among other things, that the Utility had failed to put forth any evidence to support its contention that the CPUC would not allow the Utility to pass on its inverse condemnation liability through rate increases. While the ruling is binding only between the Utility and the plaintiffs in the coordination proceeding at the time of the ruling, others could file lawsuits and make similar claims. On January 4, 2018, the Utility filed with the Court a renewed motion for a legal determination of inverse condemnation liability, citing the November 30, 2017 CPUC decision denying the San Diego Gas & Electric Company application to recover wildfire costs in excess of insurance, and the CPUC declaration that it will not automatically allow utilities to spread inverse condemnation losses through rate increases.

On May 1, 2018, the Court issued its ruling on the Utility's renewed motion in which the Court affirmed, with minor changes, its tentative ruling dated April 25, 2018. The Court determined that it is bound by earlier holdings of two appellate courts decisions, Barham and Pacific Bell. Further, the Court stated that the Utility's constitutional arguments should be made to the appellate courts and suggested that, to the extent the Utility raises the public policy implications of the November 30, 2017 CPUC decision in the San Diego Gas & Electric Company cost recovery proceeding, these arguments should be addressed to the Legislature or CPUC. The next case management conference is scheduled for June 7, 2018. The Utility intends to file a writ seeking review of this decision. No trial date is pending.

Estimated Losses from Third-Party Claims

In connection with this matter, the Utility may be liable for property damages, interest, and attorneys’ fees without having been found negligent, through the doctrine of inverse condemnation. 

In addition, the Utility may be liable for fire suppression costs, personal injury damages, and other damages if the Utility is found to have been negligent.  While the Utility believes it was not negligent, there can be no assurance that a court or jury would agree with the Utility. 

The Utility currently believes that it is probable that it will incur a loss of at least $1.1 billion in connection with the Butte fire.  This amount is based on assumptions about the number, size, and type of structures damaged or destroyed, the contents of such structures, the number and types of trees damaged or destroyed, as well as assumptions about personal injury damages, attorneys’ fees, fire suppression costs, and certain other damages, but does not include punitive damages for which the Utility could be liable.  In addition, while this amount includes the Utility's early assumptions about fire suppression costs (including its assessment of the Cal Fire loss) and the County of Calaveras claim, it does not include any significant portion of the estimated claim from the OES. The Utility still does not have sufficient information to reasonably estimate any liability it may have for that additional claim.

The Utility currently is unable to reasonably estimate the upper end of the range of losses due to uncertainties related to the applicability of inverse condemnation and punitive damages and because it has insufficient information on the claims of over 600 households who have asserted claims, the claim from the OES, as well as claims from any other households that may be brought before the statute of limitations for property damage expires.  The process for estimating costs associated with claims relating to the Butte fire requires management to exercise significant judgment based on a number of assumptions and subjective factors.  As more information becomes known, including additional discovery from the plaintiffs, results from the ongoing mediation and settlement process, review of the potential claim from the OES, outcomes of future court or jury decisions, and information about damages, including punitive damages, for which the Utility could be liable, management estimates and assumptions regarding the financial impact of the Butte fire may result in material increases to the loss accrued.

The following table presents changes in the third-party claims liability since December 31, 2015.  The balance for the third-party claims liability is included in Other current liabilities in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets:
Loss Accrual (in millions)
 
 
Balance at December 31, 2015
 
$

Accrued losses
 
750

Payments (1)
 
(60)

Balance at December 31, 2016
 
690

Accrued losses
 
350

Payments (1)
 
(479)

Balance at December 31, 2017
 
561

Accrued losses
 

Payments (1)
 
(118
)
Balance at March 31, 2018
 
$
443

 
 
 
(1) As of March 31, 2018 the Utility entered into settlement agreements in connection with the Butte fire corresponding to approximately $734 million of which $657 million has been paid by the Utility.

In addition to the amounts reflected in the table above, the Utility has incurred cumulative legal expenses of $99 million in connection with the Butte fire.  For the three months ended March 31, 2018, the Utility incurred legal expenses in connection with the Butte fire of $12 million.

Loss Recoveries

The Utility has liability insurance from various insurers, which provides coverage for third-party liability attributable to the Butte fire in an aggregate amount of $922 million.  The Utility records insurance recoveries when it is deemed probable that a recovery will occur and the Utility can reasonably estimate the amount or its range.  Through March 31, 2018, the Utility recorded $922 million for probable insurance recoveries in connection with losses related to the Butte fire.  While the Utility plans to seek recovery of all insured losses, it is unable to predict the ultimate amount and timing of such insurance recoveries.  In addition, the Utility has received $60 million in cumulative reimbursements from the insurance policies of its vegetation management contractors (excluded from the table below), including $7 million received in the three months ended March 31, 2018.  Recoveries of additional amounts under the insurance policies of the Utility’s vegetation management contractors, including policies where the Utility is listed as an additional insured, are uncertain.

The following table presents changes in the insurance receivable since December 31, 2015.  The balance for the insurance receivable is included in Other accounts receivable in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets:
Insurance Receivable (in millions)
 
 
Balance at December 31, 2015
 
$

Accrued insurance recoveries
 
625

Reimbursements
 
(50)

Balance at December 31, 2016
 
575

Accrued insurance recoveries
 
297

Reimbursements
 
(276)

Balance at December 31, 2017
 
596

Accrued insurance recoveries
 

Reimbursements
 
(197
)
Balance at March 31, 2018
 
$
399


In April 2018, the Utility received another $31 million in insurance reimbursements.

If the Utility records losses in connection with claims relating to the Butte fire that materially exceed the amount the Utility accrued for these liabilities, PG&E Corporation’s and the Utility’s financial condition, results of operations, or cash flows could be materially affected in the reporting periods during which additional charges are recorded.

Regulatory Citations

On April 25, 2017, the SED issued two citations to the Utility in connection with the Butte fire, totaling $8.3 million. The SED's investigation found that neither the Utility nor its vegetation management contractors took appropriate steps to prevent a gray pine tree from leaning and contacting the Utility's electric line, which created an unsafe and dangerous condition that resulted in that tree leaning and making contact with the electric line, thus causing a fire. The Utility paid the citations in June 2017.

Enforcement Matters

In 2014, both the U.S. Attorney's Office in San Francisco and the California Attorney General's office opened investigations into matters related to allegedly improper communication between the Utility and CPUC personnel. The Utility has cooperated with those investigations. It is uncertain whether any charges will be brought against the Utility as a result of these investigations.

Regulatory Proceedings

Order Instituting an Investigation into Compliance with Ex Parte Communication Rules

On April 26, 2018, the CPUC approved the revised proposed decision issued on April 3, 2018, adopting the settlement agreement jointly submitted to the CPUC on March 28, 2017, as modified (the "settlement agreement") by the Utility, the Cities of San Bruno and San Carlos, the ORA, the SED, and TURN.

The decision results in a total penalty of $97.5 million comprised of: (1) a $12 million payment to the California General Fund, (2) forgoing collection of $63.5 million of GT&S revenue requirements for the years 2018 ($31.75 million) and 2019 ($31.75 million), (3) a $10 million one-time revenue requirement adjustment to be amortized in equivalent annual amounts over the Utility’s next GRC cycle (i.e., the GRC following the 2017 GRC), and (4) compensation payments to the Cities of San Bruno and San Carlos in a total amount of $12 million ($6 million to each city).  In addition, the settlement agreement provides for certain non-financial remedies, including enhanced noticing obligations between the Utility and CPUC decision-makers, as well as certification of employee training on the CPUC ex parte communication rules.  Under the terms of the settlement agreement, customers will bear no costs associated with the financial remedies set forth above. The CPUC also ordered a second phase in this proceeding to determine if any of the additional communications that the Utility reported to the CPUC on September 21, 2017 violate the CPUC ex-parte rules.

The Utility is unable to predict the timing and outcome of the second phase in this proceeding.

At March 31, 2018, PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets include a $8 million accrual for a portion of the 2018 GT&S revenue requirement reduction and an accrual of the $24 million payable to the California General Fund and the Cities of San Bruno and San Carlos.  In accordance with accounting rules, adjustments related to revenue requirements are recorded in the periods in which they are incurred.

For more information about the proceeding, see Note 13 of the Notes to the Consolidated Financial Statements in Item 8 of the 2017 Form 10-K.

Natural Gas Transmission Pipeline Rights-of-Way

In 2012, the Utility notified the CPUC and the SED that the Utility planned to complete a system-wide survey of its transmission pipelines in an effort to address a self-reported violation whereby the Utility did not properly identify encroachments (such as building structures and vegetation overgrowth) on the Utility’s pipeline rights-of-way.  The Utility also submitted a proposed compliance plan that set forth the scope and timing of remedial work to remove identified encroachments over a multi-year period and to pay penalties if the proposed milestones were not met.  In March 2014, the Utility informed the SED that the survey had been completed and that remediation work, including removal of the encroachments, was expected to continue for several years. The SED has not addressed the Utility’s proposed compliance plan, and it is reasonably possible that the SED will impose fines on the Utility in the future based on the Utility’s failure to continuously survey its system and remove encroachments.  The Utility is unable to reasonably estimate the amount or range of future charges that could be incurred given the SED’s wide discretion and the number of factors that can be considered in determining penalties.

Potential Safety Citations

The SED periodically audits utility operating practices and conducts investigations of potential violations of laws and regulations applicable to the safety of the California utilities’ electric and natural gas facilities and operations. The CPUC has delegated authority to the SED to issue citations and impose penalties for violations identified through audits, investigations, or self-reports. There are a number of audit findings, as well as other potential violations identified through various investigations and the Utility’s self-reported non-compliance with laws and regulations, on which the SED has yet to act. Under both the gas and electric programs, the SED has discretion whether to issue a penalty for each violation.

If the SED assesses a penalty for a violation, it is required to impose the maximum statutory penalty of $50,000, with an administrative limit of $8 million per citation issued.  The SED may, at its discretion, impose penalties on a daily basis, or on less than a daily basis, for violations that continued for more than one day. The SED also has wide discretion to determine the amount of penalties based on the totality of the circumstances, including such factors as the gravity of the violations; the type of harm caused by the violations and the number of persons affected; and the good faith of the entity charged in attempting to achieve compliance, after notification of a violation. The SED also is required to consider the appropriateness of the amount of the penalty to the size of the entity charged. Historically, the SED has exercised broad discretion in determining whether violations are continuing and the amount of penalties to be imposed. In the past, the SED has imposed fines on the Utility ranging from $50,000 to $16.8 million for violations of electric and natural gas laws and regulations. The CPUC can also open an OII and levy additional fines even after the SED has issued a citation.

The Utility is unable to reasonably estimate the amount or range of future charges as a result of SED investigations or any proceedings that could be commenced in connection with potential violations of electric and natural gas laws and regulations.

Other Matters

PG&E Corporation and the Utility are subject to various claims, lawsuits, and regulatory proceedings that separately are not considered material.  Accruals for contingencies related to such matters (excluding amounts related to the contingencies discussed above under “Enforcement and Litigation Matters”) totaled $89 million at March 31, 2018, and $86 million at December 31, 2017.  These amounts are included in Other current liabilities in the Condensed Consolidated Balance Sheets.  The resolution of these matters is not expected to have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, or cash flows.

Disallowance of Plant Costs

2015 GT&S Rate Case Capital Disallowances

On June 23, 2016, the CPUC approved a final phase one decision in the Utility’s 2015 GT&S rate case. The phase one decision excluded from rate base $696 million of capital spending in 2011 through 2014 in excess of the amount adopted in the prior GT&S rate case. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to an audit overseen by the CPUC staff, with the possibility that the Utility may seek recovery in a future proceeding. Additional charges may be required in the future based on the Utility’s ability to manage its capital spending and on the outcome of the CPUC’s audit of 2011 through 2014 capital spending. Capital disallowances are reflected in operating and maintenance expenses in the Condensed Consolidated Statements of Income. For more information, see Note 13 of the Notes to the Consolidated Financial Statements in Item 8 of the 2017 Form 10-K.

Environmental Remediation Contingencies

The Utility’s environmental remediation liability is primarily included in non-current liabilities on the Condensed Consolidated Balance Sheets and is comprised of the following:
 
Balance at
 
March 31,
 
December 31,
(in millions)
2018
 
2017
Topock natural gas compressor station
$
342

 
$
334

Hinkley natural gas compressor station
144

 
147

Former manufactured gas plant sites owned by the Utility or third parties (1)
329

 
320

Utility-owned generation facilities (other than fossil fuel-fired),
other facilities, and third-party disposal sites
(2)
113

 
115

Fossil fuel-fired generation facilities and sites (3)
157

 
123

Total environmental remediation liability
$
1,085

 
$
1,039

 
 
 
 
(1) Primarily driven by the following sites: Vallejo, San Francisco East Harbor, Napa, and San Francisco North Beach.
(2) Primarily driven by the Shell Pond site.
(3) Primarily driven by the San Francisco Potrero Power Plant.

The Utility’s gas compressor stations, former manufactured gas plant sites, power plant sites, gas gathering sites, and sites used by the Utility for the storage, recycling, and disposal of potentially hazardous substances are subject to requirements issued by the Environmental Protection Agency under the federal Resource Conservation and Recovery Act and/or other federal and state hazardous waste laws.  The Utility has a comprehensive program in place designed to comply with federal, state, and local laws and regulations related to hazardous materials, waste, remediation activities, and other environmental requirements. The Utility assesses and monitors, on an ongoing basis, measures that may be necessary to comply with these laws and regulations and implements changes to its program as deemed appropriate. The Utility’s remediation activities are overseen by the DTSC, several California regional water quality control boards, and various other federal, state, and local agencies.

The Utility’s environmental remediation liability at March 31, 2018, reflects its best estimate of probable future costs associated with its final remediation plans.  Future costs will depend on many factors, including the extent of work necessary to implement final remediation plans and the Utility's time frame for remediation.  The Utility may incur actual costs in the future that are materially different than this estimate and such costs could have a material impact on results of operations, financial condition and cash flows during the period in which they are recorded. At March 31, 2018, the Utility expected to recover $737 million of its environmental remediation liability for certain sites through various ratemaking mechanisms authorized by the CPUC. 

For more information, see Note 13 of the Notes to the Consolidated Financial Statements in Item 8 of the 2017 Form 10-K.

Natural Gas Compressor Station Sites

The Utility is legally responsible for remediating groundwater contamination caused by hexavalent chromium used in the past at the Utility’s natural gas compressor stations. The Utility is also required to take measures to abate the effects of the contamination on the environment.

Topock Site

The Utility’s remediation and abatement efforts at the Topock site are subject to the regulatory authority of the California DTSC and the U.S. Department of the Interior. In November 2015, the Utility submitted its final remediation design to the agencies for approval. The Utility’s design proposes that the Utility construct an in-situ groundwater treatment system to convert hexavalent chromium into a non-toxic and non-soluble form of chromium. On December 21, 2017, the DTSC issued its final environmental impact report. The environmental impact report includes requirements related to conditions of work that have been anticipated or previously required and are accounted for in the current environmental remediation liability. The Utility’s undiscounted future costs associated with the Topock site may increase by as much as $293 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Topock site are expected to be recovered through the HSM, where 90% of the costs are recovered in rates.

Hinkley Site

The Utility has been implementing remediation measures at the Hinkley site to reduce the mass of the chromium plume in groundwater and to monitor and control movement of the plume. The Utility’s remediation and abatement efforts at the Hinkley site are subject to the regulatory authority of the California Regional Water Quality Control Board, Lahontan Region. In November 2015, the California Regional Water Quality Control Board, Lahontan Region adopted a clean-up and abatement order directing the Utility to contain and remediate the underground plume of hexavalent chromium and the potential environmental impacts. The final order states that the Utility must continue and improve its remediation efforts, define the boundaries of the chromium plume, and take other action. Additionally, the final order sets plume capture requirements, requires a monitoring and reporting program, and includes deadlines for the Utility to meet interim cleanup targets. The United States Geological Survey team is currently conducting a background study on the site to better define the chromium plume boundaries. The background study is expected to be finalized in 2019. The Utility’s undiscounted future costs associated with the Hinkley site may increase by as much as $146 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Hinkley site will not be recovered through rates.

Former Manufactured Gas Plants

Former MGPs used coal and oil to produce gas for use by the Utility’s customers in the past. The by-products and residues of this process were often disposed of at the MGPs themselves. The Utility has undertaken a program to manage the residues left behind as a result of the manufacturing process; many of the sites in the program have been addressed. The Utility’s undiscounted future costs associated with MGP sites may increase by as much as $340 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the MGP sites are recovered through the HSM, where 90% of the costs are recovered in rates.

Utility-Owned Generation Facilities and Third-Party Disposal Sites

Utility-owned generation facilities and third-party disposal sites are long-term projects that are undergoing a remediation process. The Utility’s undiscounted future costs associated with Utility-owned generation facilities and third-party disposal sites may increase by as much as $142 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the Utility-owned generation facilities and third-party disposal sites are recovered through the HSM, where 90% of the costs are recovered in rates.

Fossil Fuel-Fired Generation Sites

In 1998 the Utility divested its generation power plant business as part of generation deregulation. Although the Utility has sold its fossil-fueled power plants, the Utility has retained the environmental remediation liability associated with each site. The Utility’s undiscounted future costs associated with fossil fuel-fired generation sites may increase by as much as $106 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the fossil fuel-fired sites will not be recovered through rates.

Nuclear Insurance

The Utility maintains multiple insurance policies through NEIL and European Mutual Association for Nuclear Insurance, covering nuclear or non- nuclear events at the Utility’s two nuclear generating units at Diablo Canyon and the retired Humboldt Bay Unit 3.  If NEIL losses in any policy year exceed accumulated funds, the Utility could be subject to a retrospective assessment.  If NEIL were to exercise this assessment, as of April 1, 2018, the current maximum aggregate annual retrospective premium obligation for the Utility would be approximately $47 million.  If European Mutual Association for Nuclear Insurance losses in any policy year exceed accumulated funds, the Utility could be subject to a retrospective assessment of approximately $3 million, as of April 1, 2018.  For more information about the Utility’s nuclear insurance coverage, see Note 13 of the Notes to the Consolidated Financial Statements in Item 8 of the 2017 Form 10-K. 

Resolution of Remaining Chapter 11 Disputed Claims

Various electricity suppliers filed claims in the Utility’s proceeding filed under Chapter 11 of the U.S. Bankruptcy Code seeking payment for energy supplied to the Utility’s customers between May 2000 and June 2001.  While the FERC and judicial proceedings are pending, the Utility has pursued, and continues to pursue, settlements with electricity suppliers.  The Utility has entered into a number of settlement agreements with various electricity suppliers to resolve some of these disputed claims and to resolve the Utility’s refund claims against these electricity suppliers. Under these settlement agreements, amounts payable by the parties are, in some instances, subject to adjustment based on the outcome of the various refund offset and interest issues being considered by the FERC.  Generally, any net refunds, claim offsets, or other credits that the Utility receives from electricity suppliers either through settlement or through the conclusion of the various FERC and judicial proceedings are refunded to customers through rates in future periods.

At December 31, 2017, the Consolidated Balance Sheets reflected $243 million in net claims within Disputed claims and customer refunds.  There were no significant changes to this balance during the three months ended March 31, 2018. The Utility is uncertain when or how the remaining net disputed claims liability will be resolved.

Tax Matters

PG&E Corporation’s and the Utility’s unrecognized tax benefits may change significantly within the next 12 months due to the resolution of audits.  As of March 31, 2018, it is reasonably possible that unrecognized tax benefits will decrease by approximately $20 million within the next 12 months.  PG&E Corporation and the Utility believe that the majority of the decrease will not impact net income. 
Tax Cuts and Jobs Act of 2017

On December 22, 2017, the U.S. government enacted expansive tax legislation commonly referred to as the Tax Act. Among other provisions, the Tax Act reduces the federal income tax rate from 35% to 21% beginning on January 1, 2018 and eliminated bonus depreciation for utilities. The Tax Act required PG&E Corporation and the Utility to re-measure all existing deferred income tax assets and liabilities to reflect the reduction in the federal tax rate. PG&E Corporation and the Utility recorded reasonable estimates to reflect the impacts of the Tax Act and recorded provisional amounts, in accordance with rules issued by the SEC in Staff Accounting Bulletin No. 118, for the re-measurement of deferred tax balances as of December 31, 2017. There were no material updates to these estimates in the three months ended March 31, 2018.

On March 30, 2018, the Utility submitted to the CPUC PFMs of the CPUC’s final decisions in the Utility’s 2017 GRC, and the 2015 GT&S rate case. Additionally, the Utility submitted updated testimony in connection with the 2019 GT&S rate case.  These submittals reflect the effects of the Tax Act on these rate cases. On an aggregate basis from these submittals, the Utility anticipates an annual reduction to revenue requirements of approximately $325 million starting in 2018, and incremental increases to rate base of approximately $271 million for 2018 (including the impact of the pending private letter ruling advice letter), and $613 million for 2019.  The incremental increases to rate base are due primarily to the elimination of bonus depreciation. The Utility also expects to reflect an annual revenue requirement reduction, starting in 2018, of approximately $125 million from other rate cases, including the TO19 rate case.  The associated rate base increases are approximately $100 million in 2018 and $200 million in 2019. The Utility is unable to predict the timing and outcome of the CPUC decisions in connection with these submittals.

Purchase Commitments

In the ordinary course of business, the Utility enters into various agreements to purchase power and electric capacity; natural gas supply, transportation, and storage; nuclear fuel supply and services; and various other commitments.  At December 31, 2017, the Utility had undiscounted future expected obligations of approximately $44 billion.  (See Note 13 of the Notes to the Consolidated Financial Statements in Item 8 of the 2017 Form 10-K.) The Utility has not entered into any new material commitments during the three months ended March 31, 2018.