XML 56 R17.htm IDEA: XBRL DOCUMENT v3.22.2
Callaway Energy Center
6 Months Ended
Jun. 30, 2022
Nuclear Waste Matters [Abstract]  
CALLAWAY ENERGY CENTER CALLAWAY ENERGY CENTER
See Note 9 – Callaway Energy Center under Part II, Item 8, of the Form 10-K for information regarding spent nuclear fuel recovery, recovery of decommissioning costs, and the nuclear decommissioning trust fund. The fair value of the trust fund for Ameren Missouri’s Callaway Energy Center is reported as “Nuclear decommissioning trust fund” in Ameren’s and Ameren Missouri’s balance sheets. This amount is legally restricted and may be used only to fund the costs of nuclear decommissioning. Changes in the fair value of the trust fund are recorded as an increase or decrease to the nuclear decommissioning trust fund, with an offsetting adjustment to the related regulatory liability. Ameren and Ameren Missouri have recorded an ARO for the Callaway Energy Center decommissioning costs at fair value, which represents the present value of estimated future cash outflows. Annual decommissioning costs of $7 million are included in the costs used to establish electric rates for Ameren Missouri’s customers. Every three years, the MoPSC requires Ameren Missouri to file an updated cost study and funding analysis for decommissioning its Callaway Energy Center. An updated cost study and funding analysis was filed with the MoPSC in November 2020 and reflected within the ARO. In February 2021, the MoPSC approved no change in electric rates for decommissioning costs based on Ameren Missouri’s updated cost study funding analysis. See Note 13 – Supplemental Information for more information on Ameren Missouri’s AROs.
Maintenance Outage
See Note 9 – Callaway Energy Center under Part II, Item 8, of the Form 10-K for information regarding a maintenance outage from a non-nuclear operating issue related to the Callaway Energy Center’s generator in late December 2020 and subsequent return to service on August 4, 2021, along with the related insurance claims. In April 2022, Ameren Missouri received $22 million from NEIL related to lost sales insurance claims.
Insurance
The following table presents insurance coverage at Ameren Missouri’s Callaway Energy Center at June 30, 2022:
Type and Source of CoverageMost Recent
Renewal Date
Maximum CoveragesMaximum Assessments
for Single Incidents
Public liability and nuclear worker liability:
American Nuclear InsurersJanuary 1, 2022$450 $— 
Pool participation(a)13,073 
(a) 
138 
(b) 
$13,523 
(c) 
$138 
Property damage:
NEIL and EMANIApril 1, 2022$3,200 
(d)
$26 
(e) 
Accidental outage:
NEILApril 1, 2022$490 
(f) 
$
(e) 
(a)Provided through mandatory participation in an industrywide retrospective premium assessment program. The maximum coverage available is dependent on the number of United States commercial reactors participating in the program.
(b)Retrospective premium under the Price-Anderson Act. This is subject to retrospective assessment with respect to a covered loss in excess of $450 million in the event of an incident at any licensed United States commercial reactor, payable at $21 million per year.
(c)Limit of liability for each incident under the Price-Anderson liability provisions of the Atomic Energy Act of 1954, as amended. This limit is subject to change to account for the effects of inflation and changes in the number of licensed power reactors.
(d)NEIL provides $2.7 billion in property damage, stabilization, decontamination, and premature decommissioning insurance for radiation events and $2.3 billion in property damage insurance for nonradiation events. EMANI provides $490 million in property damage insurance for both radiation and nonradiation events.
(e)All NEIL-insured plants could be subject to assessments should losses exceed the accumulated funds from NEIL.
(f)Accidental outage insurance provides for lost sales in the event of a prolonged accidental outage. Weekly indemnity up to $4.5 million for 52 weeks, which commences after the first 12 weeks of an outage, plus up to $3.6 million per week for a minimum of 71 weeks thereafter for a total not exceeding the policy limit of $490 million. Nonradiation events are limited to $328 million.
The Price-Anderson Act is a federal law that limits the liability for claims from an incident involving any licensed United States commercial nuclear energy center. The limit is based on the number of licensed reactors. The limit of liability and the maximum potential annual payments are adjusted at least every five years for inflation to reflect changes in the Consumer Price Index. The most recent five-year inflationary adjustment became effective in November 2018. Owners of a nuclear reactor cover this exposure through a combination of private insurance and mandatory participation in a financial protection pool, as established by the Price-Anderson Act.
Losses resulting from terrorist attacks on nuclear facilities insured by NEIL are subject to industrywide aggregates, such that terrorist acts against one or more commercial nuclear power plants within a stated time period would be treated as a single event, and the owners of the nuclear power plants would share the limit of liability. NEIL policies have an aggregate limit of $3.2 billion within a 12-month period for radiation events, or $1.8 billion for events not involving radiation contamination, resulting from terrorist attacks. The EMANI policies are not subject to industrywide aggregates in the event of terrorist attacks on nuclear facilities.
If losses from a nuclear incident at the Callaway Energy Center exceed the limits of, or are not covered by insurance, or if coverage is unavailable, Ameren Missouri is at risk for any uninsured losses. If a serious nuclear incident were to occur, it could have a material adverse effect on Ameren’s and Ameren Missouri’s results of operations, financial position, or liquidity.